Anand Kirti Tower

By S R and Shah Developers

RG-MH-23856 · RERA P99000003076 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • 33 complaints at MahaRERA
  • Completion date moved by 66 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 66 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 50%
60 of 114Units unsoldnot recorded sold or booked
33Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

Anand Kirti Tower is a Others project by S R and Shah Developers in Palghar, Maharashtra, registered with MahaRERA as P99000003076 on 4 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 66 months from the original filing. 54 of the 114 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 33 complaints are on record with the regulator.

At a glance

Project

  • NameAnand Kirti Tower
  • TypeOthers
  • Location
    • Dongare
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000003076
  • ReraGenie IDRG-MH-23856

Builder

  • NameS R and Shah Developers
  • Entity typePartnership
  • PartnerMilan Shah

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed106 files

Current status

47%54 of 114 units booked
34.4%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA171610012112
C wingNA11022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 50%.

A wing49%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%
C wing68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
A wing11
C wing11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,297 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation
Permissible FSI6517.65
Proposed, not sanctioned6,518 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No H/11, 1st Floor, Kingston Tower, Opposite Viva College, Virar West
Estimated costRs 16.34 cr
Cost incurredRs 5.62 cr
Work done34.38%
BuildingWingEstimatedIncurred
A wingNARs 8.01 crRs 2.81 cr
C wingNARs 8.01 crRs 2.81 cr
-NARs 32.68 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjay WADE & ASSOCIATES
EngineerS K Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
S R and Shah Developers-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000009813Jun 2021 → Jun 2022

Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and shortage of liquidity in the market. Moreover various private and Government offices have not been working at full strength and the complete supply chain has broken down. It appears that it is going to take a lot of time to normalize the real estate industry.

EXT99000013228Jun 2021 → Dec 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 74.07% allottees for purpose of extension of RERA registration period of the said project.

EXT99000018877Jun 2021 → Dec 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 93.02% allottees for purpose of extension of RERA registration period of the said project.

EA24032620355Jun 2021 → Dec 2026

Reason as filed by the promoterWe, S R And Shah Developers , the promoter of the project Anand Kirti Tower (Registration No. P99000003076) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We sincerely apologize for the delay in completing the project and submitting this request. The delay was caused by a combination of procurement challenges, financial constraints, site-related issues, and a dispute between project partners which affected funding and overall progress. These circumstances were unforeseen and significantly impacted the project timeline. The matters have sin

