Home / Browse projects / Palghar, Maharashtra / ANAND HEIGHT WING BAND C

Registered No litigation declared Residential / Group Housing project

ANAND HEIGHT WING BAND C

By SHREE ADESHWAR CORPORATION

RG-MH-25438 · RERA P99000006290 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedmoved 60 months from the original
4 of 11Construction stages donefurthest along: Staircases, 90%
40 of 196Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

ANAND HEIGHT WING BAND C is a Residential / Group Housing project by SHREE ADESHWAR CORPORATION in Palghar, Maharashtra, registered with MahaRERA as P99000006290 on 14 Aug 2017. Possession is promised by 31 Jul 2028. The completion date has moved by 60 months from the original filing. 156 of the 196 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameANAND HEIGHT WING BAND C
  • TypeResidential / Group Housing
  • Location
    • NALASOPRA
    • NALASOPARA WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000006290
  • ReraGenie IDRG-MH-25438

Builder

  • NameSHREE ADESHWAR CORPORATION
  • Entity typePartnership
  • PartnersTEJPRAKASH BHANWARLAL MEHTA, HARSHAD VIDYASAGAR JAIN, AZAD TEJPRAKASH MEHTA, DEVICHAND PUNJALAL JAIN, KAMLESH DILIP JAIN, RAKESH MANGILAL JAIN, RAVINDRA ANANT PATIL

Key dates

this monthRegisteredAug 2017First promiseJul 2023Revised toJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion31 Jul 2028
  • Revised completionRevised to 31 Jul 2028 (originally 31 Jul 2023)
  • Buildings1 building record
  • Documents filed88 files

Current status

80%156 of 196 units booked
90.0%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANAND HEIGHT WING B AND CNA13121915196

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

ANAND HEIGHT WING B AND C: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises74%
Sanitary Fittings within the flats / premises57%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.74%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.83%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area702 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2025

Approvals and building plan

Sanctioning authorityTOWN PLANNING PALGHAR
Permissible FSI5372.03
Proposed, not sanctioned5,372 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHAYANDER EAST
Estimated costRs 23.75 cr
Cost incurredRs 21.38 cr
Work done90.02%
BuildingWingEstimatedIncurred
ANAND HEIGHT WING B AND CNARs 22.50 crRs 20.39 cr
-NARs 1.25 crRs 99.40 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA & ASSOCIATES
EngineerVINAY T SINGH
EngineerSantosh Mata Prasad Mishra
EngineerQamrul Hasan Khan
Chartered AccountantMARP & ASSOCIATES
Chartered AccountantSHWETA JAIN & CO.LLP
PartnerRole in project
SHREE ADESHWAR CORPORATION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000017267Jul 2023 → Jul 2024

Reason as filed by the promoterORIGINAL CC DT. 19.07.2012 FOR 7 FLOORS AND WORK CPMLETED REVISED CC DT.14.06.2021 RECEIVED FOR FURTER 5 FLOORS FOR WHICH WORK IS IN PROGRESS.

EXT99000024067Jul 2023 → Jul 2028

Reason as filed by the promoterAS PROPOSED CC FOR 12 FLOOR RECEIVED AFTER SO LONG HENCE NEED EXTENTION

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000079232MANISH GUPTAHARSHAD JAIN22/02/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 310326 .pdf12 May 2026
Withdrawal Update Form 2File: FORM 2 310326.pdf12 May 2026
Withdrawal Update Form 3File: FORM 3 310326.pdf12 May 2026
Form 2A (FY 2025-2026)File: FORM 2A 310326.pdf29 Apr 2026
Building plan approvalFile: 8TH FLOOR PLAN.pdf5 Feb 2026
Building plan approvalFile: 9TH 10TH 11TH 12TH 13TH FLOOR PLAN.pdf5 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf5 Feb 2026
Withdrawal Update Form 2File: Shree Adeshwar Corporation FORM 2.pdf5 Feb 2026
Withdrawal Update Form 3File: form 3 Q3.pdf5 Feb 2026
Withdrawal Update Form 1File: FORM 1 - 30-6-25.pdf25 Oct 2025
Withdrawal Update Form 2File: FORM 2 - 30-6-25.pdf25 Oct 2025
Withdrawal Update Form 3File: FORM 3 -30-9-25_compressed.pdf25 Oct 2025
Withdrawal Update Form 1File: FORM 1 - 30-6-25.pdf23 Oct 2025
Withdrawal Update Form 2File: FORM 2 - 30-6-25.pdf23 Oct 2025
Withdrawal Update Form 3File: Corporation Form 3_compressed.pdf23 Oct 2025
Form 5 (FY 2024-2025)File: SHREE ADESHWAR CORPORATION FORM 5 24-25.pdf6 Oct 2025
Form 2A (FY 2024-2025)File: shree adeshwar corp form 2a.pdf24 Jun 2025
Form 5 (FY 2023-2024)File: corporation from 5.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: corporation sold unsold.pdf21 Jun 2025
Form 3File: Form-3 shree Adeshwar Corporation.pdf21 Jun 2025
Form 2File: Shree Adeshwar Corporation (form 2).pdf21 Jun 2025
Form 1File: Shree Adeshwar Corporation (form-1).pdf21 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form_2 adeshwar corporation.pdf22 Apr 2025
Declaration in FORM BFile: corporation from 2B.pdf23 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: corporation from 1.pdf23 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: corporation from -2.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: corporation from -2A.pdf23 Jul 2024
Certificates of CA (Form 3)File: corporation from 3 ZONE.pdf23 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: corporation from 5.pdf23 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F1.pdf20 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F2.pdf20 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf20 Jun 2024
Certificates of CA (Form 3)File: F3 R.pdf20 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RE.pdf20 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: A.pdf20 Jun 2024
Copy of the legal title reportFile: SEARCH TITLE.pdf7 Jun 2024
Proforma of Agreement for saleFile: SHREE ADESHWAR CORPORATION- Anand Heights.pdf3 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: shree adeshwar corporation Q4.pdf14 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CORPORATION FORM -2.pdf14 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: shree corporation form 5.pdf2 Apr 2024
Details of encumbrances concerned to FinanceFile: shree adeshwar corporation legal encumbrance .pdf28 Mar 2024
Details of encumbrances concerned to LegalFile: shree adeshwar corporation legal encumbrance .pdf28 Mar 2024
Deviation Report with respect to Allotment letterFile: shree adeshwar corporation allotment letter .pdf28 Mar 2024
Deviation Report with respect to model copy of AgreementFile: shree adeshwar corporation sale agreement .pdf28 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: share adeshwar corporation form -2.pdf5 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CORPORATION FORM -1 -1.pdf20 Dec 2023
Declaration in FORM BFile: FORM B.pdf14 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf14 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: new cc 2021.pdf2 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-2022.pdf28 Apr 2023
Certificates of CA (Form 3)File: FORM 3 CORPORATION.pdf27 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CORP RERA FORM.pdf17 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate droplet.pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: S A CORPO.pdf13 Apr 2023
Disclosure of sold/ booked inventoryFile: corporation disclosure_compressed_compressed_compressed.pdf25 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Corporation Form 5 2018-19.pdf28 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Corporation Form 5 2019-20.pdf28 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Corporation Form 5 2020-21.pdf28 May 2022
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate (1).pdf24 May 2022
CERSAI detailsFile: CERSAI Declaration.pdf24 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CORP NEW CC.pdf31 Jul 2021
Certificates of CA (Form 5)File: IMG01-1-1[1].pdf15 Oct 2018
Certificates of CA (Form 5)File: jpg2pdf.pdf13 Oct 2018
Declaration in FORM BFile: FORM B NOTRY.pdf22 Dec 2017
Layout approvalFile: 2017-7-29-14-20-44.pdf30 Jul 2017
Building plan approvalFile: 2017-7-29-14-21-42.pdf30 Jul 2017
Building plan approvalFile: 2017-7-29-14-23-19.pdf30 Jul 2017
Building plan approvalFile: 2017-7-29-14-24-41.pdf30 Jul 2017
Building plan approvalFile: 2017-7-29-14-27-28.pdf30 Jul 2017
Building plan approvalFile: 2017-7-29-14-26-6.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 2017-7-29-14-20-44.pdf30 Jul 2017
Building Plan Approval (IOD)File: 2017-7-29-14-21-42.pdf30 Jul 2017
Building Plan Approval (IOD)File: 2017-7-29-14-23-19.pdf30 Jul 2017
Building Plan Approval (IOD)File: 2017-7-29-14-24-41.pdf30 Jul 2017
Building Plan Approval (IOD)File: 2017-7-29-14-26-6.pdf30 Jul 2017
Building Plan Approval (IOD)File: 2017-7-29-14-27-28.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf30 Jul 2017
Proforma of Allotment letterFile: SALE AGREEMENT.pdf30 Jul 2017

How this compares with Palghar

80%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 60 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANAND HEIGHT WING BAND C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALASOPARA WEST3,200+ in Palghar

2 kmANAND HEIGHT WING BAND CCompleted 41Lapsed / revoked 30Other 112Dot size: filed unitsN

Filed coordinates, straight-line distance. 183 registered projects within 2 km.

Builder: SHREE ADESHWAR CORPORATION

SHREE ADESHWAR CORPORATION has 1 registration on MahaRERA, including ANAND HEIGHT WING BAND C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if ANAND HEIGHT WING BAND C is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANAND HEIGHT WING BAND C?

The registered promoter entity is SHREE ADESHWAR CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANAND HEIGHT WING BAND C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANAND HEIGHT WING BAND C?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANAND HEIGHT WING BAND C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANAND HEIGHT WING BAND C?

The professionals named in the filing: Architect: SANAT MEHTA & ASSOCIATES; Engineer: VINAY T SINGH; Engineer: Santosh Mata Prasad Mishra; Engineer: Qamrul Hasan Khan; Chartered Accountant: MARP & ASSOCIATES; Chartered Accountant: SHWETA JAIN & CO.LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANAND HEIGHT WING BAND C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANAND HEIGHT WING BAND C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANAND HEIGHT WING BAND C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.