Home / Browse projects / Nagpur, Maharashtra / ANANDAM 8

Registered No litigation declared Plotted project

ANANDAM 8

By RKJ ESTATE PVT LTD

RG-MH-37448 · RERA P50500052319 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedno revision filed
3 of 33Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

ANANDAM 8 is a Plotted project by RKJ ESTATE PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500052319 on 10 Aug 2023. Possession is promised by 13 Jun 2030. 30 of the 33 units on this registration are recorded sold or booked.

At a glance

Project

  • NameANANDAM 8
  • TypePlotted
  • Location
    • NH7
    • RUI KHAIRI
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500052319
  • ReraGenie IDRG-MH-37448

Builder

  • NameRKJ ESTATE PVT LTD
  • Entity typeCompany
  • DirectorsKAPIL VIJAY CHANDAK, VIJAY AYODHYA CHANDAK

Key dates

this monthRegisteredAug 2023PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Aug 2023
  • Promised completion13 Jun 2030
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed89 files

Current status

91%30 of 33 units booked

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,443 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority
Permissible FSI13744.0
Proposed, not sanctioned6,872 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAMDASPETH NAGPUR

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHAWAL SUBHASRAO HARSHE
ArchitectAR SARANG AGRAWAL
Engineerdhawal harshe
EngineerSARANG AGRAWAL
Chartered AccountantRUPAL RATHI
Chartered AccountantRATAN RATHI & CO CA RUPAL MAHESHWARI
Chartered AccountantGAD & ASSOCIATES
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
RKJ ESTATE PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 13 Jun 2030