Complaints filed with MahaRERA33

Case no.ComplainantRespondentFiled
CC006000000023388Ashish Rajkumar BubnaM/s. S.R.& ShahDevelopers20/02/2018
CC006000000058114fatima lodhiaS R and Shah developers22/02/2019
CC006000000058115iqbal lodhiaS R and Shah developers22/02/2019
CC006000000079437Shailesh LakhaniS R and Shah Developers23/05/2019
CC006000000079438Chandrika Dinesh ChowatiaSr & Shah Developers23/05/2019
CC006000000194627S R & Shah DevelopersHetal Devani28/10/2020
CC006000000195227S R and SHAH DevelopersHiren Lakhani18/12/2020
CC006000000195228S R and SHAH DevelopersVinay Gangwani18/12/2020
CC006000000195331S R and SHAH DevelopersSuman Jha23/12/2020
CC006000000195332S R and SHAH DevelopersBalaji Enterprsies and Mr Manish Gupta23/12/2020
CC006000000197809S R and Shah DevelopersMs. Sylvia Vinod Singh30/07/2021
CC006000000197810S R And Shah DevelopersMs. Urmila Ulhas Salvi30/07/2021
CC006000000197830Bhimsen BaggaS R & Shah Developers30/07/2021
CC006000000198304AJAY ASHOK MORES.R AND SHAH DEVELOPERS16/09/2021
CC006000000198607Mr Bhimsen Bagga and Mr Hitanshu Bagga, Partners of S R & Shah DevelopersMr. Milan Kirtikant Shah10/10/2021
CC006000000210324Mrs Urmila Ramkumar UpadhyayS.R and shah Developers through its partners08/03/2022
CC006000000210325Mr Rahul DubeyS.R and shah Developers through its partners08/03/2022
CC006000000364710M/s S. R. Shah DevelopersBharat Ratilal Shah22/03/2023
CC006000000364751M/s S. R. Shah DevelopersShri. Gambhir Kayer Tambe22/03/2023
CC006000000364752M/s S. R. Shah DevelopersSmt.Lima Milan Shah22/03/2023
CC006000000364753M/s S. R. Shah DevelopersAzhar Azim Shaikh22/03/2023
CC006000000364759M/s S. R. Shah DevelopersShri.Rajesh Jayantilal Siddhapura22/03/2023
CC006000000374869M/s S. R. Shah DevelopersShaikh Mohammad Salman Mohammad Ishaque22/03/2023
CC006000000374871M/s S. R. Shah DevelopersShulkumar Shyamnarayan Singh22/03/2023
CC006000000374874M/s S. R. Shah DevelopersRaukit Milan Shah26/03/2023
CC006000000374875M/s S. R. Shah DevelopersMaitry Milan Shah26/03/2023
CC006000000374877M/s S. R. Shah DevelopersDhara Indrakumar Shah26/03/2023
CC006000000374878M/s S. R. Shah DevelopersShri Manish Kirtikant Shah26/03/2023
CC006000000374879M/s S. R. Shah DevelopersHimanshu Ramesh Shah26/03/2023
CC006000000374970M/s S. R. Shah DevelopersVictor Ketan Dabre09/04/2023
CC006000000375031M/s S. R. Shah DevelopersRajan Ramesh Shah09/04/2023
CC006000000375034M/s S. R. Shah DevelopersAjay Chintamani Kini09/04/2023
CC006000000375068M/s S. R. Shah DevelopersHimanshu Ajay Singh09/04/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Anand Kirti Tower as on March 2026.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2 - Anand Kirti Tower as on March 2026.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3 - Anand Kirti Tower as on March 2026.pdf13 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 - Anand Kirti Tower for FY 2024-25.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 - Anand Kirti Tower as on March 2026.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 - Anand Kirti Tower as on March 2026.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3 - Anand Kirti Tower as on March 2026.pdf4 Jun 2026
Withdrawal Update Form 1File: 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf24 Mar 2026
Withdrawal Update Form 1File: 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf24 Mar 2026
Withdrawal Update Form 1File: 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf24 Mar 2026
Withdrawal Update Form 2File: 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf24 Mar 2026
Withdrawal Update Form 2File: 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf24 Mar 2026
Withdrawal Update Form 2File: 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf24 Mar 2026
Withdrawal Update Form 3File: 15 Certificates of CA (Form 3).pdf24 Mar 2026
Withdrawal Update Form 3File: 15 Certificates of CA (Form 3).pdf24 Mar 2026
Withdrawal Update Form 3File: 15 Certificates of CA (Form 3).pdf24 Mar 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Anand Kirti Tower as on Dec 2023.pdf7 Mar 2025
Certificates of CA (Form 3)File: Form 3 - Anand Kirti Tower as on March 2024.pdf3 Mar 2025
Certificates of CA (Form 3)File: Form 3 - Anand Kirti Tower as on June 2024.pdf3 Mar 2025
Certificates of CA (Form 3)File: Form 3 - Anand Kirti Tower as on September 2024.pdf3 Mar 2025
Certificates of CA (Form 3)File: Form 3 - Anand Kirti Tower as on December 2024.pdf3 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Anand Kirti Tower as on March 2024.pdf3 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Anand Kirti Tower as on June 2024.pdf3 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Anand Kirti Tower as on September 2024.pdf3 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Anand Kirti Tower as on December 2024.pdf3 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Anand Kirti Tower for FY 2023-24.pdf3 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf19 Feb 2025
Certificates of CA (Form 3)File: 16 Certificates of CA (Form 3).pdf19 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf19 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of CA (Form 3)File: 15 Certificates of CA (Form 3).pdf20 Jul 2024
Certificates of CA (Form 5)File: Form 5 17-18.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf30 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 11zon_merged-PDF.pdf29 Jan 2024
CERSAI detailsFile: Annexure A Anand Kirti Tower.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Anand Kirti Tower.pdf25 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Anand Kirti.pdf25 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 23 Anand Kirti.pdf22 Jan 2024
Disclosure of sold/ booked inventoryFile: Circular 29 Anand Kirti.pdf22 Jan 2024
Certificates of CA (Form 3)File: Form 3 Dec 23 Anand Kirti.pdf22 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2023.pdf20 Jan 2024
Declaration in FORM BFile: Form B Anand Kirti.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Signed.pdf11 Jan 2024
Certificates of CA (Form 3)File: Form 3 Signed.pdf11 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Signed.pdf11 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on March 2023.pdf11 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 30-06-2022.pdf11 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on March 2023.pdf11 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on June 2023.pdf11 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on September 2023.pdf11 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on September 2023.pdf11 Dec 2023
Certificates of CA (Form 3)File: Form 3 - Anand Kirti Tower - 31-03-2023.pdf11 Dec 2023
Certificates of CA (Form 3)File: Form 3 - Anand Kirti Tower - 30-06-2023.pdf11 Dec 2023
Certificates of CA (Form 3)File: Form 3 - Anand Kirti Tower - 30-09-2023.pdf11 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Anand Kirti Tower FY 22-23.pdf11 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 31-03-2018.pdf7 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 31-03-2019.pdf7 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 31-03-2020.pdf7 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 31-03-2021.pdf7 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 31-12-2021.pdf7 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 31-03-2022.pdf7 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 30-06-2022.pdf7 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 30-09-2022.pdf7 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Anand Kirti Tower as on 31-12-2022.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form 3- Anand Kirti Tower as on 31-03-2018.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form 3- Anand Kirti Tower as on 31-03-2019.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form 3- Anand Kirti Tower as on 31-03-2020.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form 3- Anand Kirti Tower as on 31-03-2021.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form 3- Anand Kirti Tower as on 31-12-2021.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form 3- Anand Kirti Tower as on 31-03-2022.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form 3- Anand Kirti Tower as on 30-06-2022.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form 3- Anand Kirti Tower as on 30-09-2022.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form 3- Anand Kirti Tower as on 31-12-2022.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Anand Kirti 2A 19-20.pdf23 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Anand Kirti 2A 20-21.pdf23 Dec 2022

How this compares with Palghar

47%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 66 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anand Kirti Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dongare3,200+ in Palghar

2 kmAnand Kirti TowerCompleted 66Lapsed / revoked 42Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: S R and Shah Developers

S R and Shah Developers has 1 registration on MahaRERA, including Anand Kirti Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Anand Kirti Tower is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anand Kirti Tower?

The registered promoter entity is S R and Shah Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anand Kirti Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Anand Kirti Tower?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Anand Kirti Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anand Kirti Tower?

The professionals named in the filing: Architect: Ajay WADE & ASSOCIATES; Engineer: S K Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anand Kirti Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anand Kirti Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anand Kirti Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.