Home / Browse projects / Raigarh, Maharashtra / AMBIKA NIWAS

Completed No litigation declared Others project

AMBIKA NIWAS

By AJAY ANANTA PATIL

RG-MH-06828 · RERA P52000053693 · Last updated on MahaRERA portal: 17 Nov 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 82%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

AMBIKA NIWAS is a Others project by AJAY ANANTA PATIL in Raigarh, Maharashtra, registered with MahaRERA as P52000053693 on 22 Nov 2023. The registration is recorded completed; possession was promised by 31 Mar 2027.

At a glance

Project

  • NameAMBIKA NIWAS
  • TypeOthers
  • Location
    • SECTOR R4 PLOT NUMBER 88
    • PUSHPAK
    • KARANJADE
    • Karanjade
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000053693
  • ReraGenie IDRG-MH-06828

Builder

  • NameAJAY ANANTA PATIL
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects11 →

Key dates

this monthRegisteredNov 2023PromisedMar 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Nov 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMBIKA NIWASNA88000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 82%.

AMBIKA NIWAS: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.82%

Progress on shared amenities15

As on 17 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes45%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area700 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
KRISHNA VITTHAL PATILKaranjadeRaigarh
RAJARAM VITTHAL PATILKaranjadeRaigarh

Approvals and building plan

Sanctioning authorityITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
Permissible FSI2195.98
Proposed, not sanctioned2,196 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEEL AVENUE ,PLOT NO-05 , PANVEL , MATHERAN ROAD ,PANVEL-410206

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL ARCHITECTS
EngineerVIJAY KUMAR SINGH
Chartered AccountantG S DESAI AND ASSOCIATES
Chartered AccountantSandesh Santosh Desai
PartnerRole in project
AJAY ANANTA PATIL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 May 2025

