ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / AMAR APEX

Completed No litigation declared Commercial project

AMAR APEX

By Amar Ventures

RG-MH-14248 · RERA P51600031753 · Last updated on MahaRERA portal: 14 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 161 documents Report an error

AMAR APEX is a Commercial project by Amar Ventures in Nashik, Maharashtra, registered with MahaRERA as P51600031753 on 8 Nov 2021. The registration is recorded completed; possession was promised by 30 Mar 2025. The completion date has moved by 3 months from the original filing.

At a glance

Project

  • NameAMAR APEX
  • TypeCommercial
  • Location
    • SHARANPUR ROAD
    • OPP. RACHANA VIDYALAYA
    • Nashik
    • 422002
  • Pincode422002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600031753
  • ReraGenie IDRG-MH-14248

Builder

  • NameAmar Ventures
  • Entity typePartnership
  • PartnersRohit Sujit Jajoo, Vaibhav Avinash Malpani, Pratik Balkisan Dhut

Key dates

this monthRegisteredNov 2021First promiseDec 2024Revised toMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Nov 2021
  • Promised completion30 Mar 2025
  • Revised completionRevised to 30 Mar 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed161 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMAR APEXNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

AMAR APEX: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Open Space17

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,069 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3464.85
Proposed, not sanctioned3,465 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUYOJIT SANKUL, SHARANPUR ROAD, NASHIK

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSNEHAL GADKARI
EngineerAVINASH RAMVILAS MALPANI
Chartered AccountantASHOK ZAWAR AND CO
Chartered AccountantZAWAR SOMANI & CO
PartnerRole in project
Amar Ventures-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600025108Dec 2024 → Mar 2025

Reason as filed by the promoterTo, The Maharashtra Real Estate Regulatory Authority, Mumbai. Subject: Re-submission of Application for Extension of Registration of Project Respected Sir/Madam, We're writing to hereby re-submit the application for extension of registration of the following project: Amar Apex Apartment registered vide project registration number bearing P51600031753 and extension application number bearing EXT51600025108. We had initially filed the application for extension upto 31/12/2025. However, we have received the Full Occupancy Certificate from the Nashik Municipal Corporation (Competent Authority) vid

