ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Amrut Jewels

Registered No litigation declared Residential / Group Housing project

Amrut Jewels

By Mukesh Karman Arethia

RG-MH-36712 · RERA PR1270002501590 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
1 of 10Construction stages donefurthest along: Plinth, 90%
156 of 156Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 14 documents Report an error

Amrut Jewels is a Residential / Group Housing project by Mukesh Karman Arethia in Raigarh, Maharashtra, registered with MahaRERA as PR1270002501590 on 27 Nov 2025. Possession is promised by 31 Dec 2031. 0 of the 156 units on this registration are recorded sold or booked, and 1 of 10 construction stages are filed complete.

At a glance

Project

  • NameAmrut Jewels
  • TypeResidential / Group Housing
  • Location
    • Sector - 8
    • Dapoli -Pushpak Nagar
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1270002501590
  • ReraGenie IDRG-MH-36712

Builder

  • NameMukesh Karman Arethia
  • Entity typeProprietor
  • GSTIN27AZBPA4819R1Z1

Key dates

this monthRegisteredNov 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Nov 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed14 files

Current status

0%0 of 156 units booked
4.0%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Amrut JewelsNA141214610156

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 10 construction stages are filed complete. The stage furthest along is Plinth, at 90%.

Amrut Jewels: 19% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed193

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots193
Stilt / Ground55
Podiums / Upper Parking Floor138

Land and ownership15

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,090 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Sep 2025
LandownerVillageDistrict
Santosh Pandharinath PatilPargaonRaigarh
Janabai Pandharinath PatilPargaonRaigarh
Pritam Prakash MaliPargaonRaigarh
Sarika Girish PatilPargaonRaigarh
Karuna Sukesh PowalePargaonRaigarh
Vidya Sameer MhatrePargaonRaigarh
Raghunath Paus PatilPargaonRaigarh
Ram Baburao PatilPargaonRaigarh
Yamuna Dasharath KaduPargaonRaigarh
Changuna Madan ParingePargaonRaigarh
Laxman Baburao PatilPargaonRaigarh
Laxmi Vilas MhatrePargaonRaigarh
Gajanan Baburao PatilPargaonRaigarh
Ravindra Baburao PatilPargaonRaigarh
Bayobai Shankar MhatrePargaonRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI8407.82
Proposed, not sanctioned8,408 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVARDHMAN CHAMBERS CO-OPERATIVE HOUSING SOCIETY LTD.SHOP NO.5 TO 7 & 11, PLOT NO.84, VASHI SECTOR - 17, NAVI MUMBAI
Estimated costRs 30.00 cr
Cost incurredRs 1.18 cr
Work done3.95%
BuildingWingEstimatedIncurred
Amrut JewelsNARs 28.50 crRs 1.18 cr
-NARs 1.50 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSK Associates
EngineerB S S
EngineerS K Consultants & Engineers
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Gyana Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Sep 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed14

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Amrut Jewels as on June 2026.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2 - Amrut Jewels as on June 2026.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3 - Amrut Jewels as on June 2026.pdf14 Jul 2026
Withdrawal Update Form 1File: Form 1 - Amrut Jewels as on March 2026.pdf10 May 2026
Withdrawal Update Form 1File: Form 1 - Amrut Jewels as on Dec 2025.pdf10 May 2026
Withdrawal Update Form 2File: Form 2 - Amrut Jewels as on March 2026.pdf10 May 2026
Withdrawal Update Form 2File: Form 2 - Amrut Jewels as on Dec 2025.pdf10 May 2026
Withdrawal Update Form 3File: Form 3 - Amrut Jewels as on March 2026.pdf10 May 2026
Withdrawal Update Form 3File: Form 3 of Amrut Jewels - 31st December 2025.pdf10 May 2026
Declaration and undertaking (Annexure A)File: Annexure A -Order 50.pdf29 Sep 2025
Building plan approvalFile: Approved Plan 2 -4.pdf27 Sep 2025
Building plan approvalFile: Approved Plan 5 -7.pdf27 Sep 2025
Building plan approvalFile: Approved Plan 8 -10.pdf27 Sep 2025
Layout approvalFile: Approved Layout Page 1.pdf26 Sep 2025

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amrut Jewels on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dapoli -Pushpak Nagar5,900+ in Raigarh

2 kmAmrut JewelsCompleted 10Lapsed / revoked 14Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 133 registered projects within 2 km.

Builder: Mukesh Karman Arethia

Mukesh Karman Arethia has 1 registration on MahaRERA, including Amrut Jewels. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Amrut Jewels is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amrut Jewels?

The registered promoter entity is Mukesh Karman Arethia, a proprietor as per the filing. Its GSTIN 27AZBPA4819R1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amrut Jewels?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amrut Jewels?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amrut Jewels?

The professionals named in the filing: Architect: SK Associates; Engineer: B S S; Engineer: S K Consultants & Engineers; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amrut Jewels?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amrut Jewels. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amrut Jewels to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.