Registered No litigation declared Residential / Group Housing project

Anand Nagar Phase 3

By Anubhavshri Realty Pvt. Ltd.

RG-MH-20231 · RERA P52000007147 · Last updated on MahaRERA portal: 13 Jan 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 96 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 96 months from the original
3 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 60%
36 of 36Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

Anand Nagar Phase 3 is a Residential / Group Housing project by Anubhavshri Realty Pvt. Ltd. in Raigarh, Maharashtra, registered with MahaRERA as P52000007147 on 17 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 96 months from the original filing. 0 of the 36 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameAnand Nagar Phase 3
  • TypeResidential / Group Housing
  • Location
    • NH
    • Lonere
    • Mangaon
    • Raigarh
    • 402104
  • Pincode402104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000007147
  • ReraGenie IDRG-MH-20231

Builder

  • NameAnubhavshri Realty Pvt. Ltd.
  • Entity typeCompany
  • Managing DirectorAnand Jagdishprasad Gupta
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2020Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2020)
  • Buildings2 building records
  • Documents filed56 files

Current status

0%0 of 36 units booked
22.1%Work done, per cost certificate

Figures as on 13 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C-2NA6418018
C-3NA5418018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 60%.

C-226%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C-39%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes20%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered1
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
C-2167
C-3022

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,450 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2025

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE ALIBAGB
Permissible FSI1740.0
Proposed, not sanctioned1,305 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCoral Crest, Plot No 3, Sector 23, near Nerul station, Navi Mumbai - 400706, Maharashtra
Estimated costRs 5.28 cr
Cost incurredRs 1.17 cr
Work done22.1%
BuildingWingEstimatedIncurred
C-2NARs 2.54 crRs 1.02 cr
C-3NARs 2.54 cr-
-NARs 20.12 lakhRs 15.09 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs Preeti Joshi
EngineerMr Manohar Ahstawadhani
Chartered AccountantDharmendra Shrimal
PartnerRole in project
Anubhavshri Realty Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA11082502353Dec 2020 → Dec 2028

Reason as filed by the promoterIn this project, there are 0 sold units, hence consent is not required for this project.Due to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 31/12/2028 to complete the project