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ANANDAM 8_FORM-1_JUNE-25.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM-2_JUNE-25[1].pdf19 Apr 2026
Withdrawal Update Form 3File: FORM 3 2025 ANANDAM 8.pdf19 Apr 2026
Withdrawal Update Form 1File: ANANDAM 8_FORM-1_JUNE-25.pdf20 Jan 2026
Withdrawal Update Form 1File: ANANDAM 8_FORM-1_JUNE-25.pdf20 Jan 2026
Withdrawal Update Form 1File: ANANDAM 8_FORM-1_JUNE-25.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2_JUNE-25[1].pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2_JUNE-25[1].pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2_JUNE-25[1].pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 2025 ANANDAM 8.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 2025 ANANDAM 8.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 2025 ANANDAM 8.pdf20 Jan 2026
Withdrawal Update Form 1File: ANANDAM 8_FORM-1_JUNE-25.pdf10 Sep 2025
Withdrawal Update Form 2File: FORM-2_JUNE-25[1].pdf10 Sep 2025
Withdrawal Update Form 3File: FORM 3 2025 ANANDAM 8.pdf10 Sep 2025
Form 1File: ANANDAM 8_FORM-1_SEP-23--.pdf4 Sep 2025
Form 2File: FORM-2_SEP-23[1].pdf4 Sep 2025
Form 3File: FORM-3_ANANDAM_Sep-23_.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD_SEPT-23.pdf4 Sep 2025
Form 1File: ANANDAM 8_FORM-1_DEC-23.pdf4 Sep 2025
Form 2File: FORM-2_DEC-23[1].pdf4 Sep 2025
Form 3File: FORM-3_ANANDAM_Dec-23.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD_DEC-23.pdf4 Sep 2025
Form 1File: ANANDAM 8_FORM-1_MAR-24.pdf4 Sep 2025
Form 2File: FORM-2_MAR-24[1].pdf4 Sep 2025
Form 3File: FORM-3_MAR-24.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD_MARCH-24.pdf4 Sep 2025
Form 1File: ANANDAM 8_FORM-1_JUNE-24.pdf4 Sep 2025
Form 2File: FORM-2_JUNE-24[1].pdf4 Sep 2025
Form 3File: FORM 3 JUNE 2024 ANANDAM 8.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD_JUNE-24.pdf4 Sep 2025
Form 1File: ANANDAM 8_FORM-1_SEP-24.pdf4 Sep 2025
Form 2File: FORM-2_SEP-24[1].pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD_SEPT-24.pdf4 Sep 2025
Form 3File: FORM-3_SEP-24.pdf4 Sep 2025
Form 1File: ANANDAM 8_FORM-1_DEC-24.pdf4 Sep 2025
Form 2File: FORM-2_DEC-24.pdf4 Sep 2025
Form 3File: FORM-3_DEC-24.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD_DEC-24.pdf4 Sep 2025
Form 1File: ANANDAM 8_FORM-1_MAR-25.pdf4 Sep 2025
Form 2File: FORM-2_MAR-25.pdf4 Sep 2025
Form 3File: FORM-3 MAR-25.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD_MARCH-25.pdf4 Sep 2025
Withdrawal Update Form 1File: ANANDAM 8_FORM-1_JUNE-25.pdf4 Sep 2025
Withdrawal Update Form 2File: FORM-2_JUNE-25[1].pdf4 Sep 2025
Withdrawal Update Form 3File: FORM 3 2025 ANANDAM 8.pdf4 Sep 2025
Form 2A (FY 2023-2024)File: FORM 2A 2024(1).pdf4 Sep 2025
Form 2A (FY 2024-2025)File: FORM 2A 2025(1).pdf4 Sep 2025
Form 5 (FY 2023-2024)File: FORM -5 MAR-24.pdf2 Sep 2025
Form 5 (FY 2024-2025)File: FORM -5 MAR-25.pdf2 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_ANANDAM_Sep-23_.pdf4 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_ANANDAM_Dec-23.pdf4 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 04-Aug-2023.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 03-Aug-2023.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 03-Aug-2023.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 03-Aug-2023.pdf3 Aug 2023
Copy of the legal title reportFile: ilovepdf_merged-1-7 (1)_page-0001.pdf31 Jul 2023
Proforma of Allotment letterFile: Adobe Scan 30-Jul-2023.pdf30 Jul 2023
Details of encumbrances concerned to FinanceFile: Adobe Scan 27-Jul-2023 (1).pdf27 Jul 2023
Details of encumbrances concerned to LegalFile: Adobe Scan 27-Jul-2023 (1).pdf27 Jul 2023
CERSAI detailsFile: Adobe Scan 27-Jul-2023 (2).pdf27 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (1).pdf27 Jul 2023
Deviation Report with respect to Allotment letterFile: Adobe Scan 25-Jul-2023 (1).pdf25 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Adobe Scan 25-Jul-2023.pdf25 Jul 2023
Declaration about Commencement CertificateFile: FORMAT D CORRECTED.pdf21 Jul 2023
Details of encumbrances concerned to FinanceFile: encumbrance.pdf18 Jul 2023
Details of encumbrances concerned to LegalFile: encumbrance.pdf18 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: sperate bank account.pdf18 Jul 2023
Declaration about Commencement CertificateFile: CC.pdf16 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Vijay Chandak.pdf16 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A jolly khana.pdf16 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Kapil Chandak.pdf16 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: acc detail.pdf16 Jul 2023
Deviation Report with respect to Allotment letterFile: ALLOT MENT LETTER rera (2).pdf16 Jul 2023
Deviation Report with respect to model copy of AgreementFile: New Format of Agreement FOR RERA.pdf16 Jul 2023
Layout approvalFile: RUIH KHAIRI DWG.pdf15 Jul 2023
Building plan approval or NA orderFile: MZ RUHIKHERI NA ORDER.pdf15 Jul 2023
PAN CardFile: PAN CARD.pdf15 Jul 2023
PAN CardFile: PAN CARD VIJAY CHANDAK INDL.pdf15 Jul 2023
PAN CardFile: PAN CARD KAPIL CHANDAK_compressed (1).pdf15 Jul 2023

How this compares with Nagpur

91%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANDAM 8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RUI KHAIRI2,800+ in Nagpur

2 kmANANDAM 8Completed 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: RKJ ESTATE PVT LTD

RKJ ESTATE PVT LTD has 1 registration on MahaRERA, including ANANDAM 8. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ANANDAM 8 is delayed beyond 13 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANDAM 8?

The registered promoter entity is RKJ ESTATE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANDAM 8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANANDAM 8?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANDAM 8?

The professionals named in the filing: Architect: DHAWAL SUBHASRAO HARSHE; Architect: AR SARANG AGRAWAL; Engineer: dhawal harshe; Engineer: SARANG AGRAWAL; Chartered Accountant: RUPAL RATHI; Chartered Accountant: RATAN RATHI & CO CA RUPAL MAHESHWARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANDAM 8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANDAM 8. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANDAM 8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.