Home / Browse projects / Ahmednagar, Maharashtra / ALPHA 1

Registration lapsed No litigation declared Others project

ALPHA 1

By NANDA RAJU JADHAV

RG-MH-84497 · RERA P52200050470 · Last updated on MahaRERA portal: 28 Sep 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 20 months past the filed date
  • 21 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.
Mar 2025Possession promised20 months past this date
4 of 11Construction stages donefurthest along: Internal walls, 85%
0 of 2Units unsoldnot recorded sold or booked
21Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

ALPHA 1 is a Others project by NANDA RAJU JADHAV in Ahmednagar, Maharashtra, registered with MahaRERA as P52200050470 on 17 Apr 2023. Possession was promised by 28 Mar 2025 and is now 20 months past that date. 2 of the 2 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 21 complaints are on record with the regulator.

At a glance

Project

  • NameALPHA 1
  • TypeOthers
  • Location
    • NALEGAON AHMEDNAGAR
    • NALEGAON
    • Ahmadnagar (M Corp.)
    • Nagar
    • Ahmednagar
    • 414001
  • Pincode414001
  • RERA no.P52200050470
  • ReraGenie IDRG-MH-84497

Builder

  • NameNANDA RAJU JADHAV
  • Entity typeIndividual

Key dates

20 months past promisethis monthRegisteredApr 2023PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Apr 2023
  • Promised completion28 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed63 files

Current status

100%2 of 2 units booked
65.0%Work done, per cost certificate

Figures as on 28 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ALPHA 1NA1010202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

ALPHA 1: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises8%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.61%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered1
Open Space75

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,055 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Sep 2026

Approvals and building plan

Sanctioning authorityAHMEDNAGAR MUNICIPAL CORPORATION
Permissible FSI5270.26
Proposed, not sanctioned3,911 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 2 AND 6 PEARL PALLADIUM SOCIETY SURVEY NO 5 6, RAHATANI GAON, PIMPRI CHINCHWAD, PUNE
Estimated costRs 13.60 cr
Cost incurredRs 8.84 cr
Work done65.03%
BuildingWingEstimatedIncurred
ALPHA 1NARs 11.90 crRs 8.37 cr
-NARs 1.70 crRs 47.50 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwapnil Sathe
EngineerBR ASSOCIATES
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantKAPIL KUMAR AGARWAL AND ASSOCIATES
PartnerRole in project
NANDA RAJU JADHAV-