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000012472Dattatray Vithoba DivekarRohit Manohar Ashtavadhani18/12/2017
CC006000000022872DARSHANA D DIVEKARRohit Manohar Ashtavadhani12/01/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 JUN 2025.pdf13 Jan 2026
Withdrawal Update Form 1File: FORM 1 JUN 2025.pdf13 Jan 2026
Withdrawal Update Form 1File: FORM 1 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: FORM 2 JUN 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: FORM 2 JUN 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: FORM 2 2025.pdf13 Jan 2026
Withdrawal Update Form 3File: FORM 3 AUG 2025.pdf13 Jan 2026
Withdrawal Update Form 3File: FORM 3 AUG 2025.pdf13 Jan 2026
Withdrawal Update Form 3File: FORM 3 2025.pdf13 Jan 2026
Form 1File: arc (2).pdf11 Aug 2025
Form 2File: engg (2).pdf11 Aug 2025
Form 3File: ca (8).pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: sodl.pdf11 Aug 2025
Form 2A (FY 2020-2021)File: 0 (18).pdf11 Aug 2025
Form 5 (FY 2020-2021)File: 0 (19).pdf11 Aug 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality assurance certificate 2023-2024.pdf2 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf11 Nov 2024
CERSAI detailsFile: CERSAI_Search_Report_200288992223_For_Asset_Based_Search_04_12_2023_13_21_04_895.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Annual Report Anand Ngar phase 3 March 2023 Signed (1).pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate FORM 2A Phase 3 - 2022.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate FORM 2A Phase 3 - 2023.pdf11 Jan 2024
OtherFile: Phase 3 - QPR.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE-2020.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE-2021.pdf30 Sep 2023
Certificates of CA (Form 3)File: Form 3 - Anand Nagar Phase 3- 2018.pdf26 Sep 2023
Certificates of CA (Form 3)File: Form 3 - Anand Nagar Phase 3- 2019.pdf26 Sep 2023
Certificates of CA (Form 3)File: Form 3 - Anand Nagar Phase 3- 2020.pdf26 Sep 2023
Certificates of CA (Form 3)File: Form 3 - Anand Nagar Phase 3-2021.pdf26 Sep 2023
Certificates of CA (Form 3)File: Form 3 - Anand Nagar Phase 3- 2022.pdf26 Sep 2023
Certificates of CA (Form 3)File: Form 3 - Anand Nagar Phase 3- 2022.pdf26 Sep 2023
Certificates of CA (Form 3)File: Form 3 - Anand Nagar Phase 3- 2023.pdf26 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 - Annual Report Anand Ngar phase 3 March 2018 Signed.pdf21 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Annual Report Anand Ngar phase 3 March 2019 Signed.pdf21 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Annual Report Anand Ngar phase 3 March 2020 Signed.pdf21 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Annual Report Anand Ngar phase 3 March 2021 Signed.pdf21 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Annual Report Anand Ngar phase 3 March 2022 Signed.pdf21 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Annual Report Anand Ngar phase 3 March 2023 Signed.pdf21 Sep 2023
Copy of the legal title reportFile: adv_wadkar929.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Phase 3.pdf31 Jul 2017
Certificates of CA (Form 3)File: Anand Nagar - Phase-3 Form 3.pdf31 Jul 2017
Layout approvalFile: B WING.pdf29 Jul 2017
Layout approvalFile: C WING.pdf29 Jul 2017
Building plan approvalFile: IOD CC.pdf29 Jul 2017
PAN CardFile: PAN CARD - AYG REALTY PVT LTD.pdf29 Jul 2017
Copy of the legal title reportFile: SEARCH-AND-TITLE-CLEARANCE--CERTIFICATE page 1-14.pdf29 Jul 2017
Copy of the legal title reportFile: SEARCH-AND-TITLE-CLEARANCE--CERTIFICATE page 15-28.pdf29 Jul 2017
Copy of the legal title reportFile: SEARCH-AND-TITLE-CLEARANCE--CERTIFICATE page 29-42.pdf29 Jul 2017
Copy of the legal title reportFile: SEARCH-AND-TITLE-CLEARANCE--CERTIFICATE page 29-42.pdf29 Jul 2017
Details of encumbrancesFile: SELF DECLARATION REG FINANCIAL ENCUMBRANCES.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: C WING.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: B WING.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD CC.pdf29 Jul 2017
Declaration in FORM BFile: FORM B - PHASE 3.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM I - THIRD PHASE-.pdf29 Jul 2017
Proforma of Allotment letterFile: DECLARATION FOR AGREEMENT OF SALE.pdf29 Jul 2017
OtherFile: DECLARATION FOR AMENITIES.pdf29 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Redevelopment of Residential cum commercial project at Vileparle East known as Anand Amrut dhamTejpal Road Vileparle East Mumbai 40005736CompletedSep 2013Sep 2013

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 96 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anand Nagar Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lonere5,900+ in Raigarh

2 kmAnand Nagar Phase 3Completed 1Lapsed / revoked 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: Anubhavshri Realty Pvt. Ltd.

Anubhavshri Realty Pvt. Ltd. has 5 registrations on MahaRERA, including Anand Nagar Phase 1 and Anand Nagar Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Anand Nagar Phase 3 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anand Nagar Phase 3?

The registered promoter entity is Anubhavshri Realty Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anand Nagar Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Anand Nagar Phase 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Anand Nagar Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anand Nagar Phase 3?

The professionals named in the filing: Architect: Ms Preeti Joshi; Engineer: Mr Manohar Ahstawadhani; Chartered Accountant: Dharmendra Shrimal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anand Nagar Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anand Nagar Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anand Nagar Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.