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: R4-88 FORM 1-DEC 2024.pdf17 Nov 2025
Form 2File: R4-88-FORM 2-DEC 2024.pdf17 Nov 2025
Disclosure of Sold and Booked InventoryFile: R4-88-SOLD INVENTORY.pdf17 Nov 2025
Form 3File: form 3 ambika niwas.pdf17 Nov 2025
Form 1File: FORM NO 1 88.pdf17 Nov 2025
Form 2File: R4-88 form-2.pdf17 Nov 2025
Disclosure of Sold and Booked InventoryFile: R4-88 sold-unsold inventory.pdf17 Nov 2025
Form 3File: FORM-3.pdf17 Nov 2025
Form 1File: form 1- 88-R4-Sept 24.pdf18 Sep 2025
Form 2File: form2, Sep 2024, P-88, S-R4.pdf18 Sep 2025
Form 3File: PLOT 88 SEC R4 FORM 3.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY-R4-88 Q2.pdf18 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1 88.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf23 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R4-88 form-2.pdf23 Jul 2025
Disclosure of sold/ booked inventoryFile: R4-88 sold-unsold inventory.pdf23 Jul 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R4-88 form-1.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R4-88 form-2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: R4-88 sold-unsold inventory.pdf21 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: R4-88 form-2A.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ambika niwas.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R4-88 FORM 1-DEC 2024.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R4-88-FORM 2-DEC 2024.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: R4-88-SOLD INVENTORY.pdf11 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ambika Niwas Form 5.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PLOT 88 SEC R4 FORM 3.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R3-247 FORM 2 - Sept 24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2, Sep 2024, P-88, S-R4.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1- 88-R4-Sept 24.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PLOT NO-88 AMBIKA NIWAS FORM 3.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY-R4-88 Q2.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 88-R4-FORM 1 - Q1 (24-25).pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R4-88 FORM-2 16-07-2024 AMBIKA NIWAS.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD INVETARY - R4-88.pdf25 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 A plot no 88.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 88-R4.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY R4 88.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 88-R4-PUSHPAK RERA (2024 MARCH) REVISED.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AMBIKA NIWAS (4).pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 88-R4-PUSHPAK RERA (2023 DECEMBER).pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PLOT NO 88-R4 FORM -2.pdf21 Feb 2024
Disclosure of sold/ booked inventoryFile: AMBIKA NIWAS (3).pdf21 Feb 2024
Copy of the legal title reportFile: SEC R4 PLOT 88 LEGAL TITLE CERTIFICATE (1).pdf19 Dec 2023
Details of encumbrances concerned to FinanceFile: LEGAL AND LITIGATION ENCUMBRANCES DERTIFICATE.pdf16 Nov 2023
Details of encumbrances concerned to LegalFile: LEGAL AND LITIGATION ENCUMBRANCES DERTIFICATE.pdf16 Nov 2023
Building plan approvalFile: R4 88 CC DRAWING G7 c.pdf7 Nov 2023
Building plan approvalFile: R4-88 CC DRAWING G7 2.pdf7 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: R4 88 CC DRAWING G7 c.pdf7 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: R4-88 CC DRAWING G7 2.pdf7 Nov 2023
Other - TechnicalFile: ATUL PATEL ARCHITECTS Mail Development permissionCC granted on Plot No 88 Sector R4 at Pus7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2.pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ambika niwas 88 form 3.pdf1 Nov 2023
Proforma of Agreement for saleFile: R4 88 AGREEMENT FOR SALE.pdf1 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format - A.pdf1 Nov 2023
Layout approvalFile: R4 88 CC DRAWING G7 c.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: R4 88 CC DRAWING G7 c.pdf27 Oct 2023
Other - LegalFile: R4 88 development agreement.pdf27 Oct 2023
Other - LegalFile: LEASE AGREEMENT R4-88-01.pdf27 Oct 2023
Other - LegalFile: LEASE AGREEMENT R4-88-02.pdf27 Oct 2023
Other - LegalFile: LEASE AGREEMENT R4-88-03.pdf27 Oct 2023
Declaration in FORM BFile: AJAY ANANTA PATIL FORM-B R4-88.pdf26 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of real estate organization.pdf26 Oct 2023
Proforma of Allotment letterFile: MODEL LETTER OF ALLOTMENT LETTER R488.pdf26 Oct 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE DECLARATION RELATED TO FINANCE.pdf21 Oct 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION RELATED TO FINANCE.pdf21 Oct 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCMNT CERITIFCATE FORMAT - D.pdf21 Oct 2023
CERSAI detailsFile: DECLARATION ABOUT CERSAI DETAILS.pdf21 Oct 2023
Deviation Report with respect to Allotment letterFile: declaration about deviation withallotment letter.pdf21 Oct 2023
Deviation Report with respect to model copy of AgreementFile: declaration about deviation report with respect to model copy of agreement.pdf21 Oct 2023
Copy of the legal title reportFile: SEC-R4 PLOT NO-88 TITLE SEARCH ambika niwas.pdf20 Oct 2023
PAN CardFile: AJAY ANANTA PATIL PAN CARD.pdf4 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: R4 88 CC Certificate.pdf4 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1.pdf4 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
JANAI COMPLEXPLOT NUMBER 224 VADGHAR PUSHPAK PANVEL 41020638CompletedNov 2023Jan 2023

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMBIKA NIWAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK, KARANJADE5,900+ in Raigarh

2 kmAMBIKA NIWASCompleted 15Lapsed / revoked 1Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: AJAY ANANTA PATIL

Ajay Ananta Patil has 4 registrations on MahaRERA, including Janai Complex and SIDDHIVINAYAK SPARSH. Its filings disclose 11 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if AMBIKA NIWAS is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMBIKA NIWAS?

The registered promoter entity is AJAY ANANTA PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMBIKA NIWAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMBIKA NIWAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMBIKA NIWAS?

The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: VIJAY KUMAR SINGH; Chartered Accountant: G S DESAI AND ASSOCIATES; Chartered Accountant: Sandesh Santosh Desai. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMBIKA NIWAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMBIKA NIWAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMBIKA NIWAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.