ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / AMRITHA ENCLAVE

Registration approved No litigation declared Mixed Development project

AMRITHA ENCLAVE

By AMRITHA BUILDERS & DEVELOPERS

RG-KA-35126 · RERA PRM/KA/RERA/1257/334/PR/180823/006186 · Last updated on RERA Karnataka portal: 13 Aug 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 81 documents Report an error

AMRITHA ENCLAVE is a Mixed Development project by AMRITHA BUILDERS & DEVELOPERS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/180823/006186 on 18 Aug 2023. Possession is promised by 30 Jun 2024.

At a glance

Project

  • NameAMRITHA ENCLAVE
  • TypeMixed Development
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/180823/006186
  • ReraGenie IDRG-KA-35126

Builder

  • NameAMRITHA BUILDERS & DEVELOPERS
  • Entity typeProprietorship
  • GSTIN29AJTPB0053A3ZL
  • Authorized SignatoryBALAKRISHNA BHANDARY

Key dates

this monthRegisteredAug 2023PromisedJun 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Aug 2023
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMRITHA ENCLAVE-----21

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 13 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
BALAKRISHNA BHANDARY--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.58 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.25 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 12.00 lakh-
On-site expenditure-Consultants FeesRs 11.25 lakh-
Payment of taxesRs 5.00 lakh-
ADMINISTRATIVE COSTRs 4.80 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJEEV S
EngineerRAJEEV S
Chartered AccountantCA. MB Rama Bhat

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed81

As listed on the registration, under the names the promoter filed them with; the newest 80 of 81 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/180823/006186 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
release deed or NOC form sri gurupura vyavasaya seva sahakari bank for mortgage dated 18-11-2022File: RELEASE LETTER.jpeg13 Aug 2023
village map showing the proposed site.File: VILLAGE MAP.jpeg13 Aug 2023
self-attested copy of the Engineer's license certificate.File: SELF ATTESTED ENGR CERTIFICATE.jpeg13 Aug 2023
CARPET AREAFile: CERTIFIED CARPET AREA.jpg13 Aug 2023
COMMON AREAFile: COMMON AREA DETAILS CERTIFIED BY ENGINEER SELF ATTESTED.jpg13 Aug 2023
timeline completion date in the relevant Para and upload the proforma agreement for sale as notifiedFile: AOS new.pdf13 Aug 2023
STP/Septic Tank, Soak pit, and sewer line drawing certified by the concerned Engineer.File: Spetic tank plan.jpeg13 Aug 2023
Land Calculation sheet as per the guidance value(Self-attested copy).File: guidance value self attested.pdf13 Aug 2023
self-attested/notarized attested copies of all required NOCs about this project.File: mescom NOC self attested.pdf13 Aug 2023
self-attested/notarized attested copies of all required NOCs about this project.File: water noc self attested.pdf13 Aug 2023
ClarificationFile: clarification.pdf13 Aug 2023
RTC, survey 11-1A11(P)-
Mutation, survey 11-1A11(P)-
Encumbrance Certificate, survey 11-1A11(P)-
Conversion/Alienation Order, survey 11-1A11(P)-
Sale/Title/Gift Deed, survey 11-1A11(P)-
Khatha, survey 11-1A11(P)-
Registration CertificateFile: GST REGISTRATION CERTIFICATE (1).pdf-
Certificate issued by CA Form 1File: AB-CACertificate.pdf-
Certificate issued by Architect Form 2File: AB-Form2_ArchitectWIthEstimateandCarpetArea.pdf-
Certificate issued by Engineer Form 3File: AB_Form3_EngineerWithEstimateandCarpetArea.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non litigation affidavit.pdf-
Certificate from Chartered AccountFile: AB-CACertificate.pdf-
Balance Sheet 2021 - 2022File: BS 2023.pdf-
Balance Sheet 2020 - 2021File: BS AND PL 2022.pdf-
Balance Sheet 2019 - 2020File: BS 2021.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL 2023.pdf-
Audited Profit and Loss Statement 2020 - 2021File: BS AND PL 2022.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PL 2021.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 2023.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2022.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2021.pdf-
AB-BuildingLicense-
Mescom Noc with fees paid Receipt-
Water_NOC-
AB-ApprovedPlan-
Plan-
AB-ApprovedPlan-
Plan-
AB-ApprovedPlan-
Project Specification-
AB-ApprovedPlan-
Plan-
AB-BuildingStabilityCert-
AB-LegalOpinion-
AB-ApprovedLayoutPlan SINGLE LAYOUT-
AB-ConversionOrder049-
AOS-
ALLOTMENT letter-
form b-
notorized affidavit-
Mescom Noc with fees paid Receipt-
Water_NOC-
Unnamed document-
Unnamed document-
Fire NOC-
Unnamed document-
KSPCB-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Village Map-
CDP-
Estimate certified by engineere-
carpet area certified-
Form 5-
Form 6-
AB-GuidanceVal-
AB-BankConfirmation071-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep AMRITHA ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: AMRITHA BUILDERS & DEVELOPERS

AMRITHA BUILDERS & DEVELOPERS has 1 registration on RERA Karnataka, including AMRITHA ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if AMRITHA ENCLAVE is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of AMRITHA ENCLAVE?

The registered promoter entity is AMRITHA BUILDERS & DEVELOPERS, a proprietorship as per the filing. Its GSTIN 29AJTPB0053A3ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in AMRITHA ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at AMRITHA ENCLAVE?

The professionals named in the filing: Architect: RAJEEV S; Engineer: RAJEEV S; Chartered Accountant: CA. MB Rama Bhat. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMRITHA ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMRITHA ENCLAVE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMRITHA ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.