Complaints filed with MahaRERA21

Case no.ComplainantRespondentFiled
CC12503412VANDANA SAHDEO KHEDKARNANDA RAJU JADHAV24/09/2025
CC12503606SHUBHANGI ASHOK GAIKWADNANDA RAJU JADHAV10/10/2025
CC12503685YASHWANT GANPAT KEDARNANDA RAJU JADHAV16/10/2025
CC12504428YOGESH DNYANDEO DIVATENANDA RAJU JADHAV12/12/2025
CC12600068SONYABAPU SAHEBRAO CHAUDHARINANDA RAJU JADHAV05/01/2026
CC12600069PAWAN PRABHAKAR PAGDIMALNANDA RAJU JADHAV05/01/2026
CC12600158TANVEEZ ZAHID SHAIKHNANDA RAJU JADHAV10/01/2026
CC12600188AISHWARYA DONTANANDA RAJU JADHAV11/01/2026
CC12600481DAKSHATA VADALAKONDANANDA RAJU JADHAV27/01/2026
CC12600418ABHISHEK VADALAKONDANANDA RAJU JADHAV22/01/2026
CC12600366OMKAR PatkiNANDA RAJU JADHAV20/01/2026
CC12600748RAKHI PawaNANDA RAJU JADHAV09/02/2026
CC12600558Kalidas BulakheNANDA RAJU JADHAV01/02/2026
CC12600550virendra dhanashettiNANDA RAJU JADHAV01/02/2026
CC12600561SHRIKANT KULKARNINANDA RAJU JADHAV01/02/2026
CC12600562YOGESH THANGENANDA RAJU JADHAV01/02/2026
CC12600718RAJENDRA NARANGNANDA RAJU JADHAV08/02/2026
CC12600719RAJENDRA NARANGNANDA RAJU JADHAV08/02/2026
CC12600729NAMDEV NARAYAN CHIPPANANDA RAJU JADHAV08/02/2026
CC12600835YOGESH THANGENANDA RAJU JADHAV14/02/2026
CC12600838ganesh golwadNANDA RAJU JADHAV14/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 QUARTER 1 2026.pdf28 Sep 2026
Withdrawal Update Form 2File: FORM 2 QUARTER 1 2026.pdf28 Sep 2026
Withdrawal Update Form 3File: FORM 3 QUARTER 1 2026.pdf28 Sep 2026
Form 1File: ARCHITECTS CERTIFICATE Q2 23-24.pdf7 Sep 2026
Form 2File: ENGINEERING CERTIFICATE Q2 23-24.pdf7 Sep 2026
Form 3File: CA CERTIFICATE Q2 23-24.pdf7 Sep 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q2 2023.pdf7 Sep 2026
Form 1File: ARCHITECT CERTIFICATE Q3 23-24.pdf7 Sep 2026
Form 2File: ENGINEERS CERTIFICATE Q3 23-24.pdf7 Sep 2026
Form 3File: CA CERTIFICATE Q3 23-24.pdf7 Sep 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q3 20.pdf7 Sep 2026
Form 1File: ARCHITECT CERTIFICATE Q4 23-24.pdf7 Sep 2026
Form 2File: ENGINEERS CERTIFICATE Q4 23-24.pdf7 Sep 2026
Form 3File: CA CERTIFICATE Q4 23-24.pdf7 Sep 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q4 2023.pdf7 Sep 2026
Form 1File: ARCHITECT CERTIFICATE Q1 24-25.pdf7 Sep 2026
Form 2File: ENGINEER CERTIFICATE Q1 24-25.pdf7 Sep 2026
Form 3File: CA CERTIFICATE Q1 24-25.pdf7 Sep 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q1 2024.pdf7 Sep 2026
Form 1File: Architecture certificateQ 2 2024-25.pdf7 Sep 2026
Form 2File: Engineer certificate Q2 2024.pdf7 Sep 2026
Form 3File: CA certificate Q4 2024-2.pdf7 Sep 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q2 2024.pdf7 Sep 2026
Form 1File: Architecture certificate Q3 2024-25.pdf7 Sep 2026
Form 2File: Engineer certificate Q3 2024.pdf7 Sep 2026
Form 3File: CA certificate quarter 3 2024.pdf7 Sep 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q3 2024-1.pdf7 Sep 2026
Form 1File: Architecture certificate Q4 2024-25.pdf7 Sep 2026
Form 2File: Engineer certificate Q4 2024-25.pdf7 Sep 2026
Form 3File: CA certificate Q4 2024-2.pdf7 Sep 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q4 2024.pdf7 Sep 2026
Form 1File: ARCHITECT CERTIFICATE Q1 2023-24.pdf7 Sep 2026
Form 2File: ENGINEER CERTIFICATE Q1 2023-24.pdf7 Sep 2026
Form 3File: CA CERTIFICATE Q1 2023-24.pdf7 Sep 2026
Disclosure of Sold and Booked InventoryFile: Disclosure_Sold Q1 2023-2024.pdf7 Sep 2026
Layout approvalFile: Plan.pdf25 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan.pdf25 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf26 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final.pdf26 Jul 2023
Layout approvalFile: sanction plan.pdf24 May 2023
Copy of Layout Approval (in case of layout)File: sanction plan.pdf24 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement.pdf24 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200265404848_For_Asset_Based_Search_04_04_2023_14_39_38_500.pdf4 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf4 Apr 2023
Layout approvalFile: layout.pdf30 Mar 2023
Building plan approvalFile: 1.pdf30 Mar 2023
Copy of Layout Approval (in case of layout)File: layout.pdf30 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf30 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf30 Mar 2023
Declaration about Commencement CertificateFile: CIRCULAR 32.pdf30 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf30 Mar 2023
PAN CardFile: Pan.pdf17 Mar 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf17 Mar 2023
Details of encumbrances concerned to FinanceFile: No financial and legal encumbrance.pdf17 Mar 2023
Details of encumbrances concerned to LegalFile: No financial and legal encumbrance.pdf17 Mar 2023
Declaration in FORM BFile: Form B (1).pdf17 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf17 Mar 2023
Proforma of Agreement for saleFile: Agreement to Sale.pdf17 Mar 2023
Proforma of Allotment letterFile: Model allotment letter (1).pdf17 Mar 2023
Deviation Report with respect to Allotment letterFile: No deviation with respect to allotment letter.pdf17 Mar 2023
Deviation Report with respect to model copy of AgreementFile: No deviation agreement to sale.pdf17 Mar 2023

How this compares with Ahmednagar

100%of this project is bookeddistrict median 9%
8%of Ahmednagar projects moved their completion datethis one has not
28%of Ahmednagar registrations have lapsed or been cancelledthis one is among them

Computed across the 500+ Ahmednagar projects on ReraGenie, from their own filings.

Keep ALPHA 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALEGAON500+ in Ahmednagar

Builder: NANDA RAJU JADHAV

NANDA RAJU JADHAV has 1 registration on MahaRERA, including ALPHA 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ahmednagar district page.

Frequently asked questions

What does it mean that ALPHA 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ALPHA 1 is delayed beyond 28 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ALPHA 1?

The registered promoter entity is NANDA RAJU JADHAV, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ALPHA 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ALPHA 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ALPHA 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ALPHA 1?

The professionals named in the filing: Architect: Swapnil Sathe; Engineer: BR ASSOCIATES; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: KAPIL KUMAR AGARWAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALPHA 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALPHA 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALPHA 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.