Home / Browse projects / Thane, Maharashtra / Anand Homes- Phase 2

Registration lapsed No litigation declared Mixed project

Anand Homes- Phase 2

By M/s. MORYA GROUP

RG-MH-06176 · RERA P51700053225 · Last updated on MahaRERA portal: 13 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Rs 25.00 crore secured on the land, in favour of aditya birla finance limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
18 of 22Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
26 of 139Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

Anand Homes- Phase 2 is a Mixed project by M/s. MORYA GROUP in Thane, Maharashtra, registered with MahaRERA as P51700053225 on 23 Oct 2023. Possession was promised by 1 Jun 2026 and is now 4 months past that date. 113 of the 139 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameAnand Homes- Phase 2
  • TypeMixed
  • Location
    • Mhaskal Road
    • Behind Ganesh Vidya Mandir
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053225
  • ReraGenie IDRG-MH-06176

Builder

  • NameM/s. MORYA GROUP
  • Entity typePartnership
  • PartnerDNYANESHWAR BUDHAJI DALVI
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredOct 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 Oct 2023
  • Promised completion1 Jun 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed107 files

Current status

81%113 of 139 units booked
84.7%Work done, per cost certificate

Figures as on 13 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA8776783
Wing ENA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

Wing B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing E82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed127

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots127
Closed/Covered10
Open Space117
BuildingClosed/CoveredOpen SpaceTotal
Wing B76976
Wing E34851

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,761 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofaditya birla finance limited
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on7 Jul 2025
LandownerVillageDistrict
Morya GroupDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation, Kalyan
Permissible FSI5761.25
Proposed, not sanctioned5,761 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, Shop No 4 5, Ground Floor, Regency Sarwam, Titwala East 421605
Estimated costRs 12.38 cr
Cost incurredRs 10.48 cr
Work done84.7%
BuildingWingEstimatedIncurred
Wing BNARs 6.19 crRs 5.24 cr
Wing ENARs 6.19 crRs 5.24 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Vijay Pandey & Associates
EngineerOmkar V Joshi
Chartered AccountantMohan S Mohite
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
M/s. MORYA GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mar 26.pdf13 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf13 Jun 2026
Withdrawal Update Form 3File: CA Certificate_Mar 26_Phase-2.pdf13 Jun 2026
Withdrawal Update Form 1File: Architect Certificate Phase-2 Sep 25.pdf2 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Phase-2 Dec 25.pdf2 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate Phase 2 Sep 25.pdf2 Apr 2026
Withdrawal Update Form 2File: Engineer Cerificate Phase 2 dec 25.pdf2 Apr 2026
Withdrawal Update Form 3File: CA Certificate_Sep 25.pdf2 Apr 2026
Withdrawal Update Form 3File: CA Cerificate_Dec 25.pdf2 Apr 2026
Withdrawal Update Form 1File: Architect Certificate - Jun 25.pdf24 Sep 2025
Withdrawal Update Form 2File: Engineer Certificate - Jun 25.pdf24 Sep 2025
Withdrawal Update Form 3File: CA Certificate_Jun 25.pdf24 Sep 2025
Form 1File: Architect Certificate - Mar 2025.pdf23 Sep 2025
Form 2File: Engineer Certificate - Mar 2025.pdf23 Sep 2025
Form 3File: CA Certificate_Mar 2025 phase 2.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: 5 Disclosure of Sold Booked Inventory - Mar 2025.pdf23 Sep 2025
Form 1File: Architect Certificate - Dec 23.pdf23 Sep 2025
Form 2File: Engineer Certificate - Dec 23.pdf23 Sep 2025
Form 3File: CA Certificate_Dec 23.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Dec 23.pdf23 Sep 2025
Form 1File: Architect Certificate - Mar 24.pdf23 Sep 2025
Form 2File: Engineer Certificate - Mar 24.pdf23 Sep 2025
Form 3File: CA Certificate_March 24.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Mar 24.pdf23 Sep 2025
Form 1File: Architect Certificate - June 24.pdf23 Sep 2025
Form 2File: Engineer Certificate - June 24.pdf23 Sep 2025
Form 3File: CA Certificate_June 24.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - June 24.pdf23 Sep 2025
Form 1File: Architect Certificate - Sep 24.pdf23 Sep 2025
Form 2File: Engineer Certificate - Sep 24.pdf23 Sep 2025
Form 3File: CA Certificate_Sep 24.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Sep 24.pdf23 Sep 2025
Form 1File: Architect Certificate - Dec 24.pdf23 Sep 2025
Form 2File: Engineer Certificate - Dec 24.pdf23 Sep 2025
Form 3File: CA Certificate_Dec 24.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Dec 24.pdf23 Sep 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a anand homes phase 2.pdf13 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format b anand homes phase 2.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: 1 Disclosure of Sold Booked Inventory - Dec 23.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: 2 Disclosure of Sold Booked Inventory - Mar 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: 3 Disclosure of Sold Booked Inventory - June 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: 4 Disclosure of Sold Booked Inventory - Sep 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: 5 Disclosure of Sold Booked Inventory - Dec 24.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - FY-2023-24.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Dec 23.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Mar 24.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - June 24.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Sep 24.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Dec 24.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Dec 2023_morya phase 2.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_March 2024_morya phase 2.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_June 2024_morya phase 2.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Sep 2024_morya phase 2.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Dec 2024_morya phase 2.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - June 24.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Dec 24.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Sep 24.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Mar 24.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Dec 23.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Audit Report_23-24.pdf6 Feb 2025
Details of encumbrances concerned to FinanceFile: ABFL encumbrance phs 2.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: ABFL encumbrance phs 2.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: ABFL encumbrance phs 2.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: ABFL encumbrance phs 2.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: details of encumbrance 03 with DCB details.pdf19 Feb 2024
Details of encumbrances concerned to LegalFile: details of encumbrance 03 with DCB details.pdf19 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank account declaration.pdf18 Oct 2023
Details of encumbrances concerned to FinanceFile: legal encumbrance.pdf1 Oct 2023
Details of encumbrances concerned to FinanceFile: financial encumbrance.pdf1 Oct 2023
Details of encumbrances concerned to LegalFile: legal encumbrance.pdf1 Oct 2023
Details of encumbrances concerned to LegalFile: financial encumbrance.pdf1 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_compressed (1).pdf1 Oct 2023
Proforma of Agreement for saleFile: Agreement for sale.pdf1 Oct 2023
Deviation Report with respect to model copy of AgreementFile: deviation agreement for sale (1).pdf1 Oct 2023
Proforma of Allotment letterFile: allotment letter.pdf31 Aug 2023
Building plan approval or NA orderFile: Anand Home Revision sheets-1.pdf18 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Anand Home Revision sheets-1.pdf18 Aug 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf17 Aug 2023
Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal.pdf17 Aug 2023
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal.pdf17 Aug 2023

How this compares with Thane

81%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anand Homes- Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Behind Ganesh Vidya Mandir7,600+ in Thane

2 kmAnand Homes- Phase 2Completed 37Lapsed / revoked 23Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: M/s. MORYA GROUP

M/s. MORYA GROUP has 3 registrations on MahaRERA, including ANAND HOME and Anand Homes- Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Anand Homes- Phase 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Anand Homes- Phase 2 is delayed beyond 1 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anand Homes- Phase 2?

The registered promoter entity is M/s. MORYA GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anand Homes- Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anand Homes- Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anand Homes- Phase 2?

The professionals named in the filing: Architect: Ar. Vijay Pandey & Associates; Engineer: Omkar V Joshi; Chartered Accountant: Mohan S Mohite; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anand Homes- Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anand Homes- Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anand Homes- Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.