Home / Browse projects / Nashik, Maharashtra / AMAR APEX
AMAR APEX
RG-MH-14248 · RERA P51600031753 · Last updated on MahaRERA portal: 14 Jan 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 3 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AMAR APEX is a Commercial project by Amar Ventures in Nashik, Maharashtra, registered with MahaRERA as P51600031753 on 8 Nov 2021. The registration is recorded completed; possession was promised by 30 Mar 2025. The completion date has moved by 3 months from the original filing.
At a glance
Project
- NameAMAR APEX
- TypeCommercial
- Location
- SHARANPUR ROAD
- OPP. RACHANA VIDYALAYA
- Nashik
- 422002
- Pincode422002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600031753
- ReraGenie IDRG-MH-14248
Builder
- NameAmar Ventures
- Entity typePartnership
- PartnersRohit Sujit Jajoo, Vaibhav Avinash Malpani, Pratik Balkisan Dhut
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Nov 2021
- Promised completion30 Mar 2025
- Revised completionRevised to 30 Mar 2025 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed161 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AMAR APEX | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
AMAR APEX: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SNEHAL GADKARI |
| Engineer | AVINASH RAMVILAS MALPANI |
| Chartered Accountant | ASHOK ZAWAR AND CO |
| Chartered Accountant | ZAWAR SOMANI & CO |
| Partner | Role in project |
|---|---|
| Amar Ventures | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo, The Maharashtra Real Estate Regulatory Authority, Mumbai. Subject: Re-submission of Application for Extension of Registration of Project Respected Sir/Madam, We're writing to hereby re-submit the application for extension of registration of the following project: Amar Apex Apartment registered vide project registration number bearing P51600031753 and extension application number bearing EXT51600025108. We had initially filed the application for extension upto 31/12/2025. However, we have received the Full Occupancy Certificate from the Nashik Municipal Corporation (Competent Authority) vid
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 May 2024
Documents filed161
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2021-2022)File: 2122.pdf | 14 Jan 2026 |
| Form 5 (FY 2022-2023)File: 2223.pdf | 14 Jan 2026 |
| Form 5 (FY 2023-2024)File: 2324.pdf | 14 Jan 2026 |
| Form 5 (FY 2024-2025)File: 2425.pdf | 14 Jan 2026 |
| Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 7.pdf | 27 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATEE.pdf | 27 Dec 2025 |
| Form 2File: FORM II ENGI CERTIFICATE.pdf | 27 Dec 2025 |
| Form 3File: FORM III CA CERTIFICATE.pdf | 27 Dec 2025 |
| Form 1File: FORM I ARCHITCH CERTIFICAT.pdf | 27 Dec 2025 |
| Form 2File: FORM II ENGI CERTIFICATE.pdf | 27 Dec 2025 |
| Form 3File: FORM III CA CERTIFICATE.pdf | 27 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 8.pdf | 27 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 9.pdf | 27 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATE - AMAR VENTURES.pdf | 27 Dec 2025 |
| Form 2File: FORM II ENGI CERTIFICATE - AMAR APEX.pdf | 27 Dec 2025 |
| Form 3File: FORM III CA CERTIFICATE - AMAR APEX.pdf | 27 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 10.pdf | 27 Dec 2025 |
| Form 1File: FORM I ARCITECHT CERTIFICATE.pdf | 27 Dec 2025 |
| Form 2File: FORM II ENGI CERTIFICATE.pdf | 27 Dec 2025 |
| Form 3File: FORM III CA CERTIFICATE.pdf | 27 Dec 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A -24-25.pdf | 27 Dec 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A -23-24.pdf | 27 Dec 2025 |
| Form 2A (FY 2022-2023)File: FORM2A QUALITY ASSURANCE 23-24.pdf | 27 Dec 2025 |
| Form 2A (FY 2021-2022)File: FORM2A QUALITY ASSURANCE.pdf | 27 Dec 2025 |
| Form 1File: FORM 1 ARCHITECH CERTIFICATE.pdf | 20 Dec 2025 |
| Form 2File: FORM 2 ENGI CERTIFICATE.pdf | 20 Dec 2025 |
| Form 3File: RERA F 3 AMAR APEX - BY VENTURES 032022.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 1.pdf | 20 Dec 2025 |
| Form 1File: FORM 1 ARCHITECH CERTIFICATE.pdf | 20 Dec 2025 |
| Form 2File: FORM 2 ENGI CERTIFICATE.pdf | 20 Dec 2025 |
| Form 3File: RERA F 3 AMAR APEX - BY VENTURES 032022.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 2.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 3.pdf | 20 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATE.pdf | 20 Dec 2025 |