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 May 2024

Documents filed161

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2021-2022)File: 2122.pdf14 Jan 2026
Form 5 (FY 2022-2023)File: 2223.pdf14 Jan 2026
Form 5 (FY 2023-2024)File: 2324.pdf14 Jan 2026
Form 5 (FY 2024-2025)File: 2425.pdf14 Jan 2026
Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: 7.pdf27 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATEE.pdf27 Dec 2025
Form 2File: FORM II ENGI CERTIFICATE.pdf27 Dec 2025
Form 3File: FORM III CA CERTIFICATE.pdf27 Dec 2025
Form 1File: FORM I ARCHITCH CERTIFICAT.pdf27 Dec 2025
Form 2File: FORM II ENGI CERTIFICATE.pdf27 Dec 2025
Form 3File: FORM III CA CERTIFICATE.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: 8.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: 9.pdf27 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATE - AMAR VENTURES.pdf27 Dec 2025
Form 2File: FORM II ENGI CERTIFICATE - AMAR APEX.pdf27 Dec 2025
Form 3File: FORM III CA CERTIFICATE - AMAR APEX.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: 10.pdf27 Dec 2025
Form 1File: FORM I ARCITECHT CERTIFICATE.pdf27 Dec 2025
Form 2File: FORM II ENGI CERTIFICATE.pdf27 Dec 2025
Form 3File: FORM III CA CERTIFICATE.pdf27 Dec 2025
Form 2A (FY 2024-2025)File: FORM 2A -24-25.pdf27 Dec 2025
Form 2A (FY 2023-2024)File: FORM 2A -23-24.pdf27 Dec 2025
Form 2A (FY 2022-2023)File: FORM2A QUALITY ASSURANCE 23-24.pdf27 Dec 2025
Form 2A (FY 2021-2022)File: FORM2A QUALITY ASSURANCE.pdf27 Dec 2025
Form 1File: FORM 1 ARCHITECH CERTIFICATE.pdf20 Dec 2025
Form 2File: FORM 2 ENGI CERTIFICATE.pdf20 Dec 2025
Form 3File: RERA F 3 AMAR APEX - BY VENTURES 032022.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: 1.pdf20 Dec 2025
Form 1File: FORM 1 ARCHITECH CERTIFICATE.pdf20 Dec 2025
Form 2File: FORM 2 ENGI CERTIFICATE.pdf20 Dec 2025
Form 3File: RERA F 3 AMAR APEX - BY VENTURES 032022.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: 2.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: 3.pdf20 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATE.pdf20 Dec 2025
Form 2File: FORM II ENGI CERTIFICATE.pdf20 Dec 2025
Form 3File: FORM III C A CERTIFICATE.pdf20 Dec 2025
Form 2File: FORM II ENGI CERTIFICATE.pdf20 Dec 2025
Form 3File: FORM III C A CERTIFICATE.pdf20 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATE.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: Discloser SoldUnsold Inventory.pdf20 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATE.pdf20 Dec 2025
Form 2File: FORM II ENGEENER CERTIFICATE.pdf20 Dec 2025
Form 3File: Scanned Form 3 Q3 Amar Ventures_compressed.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: 3.pdf20 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATE.pdf20 Dec 2025
Form 2File: FORM II ENGEENEERS CERTIFICATE.pdf20 Dec 2025
Form 3File: Amar Ventures form 3 Q4 FY 22-23.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4.pdf20 Dec 2025
OthersFile: FORM2A QUALITY ASSURANCE.pdf20 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATE.pdf20 Dec 2025
Form 2File: FORM II ENGINEERS CERTIFICATE.pdf20 Dec 2025
Form 3File: FORM III CA CERTIFICATE.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4.pdf20 Dec 2025
OthersFile: FORM V CA CERTIFICATE.pdf20 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATE.pdf20 Dec 2025
Form 2File: FORM II ENGINEERS CERTIFICATE.pdf20 Dec 2025
Form 3File: FORM III CA CERTIFICATE.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: 5.pdf20 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATE.pdf20 Dec 2025
Form 2File: FORM II ENGI CERTIFICATE.pdf20 Dec 2025
Form 3File: FORM III CA CERTIFICATE-1MB.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: 6.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: 7.pdf20 Dec 2025
Form 1File: FORM I ARCHITECH CERTIFICATE-AMAR APEX.pdf20 Dec 2025
Form 2File: FORM II ENGI CERTIFICATE-AMAR APEX.pdf20 Dec 2025
Form 3File: FORM III CA CERTIFICATE-AMAR APEX_compressed.pdf20 Dec 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM II CA CERTIFFICATE.pdf8 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM V CA CERTIFICATE.pdf7 May 2025
Proforma of Allotment letterFile: Proforma Allotment Letter_Amar Apex.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III CA CERTIFICATE_compressed.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: P51600031753_FileName_7.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION.pdf3 May 2025
Deviation Report with respect to Allotment letterFile: Deviation allotment letter.pdf3 May 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement to sale.pdf3 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloure of Interst on other real istate projects_compressed.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -23-24.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -24-25.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CA CERTIFICATE -23-24.pdf3 May 2025

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 3 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMAR APEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP. RACHANA VIDYALAYA4,100+ in Nashik

2 kmAMAR APEXCompleted 153Lapsed / revoked 36Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 283 registered projects within 2 km.

Builder: Amar Ventures

Amar Ventures has 1 registration on MahaRERA, including AMAR APEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if AMAR APEX is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMAR APEX?

The registered promoter entity is Amar Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMAR APEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMAR APEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMAR APEX?

The professionals named in the filing: Architect: SNEHAL GADKARI; Engineer: AVINASH RAMVILAS MALPANI; Chartered Accountant: ASHOK ZAWAR AND CO; Chartered Accountant: ZAWAR SOMANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMAR APEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMAR APEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMAR APEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.