Home / Browse projects / Nagpur, Maharashtra / Anand Forest
Anand Forest
By WHITEPANDA REALITIES PRIVATE LIMITED
RG-MH-42398 · RERA P50500051725 · Last updated on MahaRERA portal: 7 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Anand Forest is a Residential / Group Housing project by WHITEPANDA REALITIES PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500051725 on 27 Jun 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date.
At a glance
Project
- NameAnand Forest
- TypeResidential / Group Housing
- Location
- BESA ROAD
- BESA
- Ghogali
- Nagpur (Rural)
- Nagpur
- 440034
- Pincode440034
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500051725
- ReraGenie IDRG-MH-42398
Builder
- NameWHITEPANDA REALITIES PRIVATE LIMITED
- Entity typeCompany
- DirectorsSUMIT RAJKUMAR JAWALE, SARANG SANJAYRAO JAWALE, PANKAJ VITTHALRAO SHRIRAO, SKYLAB ANAND BHANARE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Jun 2023
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings6 building records
- Documents filed104 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUNGLOW NO 1 | NA | 4 | 0 | 0 | 0 | 0 |
| BUNGLOW 2 TO 13 | NA | 4 | 0 | 0 | 0 | 0 |
| BUNGLOW NO 14 | NA | 4 | 0 | 0 | 0 | 0 |
| BUNGLOW NO 15 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGLOW NO 16 TO 23 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGLOW NO 24 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 50%.
BUNGLOW NO 149%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGLOW 2 TO 1350%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGLOW NO 1439%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGLOW NO 1529%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGLOW NO 16 TO 2334%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGLOW NO 2432%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 5% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUNGLOW NO 1 | 1 | 0 | 1 |
| BUNGLOW 2 TO 13 | 12 | 0 | 12 |
| BUNGLOW NO 14 | 1 | 0 | 1 |
| BUNGLOW NO 15 | 0 | 1 | 1 |
| BUNGLOW NO 16 TO 23 | 0 | 8 | 8 |
| BUNGLOW NO 24 | 0 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| WHITEPANDA REALITIES PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: wpr form 1 march 2026 (1).pdf | 7 May 2026 |
| Form 2File: WPR Form 2 March 2026 (1).pdf | 7 May 2026 |
| Form 3File: wpr form 3 final.pdf | 7 May 2026 |
| Disclosure of Sold and Booked InventoryFile: WPR sold unsold inventory.pdf | 7 May 2026 |
| Form 1File: Form1.pdf | 28 Feb 2026 |
| Form 2File: Form2.pdf | 28 Feb 2026 |
| Form 3File: Form3.pdf | 28 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold Inventory Q 3.pdf | 28 Feb 2026 |
| Form 1File: WPR form 1 quarter 2.pdf | 24 Jul 2025 |
| Form 2File: WPR form 2 quarter 2.pdf | 24 Jul 2025 |
| Form 3File: whitepanda realities form 3.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: WPR sold unsold inventory 2 quarter 25.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wpr Form 1 1st quarter 2025 (1).pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOC-20250422-WA0004.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: wpr Form 2 1st quarter 2025.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: wpr inventory 1st quarter 2025.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: WPR sold unsold inventory.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: anand forest rera सर्टिफिकेट (1).pdf | 25 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: whitepanda realties Form 5.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner 23-Jan-2025 01-27 PM.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 QUARTER4 2024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 3Q23.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificate 1st quarter 2024.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3arch certificate 2nd quarter 2024.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Arch certificate 1st quarter 2023.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch certificate 3rd quarter 2024.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 ca certificate 4th quarter 2023.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOC-20241026-WA0019.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 ca certificate 2nd quarter 2024.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 ca certificate 1st quarter 2024.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 ca certificate 3rd quarter 2023.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 eng certificate 3rd quarter 2023.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 eng certificate 4th quarter 2023.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 eng certificate 1st quarter 2024.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 eng certificate 2nd quarter 2024.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate 3rd quarter 2024.pdf | 26 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventory 3rd quarter 2024.pdf | 26 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 13 FORM 5 2022-23.pdf | 26 Oct 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: WPRPL account Details.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QUARTER 2 2023.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QUARTER 4 2023.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QUARTER 2 2023.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QUARTER 1 2024.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QUARTER 2 2024.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QUARTER1 2023.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QUARTER 2 2023.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QUARTER 4 2023.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QUARTER 2 2024.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY CERTIFICATE 2022-2023.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A QUALITY CERTIFICATE 2023-2024.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory 1st quarter 2023.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: inventory 2nd quarter 2023.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory 4th quarter 2023.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory 1st quarter 2024.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory 2nd quarter 2024.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2 ND QUARTER 2023.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 4TH QUARTER 2023.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2 ND QUARTER 2024.pdf | 22 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: WHITEPANDA AUDIT REPORT 21-22.pdf | 22 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AUDIT REPORT 22-23.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: certificate WhitePanda.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate for RERA Form 2.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 17 Apr 2024 (1).pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30sep 2023.pdf | 27 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30sep 2023.pdf | 27 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Annexrure 29 30sep2023.pdf | 27 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30sep2023.pdf | 27 Nov 2023 |
| CERSAI detailsFile: CERSAI REPORT 14-06-2023.pdf | 14 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1_Disclosure of interest Atul Shrirao.pdf | 9 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 2_Disclosure of interest Skylab Bhanare.pdf | 9 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 3_Disclosure of interest Sumit Jawale.pdf | 9 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 4_Disclosure of interest Sarang Jawale.pdf | 9 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5_Disclosure of interest Pankaj Shrirao.pdf | 9 Jun 2023 |
| Proforma of Agreement for saleFile: 1 ATS_FINAL.pdf | 19 May 2023 |
| Details of encumbrances concerned to FinanceFile: 10_Financial encumberance certificate.pdf | 17 May 2023 |
| Details of encumbrances concerned to FinanceFile: 11_Legal and litigation encumbeance certificate.pdf | 17 May 2023 |
| Details of encumbrances concerned to LegalFile: 10_Financial encumberance certificate.pdf | 17 May 2023 |
| Details of encumbrances concerned to LegalFile: 11_Legal and litigation encumbeance certificate.pdf | 17 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 8_Circular_32_Commencement certificate white panda 29(2)(A).pdf | 17 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Anand Forest on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BESA2,800+ in Nagpur
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
BHEDE NAGARI -CHARITON
DILIP GANPATRAO BHEDE
Godrej Orchard Estate
Godrej Properties Limited
MELBOURNE CITY
M/S 4 PILLARS REALTY
GARDEN HOMES ATHARVA NAGARI VII
ATHARVA INFRASTRUCTURES
ROYAL EMPIRE
M B INFRA
Ved Vidhi Ventures
Ved Vidhi Ventures
See every Nagpur project, with the district possession charts
Builder: WHITEPANDA REALITIES PRIVATE LIMITED
WHITEPANDA REALITIES PRIVATE LIMITED has 1 registration on MahaRERA, including Anand Forest. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that Anand Forest shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Anand Forest is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Anand Forest?
The registered promoter entity is WHITEPANDA REALITIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Anand Forest?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Anand Forest?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Anand Forest?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.