| Form 2File: FORM II ENGI CERTIFICATE.pdf | 20 Dec 2025 |
| Form 3File: FORM III C A CERTIFICATE.pdf | 20 Dec 2025 |
| Form 2File: FORM II ENGI CERTIFICATE.pdf | 20 Dec 2025 |
| Form 3File: FORM III C A CERTIFICATE.pdf | 20 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATE.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloser SoldUnsold Inventory.pdf | 20 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATE.pdf | 20 Dec 2025 |
| Form 2File: FORM II ENGEENER CERTIFICATE.pdf | 20 Dec 2025 |
| Form 3File: Scanned Form 3 Q3 Amar Ventures_compressed.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 3.pdf | 20 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATE.pdf | 20 Dec 2025 |
| Form 2File: FORM II ENGEENEERS CERTIFICATE.pdf | 20 Dec 2025 |
| Form 3File: Amar Ventures form 3 Q4 FY 22-23.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 4.pdf | 20 Dec 2025 |
| OthersFile: FORM2A QUALITY ASSURANCE.pdf | 20 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATE.pdf | 20 Dec 2025 |
| Form 2File: FORM II ENGINEERS CERTIFICATE.pdf | 20 Dec 2025 |
| Form 3File: FORM III CA CERTIFICATE.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 4.pdf | 20 Dec 2025 |
| OthersFile: FORM V CA CERTIFICATE.pdf | 20 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATE.pdf | 20 Dec 2025 |
| Form 2File: FORM II ENGINEERS CERTIFICATE.pdf | 20 Dec 2025 |
| Form 3File: FORM III CA CERTIFICATE.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 5.pdf | 20 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATE.pdf | 20 Dec 2025 |
| Form 2File: FORM II ENGI CERTIFICATE.pdf | 20 Dec 2025 |
| Form 3File: FORM III CA CERTIFICATE-1MB.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 6.pdf | 20 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 7.pdf | 20 Dec 2025 |
| Form 1File: FORM I ARCHITECH CERTIFICATE-AMAR APEX.pdf | 20 Dec 2025 |
| Form 2File: FORM II ENGI CERTIFICATE-AMAR APEX.pdf | 20 Dec 2025 |
| Form 3File: FORM III CA CERTIFICATE-AMAR APEX_compressed.pdf | 20 Dec 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM II CA CERTIFFICATE.pdf | 8 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM V CA CERTIFICATE.pdf | 7 May 2025 |
| Proforma of Allotment letterFile: Proforma Allotment Letter_Amar Apex.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III CA CERTIFICATE_compressed.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: P51600031753_FileName_7.pdf | 3 May 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION.pdf | 3 May 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation allotment letter.pdf | 3 May 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Agreement to sale.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloure of Interst on other real istate projects_compressed.pdf | 3 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -23-24.pdf | 3 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -24-25.pdf | 3 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CA CERTIFICATE -23-24.pdf | 3 May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 161 filed documents as one ZIP, foldered, with a manifest
Keep AMAR APEX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OPP. RACHANA VIDYALAYA4,100+ in Nashik
Filed coordinates, straight-line distance. 283 registered projects within 2 km.
THE CHOUPAAL
KALANTRI AND BANG PROPERTIES
Sai Pride
Jay Infrastructures
Nayantara Presidency Phase 3
Pancharatna Builcon Pvt. Ltd
Nayantara Presidency Phase 4
Pancharatna Builcon Pvt. Ltd
TRUKONS BUSINESS PARK
TEZVED BUILDCON LLP
Avenue Flora
The Avenue NX
See every Nashik project, with the district possession charts
Builder: Amar Ventures
Amar Ventures has 1 registration on MahaRERA, including AMAR APEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if AMAR APEX is delayed beyond 30 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AMAR APEX?
The registered promoter entity is Amar Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AMAR APEX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AMAR APEX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AMAR APEX?
The professionals named in the filing: Architect: SNEHAL GADKARI; Engineer: AVINASH RAMVILAS MALPANI; Chartered Accountant: ASHOK ZAWAR AND CO; Chartered Accountant: ZAWAR SOMANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMAR APEX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback