Home / Browse projects / Kolhapur, Maharashtra / ANANT RESIDENCY
ANANT RESIDENCY
RG-MH-40751 · RERA P53000048934 · Last updated on MahaRERA portal: 27 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANANT RESIDENCY is a Residential / Group Housing project by Atul Vijaykant Moog in Kolhapur, Maharashtra, registered with MahaRERA as P53000048934 on 24 Jan 2023. Possession is promised by 31 Dec 2027. 24 of the 28 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameANANT RESIDENCY
- TypeResidential / Group Housing
- Location
- Vishal Nagar
- Fulewadi Ring Road
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416012
- Pincode416012
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000048934
- ReraGenie IDRG-MH-40751
Builder
- NameAtul Vijaykant Moog
- Entity typeIndividual
- GSTIN27AIIPM9766D1ZT
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jan 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed92 files
Current status
Figures as on 27 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANANT RESIDENCY | NA | 7 | 6 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
ANANT RESIDENCY: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ANANT RESIDENCY | NA | Rs 4.96 cr | Rs 4.96 cr |
| - | NA | Rs 6.50 lakh | Rs 6.50 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A SQUARE Architects interior and Landscape Designers |
| Architect | A Square Architects, Interiors & Landscape Designers |
| Engineer | Amit Narayan Nayakoji |
| Engineer | Amit Narayan Naykoji |
| Chartered Accountant | Nitish Vandure Patil And Associates |
| Chartered Accountant | Ajay Manglani and Associates |
| Partner | Role in project |
|---|---|
| Atul Vijaykant Moog | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| WP/2093/2014/2014 | Hon ble High Court Mumbai | Admitted |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2 A.pdf | 27 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Sep.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Dec.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 March.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Sep.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Dec.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 March.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Self certification for no withdrawal June.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Dec Final.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 March Final.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June Final.pdf | 21 Aug 2026 |
| Form 5 (FY 2024-2025)File: Moog Form 5.pdf | 1 Dec 2025 |
| Form 1File: ARCHITECT CERTIFICATE.pdf | 18 Jul 2025 |
| Form 2File: ENGINEER CERTIFICATE.pdf | 18 Jul 2025 |
| Form 3File: Self Declaration.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Unsold Units June -2025.pdf | 18 Jul 2025 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf | 18 Jul 2025 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf | 18 Jul 2025 |
| Withdrawal Update Form 3File: Self certification for no withdrawal June.pdf | 18 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed (12).pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 30 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 31-12-24.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Chartered Account Certificate 31-12-2024.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE 30-09-2024.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30-09-2024 .pdf | 20 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 30-09-2024.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 10 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 10 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory.pdf | 10 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self certification for no withdrawal June.pdf | 10 Jul 2024 |
| Building plan approvalFile: Plan.pdf | 28 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf | 28 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 28 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 2 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (6).pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 31-12-2023.pdf | 5 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 5 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE moog.pdf | 5 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self certification for no withdrawal December - 2023.pdf | 5 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 30-09-2023.pdf | 8 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30-09-2023.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Units sep.pdf | 8 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self certification for no withdrawal sep.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Self certification for no withdrawal sep.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Units sep.pdf | 17 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 17 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 30-09-2023.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30-09-2023.pdf | 13 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Certificate for no withdrawal March.pdf | 13 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self certification for no withdrawal June.pdf | 13 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self certification for no withdrawal sep.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE 31-03-2023.pdf | 22 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate Moog Construction.pdf | 22 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate Moog Construction.pdf | 22 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE 31-03-2023.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE 30-06-2023 (1).pdf | 21 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30-06-2023 (1).pdf | 21 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 01-04-023.pdf | 21 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 01-07-2023.pdf | 21 Sep 2023 |
| Proforma of Agreement for saleFile: Format of RERA Agreement to Sale (1)Final.pdf | 17 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 6 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Finance- Moog12202022.pdf | 30 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Finance- Moog12202022.pdf | 30 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate- Moog12202022.pdf | 30 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Moog12302022.pdf | 30 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 30 Dec 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_-Moog.pdf | 30 Dec 2022 |
| Other - TechnicalFile: Drawing Proposed But Not Sanction Municipal with TDR.pdf | 30 Dec 2022 |
| PAN CardFile: PAN- Moog12202022.pdf | 29 Dec 2022 |
| Copy of the legal title reportFile: Legal Title Search Extract12282022_11zon.pdf | 29 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Moog12232022_compressed.pdf | 23 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANANT RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Fulewadi Ring Road880+ in Kolhapur
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
GRUHALAXMI RACHANA
BATU BUILDERS
SRI SRI RESIDENCY
SRI SRI BUILDERS AND DEVELOPERS PROPRIETOR
ONE EARTH
DESHPANDE INFRA
DRONAGIRI
ASHTIN INDIA PVT LTD
JEWEL SQUARE
RATNARAJ BUILDERS AND DEVELOPERS
SAPPHIRE SKY
S.S.Builders and Developers
See every Kolhapur project, with the district possession charts
Builder: Atul Vijaykant Moog
Atul Vijaykant Moog has 2 registrations on MahaRERA, including ARIHANT RESIDENCY and ANANT RESIDENCY. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if ANANT RESIDENCY is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANANT RESIDENCY?
The registered promoter entity is Atul Vijaykant Moog, an individual as per the filing. Its GSTIN 27AIIPM9766D1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANANT RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ANANT RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANANT RESIDENCY?
The professionals named in the filing: Architect: A SQUARE Architects interior and Landscape Designers; Architect: A Square Architects, Interiors & Landscape Designers; Engineer: Amit Narayan Nayakoji; Engineer: Amit Narayan Naykoji; Chartered Accountant: Nitish Vandure Patil And Associates; Chartered Accountant: Ajay Manglani and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANANT RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback