Home / Browse projects / Nashik, Maharashtra / Amrutdhara Housing Complex Phase - II

Registered No litigation declared Residential / Group Housing project

Amrutdhara Housing Complex Phase - II

By Radheya Constructions & Developers Proprietor Ravi Raghunath Mahajan

RG-MH-15156 · RERA P51600034278 · Last updated on MahaRERA portal: 7 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Amrutdhara Housing Complex Phase - II is a Residential / Group Housing project by Radheya Constructions & Developers Proprietor Ravi Raghunath Mahajan in Nashik, Maharashtra, registered with MahaRERA as P51600034278 on 30 Mar 2022. Possession is promised by 30 Apr 2029.

At a glance

Project

  • NameAmrutdhara Housing Complex Phase - II
  • TypeResidential / Group Housing
  • Location
    • Shree Shree Ravi Shankar Road
    • Indiranagar East
    • Nashik (M Corp.)
    • Nashik
    • 422008
  • Pincode422008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600034278
  • ReraGenie IDRG-MH-15156

Builder

  • NameRadheya Constructions & Developers Proprietor Ravi Raghunath Mahajan
  • Entity typeOthers
  • Named personRavi Raghunath Mahajan
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2022PromisedApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Mar 2022
  • Promised completion30 Apr 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Amrutdhara Housing Complex Phase- II Wing E, F and GNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Amrutdhara Housing Complex Phase- II Wing E, F and G: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed312

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots312
Closed/Covered116
Open Space196

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,962 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI23674.71
Proposed, not sanctioned11,397 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSatpur Industrial Area Traymbak Road Satpur Nashik

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Bagul
EngineerUmesh Joshi J W Consultants
EngineerVishal Kaklij
Chartered AccountantPrasad Bhatt
Chartered AccountantPratik Parnerkar and Associates
PartnerRole in project
Radheya Constructions & Developers Proprietor Ravi Raghunath Mahajan-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amrutdhara phase 2 Architect.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Amrutdhara Phase II Disclousure.PDF7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amru Phase II form 3 Sept 2024.PDF26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amru Phase II form 3 Dec 2024.PDF26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Phase -II Sept 24.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Phase -II Dec 24.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amrutdhara phase 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory Amrutdhara Phase II.pdf10 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Amrutdhara Phase II Form 5.PDF22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amrutdhara phase 2.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Amrutdhara Phase 2.PDF19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate -Amrutdhara Phase 2.PDF19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amrutdhara phase 2.pdf11 Jul 2024
Disclosure of sold/ booked inventoryFile: Amrutdhara Phase 2 Disclosure.PDF11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amrutdhara phase 2.pdf17 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Amrutdhara Phase 2 Quality Assurance.PDF6 Apr 2024
Disclosure of sold/ booked inventoryFile: Amrutdhara Phase II Disclosure of Sold Inventory.PDF6 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: From 5 Amrutdhara Phase 2 - 2022-2023.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect cetrtificate amrutdhara phase 2.pdf10 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eng cer 2A Amrutdhara Phase 2.PDF6 Jan 2024
Disclosure of sold/ booked inventoryFile: Amrutdhara Phase 2 Sold inventor.PDF6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 2 Architect Cert Sept 2023.pdf9 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Phase 2 2A Quality Asu Amrutdhara Sep 2023.pdf9 Nov 2023
Disclosure of sold/ booked inventoryFile: Phase 2 Sold Unsol Sept 2023.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3Annexture-D - Amrutdhara -II.pdf28 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 - Amrutdhara Phase 2.PDF15 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech - Phase II.pdf15 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Amrutdhara P-II - Form 2 A - March-23.pdf15 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engi Certif - PHASE - II.PDF15 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Phase 2.pdf15 Feb 2023
Proforma of Agreement for saleFile: Amrutdhara - Revise Draft.pdf15 Feb 2023
PAN CardFile: CA Certificate.PDF4 Feb 2023
PAN CardFile: Pan Card - Ravi Mahajan.PDF4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate.PDF4 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amrutdhara phase 2.pdf24 Jan 2023
Disclosure of sold/ booked inventoryFile: Amrutdhara Housing Complex Phase -2.PDF24 Jan 2023
Copy of the legal title reportFile: Title S No 82.PDF27 Mar 2022
Details of encumbrancesFile: Encumbrance Phase II.PDF27 Mar 2022
Layout approvalFile: Sheet 1.pdf23 Mar 2022
Building plan approvalFile: Sheet 1.pdf23 Mar 2022
Building plan approvalFile: Sheet 2.pdf23 Mar 2022
Building plan approvalFile: Sheet 3.pdf23 Mar 2022
Building plan approvalFile: Sheet 4.pdf23 Mar 2022
Building plan approvalFile: Sheet 5.pdf23 Mar 2022
Building plan approvalFile: Sheet 6.pdf23 Mar 2022
Building plan approvalFile: Sheet 7.pdf23 Mar 2022
Copy of Layout Approval (in case of layout)File: Sheet 1.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 1.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 3.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 4.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 5.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 6.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 7.pdf23 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Mar 2022
Declaration about Commencement CertificateFile: Declaration Phase II.PDF23 Mar 2022
Declaration in FORM BFile: FORM B.PDF23 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PHASE 2.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Phase II New.PDF23 Mar 2022
CERSAI detailsFile: MERGED CERSAI REPORT PHASE 2.pdf23 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Phase 2_compressed.pdf23 Mar 2022
Proforma of Allotment letterFile: ALLOTMENT-LETTER.pdf23 Mar 2022
Proforma of Allotment letterFile: Agreement of Sale - Draft.pdf23 Mar 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Amrapali TowerNashik88CompletedMar 2014Feb 2014

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amrutdhara Housing Complex Phase - II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Indiranagar East4,100+ in Nashik

2 kmAmrutdhara Housing ComplCompleted 154Lapsed / revoked 39Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: Radheya Constructions & Developers Proprietor Ravi Raghunath Mahajan

Radheya Constructions & Developers Proprietor Ravi Raghunath Mahajan has 3 registrations on MahaRERA, including Amrutdhara Housing Complex Phase - I and Amrutdhara Housing Complex Phase - II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Amrutdhara Housing Complex Phase - II is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amrutdhara Housing Complex Phase - II?

The registered promoter entity is Radheya Constructions & Developers Proprietor Ravi Raghunath Mahajan, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amrutdhara Housing Complex Phase - II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amrutdhara Housing Complex Phase - II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amrutdhara Housing Complex Phase - II?

The professionals named in the filing: Architect: Umesh Bagul; Engineer: Umesh Joshi J W Consultants; Engineer: Vishal Kaklij; Chartered Accountant: Prasad Bhatt; Chartered Accountant: Pratik Parnerkar and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amrutdhara Housing Complex Phase - II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amrutdhara Housing Complex Phase - II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amrutdhara Housing Complex Phase - II to a free account