ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / ALTAMONTE

Registered No litigation declared Mixed project

ALTAMONTE

By CONCEPT SUPERSTRUCTURES PRIVATE LIMITED

RG-MH-87916 · RERA P52000014347 · Last updated on MahaRERA portal: 31 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 131 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 131 months from the original
21 of 27Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 35%
133 of 193Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 214 documents Report an error

ALTAMONTE is a Mixed project by CONCEPT SUPERSTRUCTURES PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000014347 on 24 Nov 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 131 months from the original filing. 60 of the 193 units on this registration are recorded sold or booked, and 21 of 27 construction stages are filed complete.

At a glance

Project

  • NameALTAMONTE
  • TypeMixed
  • Location
    • KARJAT
    • Dhamote
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000014347
  • ReraGenie IDRG-MH-87916

Builder

  • NameCONCEPT SUPERSTRUCTURES PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsMOHAMED FARHAAN MOHAMED IQBAL KHAN, FARZANA IQBAL KHAN

Key dates

this monthRegisteredNov 2017First promiseJan 2019Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Nov 2017
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 1 Jan 2019)
  • Buildings3 building records
  • Documents filed214 files

Current status

31%60 of 193 units booked
49.7%Work done, per cost certificate

Figures as on 31 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA5528836
BUILDING 2NA5432032
BUILDING 3NA8811213125

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 35%.

BUILDING 1100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 2100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 341%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo50%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNo50%

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Closed/Covered61
Open Space18
BuildingClosed/CoveredOpen SpaceTotal
BUILDING 2101
BUILDING 3601878

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,100 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Dec 2025

Approvals and building plan

Sanctioning authorityRaigad Zilla Parishad Alibag
Permissible FSI9822.9
Proposed, not sanctioned9,823 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch278 BY 1 SAFIYA TERRACE, M.G. ROAD,PANVEL, DISTT. RAIGAD, 410 206
Estimated costRs 26.59 cr
Cost incurredRs 13.21 cr
Work done49.66%
BuildingWingEstimatedIncurred
BUILDING 3NARs 17.05 crRs 4.26 cr
BUILDING 1NARs 4.10 crRs 4.10 cr
BUILDING 2NARs 3.44 crRs 3.44 cr
-NARs 2.01 crRs 1.41 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDinesh Nayak & Associates
EngineerVASTUKALP
Chartered AccountantSahajwani Narang & Associates
Chartered AccountantR. K. Pande & Associates
Chartered AccountantShailesh Narang & Associates
PartnerRole in project
CONCEPT SUPERSTRUCTURES PRIVATE LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000002063Jan 2019 → Dec 2019

Reason as filed by the promoterPROJECT IS STILL UNDER CONSTRUCTION AND NOT YET COMPLETED

EXT52000008817Jan 2019 → Dec 2024

Reason as filed by the promoterTWO BUILDINGS FROM THE PROJECT ARE COMPLETE O.C. ALSO RECEIVED AND UPLOADED FOR THE SAME. REMAINING TWO ARE PENDING

EA23122518929Jan 2019 → Dec 2029

Reason as filed by the promoterWe, Concept Superstructures Private Limited, hereby submit this Explanatory Note with respect to the real estate project “ALTAMONTE”, bearing MahaRERA Registration No. P52000014347, seeking grant of extension for completion of the project up to 31-12-2029. 1. Project Overview The project “ALTAMONTE” consists of three buildings, namely Building 1, Building 2, and Building 3. 2. Status of Completed Buildings We respectfully submit that Building 1 and Building 2 have been fully completed, and we have obtained Full Occupancy Certificate for the same bearing OC No. जा.क्र/राजिप/बांधकाम/नेसंविप्रा/१

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Nov 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Jul 2020

Documents filed214

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 214 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1- 30 June 2026.pdf31 Jul 2026
Withdrawal Update Form 2File: Form 2- 30 June 2026.pdf31 Jul 2026
Withdrawal Update Form 3File: Form 3 June 2026.pdf31 Jul 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf12 May 2026
Layout approvalFile: HPSC0170_11zon.pdf17 Jan 2026
Building plan approvalFile: HPSC0170_11zon.pdf17 Jan 2026
Building plan approvalFile: HPSC0169_11zon.pdf17 Jan 2026
Building plan approvalFile: HPSC0168_11zon.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1 as on December 2025.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2 as on December 2025.pdf17 Jan 2026
Withdrawal Update Form 3File: Dec 25 Form 3.pdf17 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 as on September 2025.pdf5 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 as on September 2025.pdf5 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 as on September 2025.pdf5 Jan 2026
Form 1File: Form 1 December 2017_14_11zon.pdf23 Dec 2025
Form 2File: Form 2 December 2017.pdf23 Dec 2025
Form 3File: Form 3 December 2017.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2017.pdf23 Dec 2025
Form 1File: Form 1 March 2018_29_11zon.pdf23 Dec 2025
Form 2File: Form 2 March 2018.pdf23 Dec 2025
Form 3File: Form 3 March 2018.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2018.pdf23 Dec 2025
Form 1File: Form 1 June 2018_22_11zon.pdf23 Dec 2025
Form 2File: Form 2 June 2018.pdf23 Dec 2025
Form 3File: Form 3 June 2018.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 June 2018.pdf23 Dec 2025
Form 1File: Form 1 September 2018_37_11zon.pdf23 Dec 2025
Form 2File: Form 2 September 2018.pdf23 Dec 2025
Form 3File: Form 3 September 2018.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Septemer 2018.pdf23 Dec 2025
Form 1File: Form 1 December 2018_15_11zon.pdf23 Dec 2025
Form 2File: Form 2 December 2018.pdf23 Dec 2025
Form 3File: Form 3 December 2018.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2018.pdf23 Dec 2025
Form 1File: Form 1 March 2019_30_11zon.pdf23 Dec 2025
Form 2File: Form 2 March 2019.pdf23 Dec 2025
Form 3File: Form 3 March 2019.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2019.pdf23 Dec 2025
Form 1File: Form 1 June 2019_23_11zon.pdf23 Dec 2025
Form 2File: Form 2 June 2019.pdf23 Dec 2025
Form 3File: Form 3 June 2019.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 June 2019.pdf23 Dec 2025
Form 1File: Form 1 September 2019_38_11zon.pdf23 Dec 2025
Form 2File: Form 2 September 2019.pdf23 Dec 2025
Form 3File: Form 3 September 2019.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Septemer 2019.pdf23 Dec 2025
Form 1File: Form 1 December 2019_16_11zon.pdf23 Dec 2025
Form 2File: Form 2 December 2019.pdf23 Dec 2025
Form 3File: Form 3 December 2019.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2019.pdf23 Dec 2025
Form 1File: Form 1 March 2020_31_11zon.pdf23 Dec 2025
Form 2File: Form 2 March 2020.pdf23 Dec 2025
Form 3File: Form 3 March 2020.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2020.pdf23 Dec 2025
Form 1File: Form 1 June 2020_24_11zon.pdf23 Dec 2025
Form 2File: Form 2 June 2020.pdf23 Dec 2025
Form 3File: Form 3 June 2020.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 June 2020.pdf23 Dec 2025
Form 1File: Form 1 September 2020_39_11zon.pdf23 Dec 2025
Form 2File: Form 2 September 2020.pdf23 Dec 2025
Form 3File: Form 3 September 2020.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Septemer 2020.pdf23 Dec 2025
Form 1File: Form 1 December 2020_17_11zon.pdf23 Dec 2025
Form 2File: Form 2 December 2020.pdf23 Dec 2025
Form 3File: Form 3 December 2020.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2020.pdf23 Dec 2025
Form 1File: Form 1 March 2021_32_11zon.pdf23 Dec 2025
Form 2File: Form 2 March 2021.pdf23 Dec 2025
Form 3File: Form 3 March 2021.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2021.pdf23 Dec 2025
Form 1File: Form 1 June 2021_25_11zon.pdf23 Dec 2025
Form 2File: Form 2 June 2021.pdf23 Dec 2025
Form 3File: Form 3 June 2021.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 June 2021.pdf23 Dec 2025
Form 1File: Form 1 September 2021_40_11zon.pdf23 Dec 2025
Form 2File: Form 2 September 2021.pdf23 Dec 2025
Form 3File: Form 3 September 2021.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Septemer 2021.pdf23 Dec 2025

How this compares with Raigarh

31%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 131 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ALTAMONTE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KARJAT5,900+ in Raigarh

2 kmALTAMONTECompleted 62Lapsed / revoked 30Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 135 registered projects within 2 km.

Builder: CONCEPT SUPERSTRUCTURES PRIVATE LIMITED

CONCEPT SUPERSTRUCTURES PRIVATE LIMITED has 1 registration on MahaRERA, including ALTAMONTE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ALTAMONTE is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ALTAMONTE?

The registered promoter entity is CONCEPT SUPERSTRUCTURES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ALTAMONTE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ALTAMONTE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ALTAMONTE?

The professionals named in the filing: Architect: Dinesh Nayak & Associates; Engineer: VASTUKALP; Chartered Accountant: Sahajwani Narang & Associates; Chartered Accountant: R. K. Pande & Associates; Chartered Accountant: Shailesh Narang & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALTAMONTE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALTAMONTE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALTAMONTE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.