ANAND HEIGHT WING BAND C
RG-MH-25438 · RERA P99000006290 · Last updated on MahaRERA portal: 12 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 60 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANAND HEIGHT WING BAND C is a Residential / Group Housing project by SHREE ADESHWAR CORPORATION in Palghar, Maharashtra, registered with MahaRERA as P99000006290 on 14 Aug 2017. Possession is promised by 31 Jul 2028. The completion date has moved by 60 months from the original filing. 156 of the 196 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameANAND HEIGHT WING BAND C
- TypeResidential / Group Housing
- Location
- NALASOPRA
- NALASOPARA WEST
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401203
- Pincode401203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000006290
- ReraGenie IDRG-MH-25438
Builder
- NameSHREE ADESHWAR CORPORATION
- Entity typePartnership
- PartnersTEJPRAKASH BHANWARLAL MEHTA, HARSHAD VIDYASAGAR JAIN, AZAD TEJPRAKASH MEHTA, DEVICHAND PUNJALAL JAIN, KAMLESH DILIP JAIN, RAKESH MANGILAL JAIN, RAVINDRA ANANT PATIL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Aug 2017
- Promised completion31 Jul 2028
- Revised completionRevised to 31 Jul 2028 (originally 31 Jul 2023)
- Buildings1 building record
- Documents filed88 files
Current status
Figures as on 12 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANAND HEIGHT WING B AND C | NA | 13 | 12 | 191 | 5 | 196 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.
ANAND HEIGHT WING B AND C: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 74% |
| Sanitary Fittings within the flats / premises | 57% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 74% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 83% |
Progress on shared amenities15
As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ANAND HEIGHT WING B AND C | NA | Rs 22.50 cr | Rs 20.39 cr |
| - | NA | Rs 1.25 cr | Rs 99.40 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANAT MEHTA & ASSOCIATES |
| Engineer | VINAY T SINGH |
| Engineer | Santosh Mata Prasad Mishra |
| Engineer | Qamrul Hasan Khan |
| Chartered Accountant | MARP & ASSOCIATES |
| Chartered Accountant | SHWETA JAIN & CO.LLP |
| Partner | Role in project |
|---|---|
| SHREE ADESHWAR CORPORATION | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterORIGINAL CC DT. 19.07.2012 FOR 7 FLOORS AND WORK CPMLETED REVISED CC DT.14.06.2021 RECEIVED FOR FURTER 5 FLOORS FOR WHICH WORK IS IN PROGRESS.
Reason as filed by the promoterAS PROPOSED CC FOR 12 FLOOR RECEIVED AFTER SO LONG HENCE NEED EXTENTION
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000079232 | MANISH GUPTA | HARSHAD JAIN | 22/02/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Feb 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2028
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 310326 .pdf | 12 May 2026 |
| Withdrawal Update Form 2File: FORM 2 310326.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: FORM 3 310326.pdf | 12 May 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A 310326.pdf | 29 Apr 2026 |
| Building plan approvalFile: 8TH FLOOR PLAN.pdf | 5 Feb 2026 |
| Building plan approvalFile: 9TH 10TH 11TH 12TH 13TH FLOOR PLAN.pdf | 5 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 5 Feb 2026 |
| Withdrawal Update Form 2File: Shree Adeshwar Corporation FORM 2.pdf | 5 Feb 2026 |
| Withdrawal Update Form 3File: form 3 Q3.pdf | 5 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 - 30-6-25.pdf | 25 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 - 30-6-25.pdf | 25 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 -30-9-25_compressed.pdf | 25 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 - 30-6-25.pdf | 23 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 - 30-6-25.pdf | 23 Oct 2025 |
| Withdrawal Update Form 3File: Corporation Form 3_compressed.pdf | 23 Oct 2025 |
| Form 5 (FY 2024-2025)File: SHREE ADESHWAR CORPORATION FORM 5 24-25.pdf | 6 Oct 2025 |
| Form 2A (FY 2024-2025)File: shree adeshwar corp form 2a.pdf | 24 Jun 2025 |
| Form 5 (FY 2023-2024)File: corporation from 5.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: corporation sold unsold.pdf | 21 Jun 2025 |
| Form 3File: Form-3 shree Adeshwar Corporation.pdf | 21 Jun 2025 |
| Form 2File: Shree Adeshwar Corporation (form 2).pdf | 21 Jun 2025 |
| Form 1File: Shree Adeshwar Corporation (form-1).pdf | 21 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form_2 adeshwar corporation.pdf | 22 Apr 2025 |
| Declaration in FORM BFile: corporation from 2B.pdf | 23 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: corporation from 1.pdf | 23 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: corporation from -2.pdf | 23 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: corporation from -2A.pdf | 23 Jul 2024 |
| Certificates of CA (Form 3)File: corporation from 3 ZONE.pdf | 23 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: corporation from 5.pdf | 23 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F1.pdf | 20 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F2.pdf | 20 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 20 Jun 2024 |
| Certificates of CA (Form 3)File: F3 R.pdf | 20 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RE.pdf | 20 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: A.pdf | 20 Jun 2024 |
| Copy of the legal title reportFile: SEARCH TITLE.pdf | 7 Jun 2024 |
| Proforma of Agreement for saleFile: SHREE ADESHWAR CORPORATION- Anand Heights.pdf | 3 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: shree adeshwar corporation Q4.pdf | 14 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CORPORATION FORM -2.pdf | 14 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: shree corporation form 5.pdf | 2 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: shree adeshwar corporation legal encumbrance .pdf | 28 Mar 2024 |
| Details of encumbrances concerned to LegalFile: shree adeshwar corporation legal encumbrance .pdf | 28 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: shree adeshwar corporation allotment letter .pdf | 28 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: shree adeshwar corporation sale agreement .pdf | 28 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: share adeshwar corporation form -2.pdf | 5 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CORPORATION FORM -1 -1.pdf | 20 Dec 2023 |
| Declaration in FORM BFile: FORM B.pdf | 14 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 14 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: new cc 2021.pdf | 2 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-2022.pdf | 28 Apr 2023 |
| Certificates of CA (Form 3)File: FORM 3 CORPORATION.pdf | 27 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CORP RERA FORM.pdf | 17 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate droplet.pdf | 13 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: S A CORPO.pdf | 13 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: corporation disclosure_compressed_compressed_compressed.pdf | 25 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Corporation Form 5 2018-19.pdf | 28 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Corporation Form 5 2019-20.pdf | 28 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Corporation Form 5 2020-21.pdf | 28 May 2022 |
| Declaration about Commencement CertificateFile: Declaration of Commencement Certificate (1).pdf | 24 May 2022 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 24 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CORP NEW CC.pdf | 31 Jul 2021 |
| Certificates of CA (Form 5)File: IMG01-1-1[1].pdf | 15 Oct 2018 |
| Certificates of CA (Form 5)File: jpg2pdf.pdf | 13 Oct 2018 |
| Declaration in FORM BFile: FORM B NOTRY.pdf | 22 Dec 2017 |
| Layout approvalFile: 2017-7-29-14-20-44.pdf | 30 Jul 2017 |
| Building plan approvalFile: 2017-7-29-14-21-42.pdf | 30 Jul 2017 |
| Building plan approvalFile: 2017-7-29-14-23-19.pdf | 30 Jul 2017 |
| Building plan approvalFile: 2017-7-29-14-24-41.pdf | 30 Jul 2017 |
| Building plan approvalFile: 2017-7-29-14-27-28.pdf | 30 Jul 2017 |
| Building plan approvalFile: 2017-7-29-14-26-6.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 2017-7-29-14-20-44.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 2017-7-29-14-21-42.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 2017-7-29-14-23-19.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 2017-7-29-14-24-41.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 2017-7-29-14-26-6.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 2017-7-29-14-27-28.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE.pdf | 30 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: SALE AGREEMENT.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANAND HEIGHT WING BAND C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NALASOPARA WEST3,200+ in Palghar
Filed coordinates, straight-line distance. 183 registered projects within 2 km.
Sheetal Yash
DGS BUILDERS AND DEVELOPERS
DEEP SKYRISE
DEEP REALCON LLP
VIMAL CLASSIC
OM VIMAL DEVELOPERS
DHANANJAY HILL VIEW
DHANLAXMI DEVELOPERS
NAKSHATRA AURIS
RAJLAXMI JSB REALTY LLP
COMFORT HERITAGE
SAI RYDAM REAL ESTATE DEVELOPERS LLP
See every Palghar project, with the district possession charts
Builder: SHREE ADESHWAR CORPORATION
SHREE ADESHWAR CORPORATION has 1 registration on MahaRERA, including ANAND HEIGHT WING BAND C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if ANAND HEIGHT WING BAND C is delayed beyond 31 Jul 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANAND HEIGHT WING BAND C?
The registered promoter entity is SHREE ADESHWAR CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANAND HEIGHT WING BAND C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ANAND HEIGHT WING BAND C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ANAND HEIGHT WING BAND C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANAND HEIGHT WING BAND C?
The professionals named in the filing: Architect: SANAT MEHTA & ASSOCIATES; Engineer: VINAY T SINGH; Engineer: Santosh Mata Prasad Mishra; Engineer: Qamrul Hasan Khan; Chartered Accountant: MARP & ASSOCIATES; Chartered Accountant: SHWETA JAIN & CO.LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANAND HEIGHT WING BAND C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.