Home / Browse projects / Dakshina Kannada, Karnataka / Alexandria

Registration approved Residential/Group Housing project

Alexandria

By Menorah Realties Pvt Ltd

RG-KA-50049 · RERA PRM/KA/RERA/1257/334/PR/180313/001817

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Jun 2019Possession promisedmoved 12 months from the original
2Complaints at RERA Karnatakaon this registration
Jump to the 66 documents Report an error

Alexandria is a Residential/Group Housing project by Menorah Realties Pvt Ltd in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/180313/001817 on 13 Mar 2018. Possession is promised by 30 Jun 2019. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameAlexandria
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/180313/001817
  • ReraGenie IDRG-KA-50049

Builder

  • NameMenorah Realties Pvt Ltd
  • Entity typeCompany
  • CINU45200MH2008PTC180337
  • Authorized SignatoryDavid Sassoon Ashtamkar
  • DirectorAmira David Ashtamkar

Key dates

this monthRegisteredMar 2018First promiseJun 2018Revised toJun 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on13 Mar 2018
  • Promised completion30 Jun 2019
  • Revised completionRevised to 30 Jun 2019 (originally 30 Jun 2018)
  • Buildings4 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---30030
B---38038
C---38038
D---30030

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,797 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 70.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHafeez Contractor
EngineerRoy and Shenoy

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/334/PR/200702/001817Jun 2018 → Jun 2019

Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc; Shortage of Building Materials, Concrete, Jalli etc; Shortage of Building Materials, Concrete, Jalli etc; Shortage of Building Materials, Concrete, Jalli etc

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
CMP/200302/0005443-Menorah Realties Pvt Ltd02/03/2020
01051/2024-Menorah Realties Pvt Ltd23/10/2024

Documents filed66

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/180313/001817 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Certificate of incorporation MRPL (2).pdf-
Certificate form Architect,Engineer,CA etc.File: Pic.jpg-
Architect Certificate for Work Completion Schedule till DateFile: MX-M356N_20181213_174824.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: MX-M356N_20181213_174740_001.jpg-
CA Certificate for Funds UtilizationFile: CA Certificate_Funds Utilised.pdf-
Architect Certificate for Pending Work Completion Schedule.File: MX-M356N_20181213_174824.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: MX-M356N_20181213_174757.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate_Funds Required_001.jpg-
AffidavitFile: RERA.pdf-
Latest Encumbrance CertificateFile: Encumberance certificate_compressed.pdf-
Consent letter from 2/3rd of AllotteesFile: MOU 6 pag_compressed-1-5.pdf-
Details Of Sold/ Un-sold UnitsFile: REREA Flat SOld and Unsold.xlsx-
Document 1File: 002512100008878.pdf-
Document 2-
Document 3File: Affidavit Bank Account Manorah 23.1.2020.pdf-
Document 4File: Affidavith extension of Registration of project 23.1.2020.pdf-
Document 5File: Affidavit cum Declaration Menorah 23.01.2020.pdf-
Document 6File: alexandria project 3.pdf-
Document 7File: alexandria project 4.pdf-
Document 8File: 2-3 rd consent final.pdf-
Document 9File: MoU -04.06.2018.pdf-
Document 10File: Kotak Bank Account statement.pdf-
Document 11File: CA Certificate Bank Account Change Menorah Realties.PDF-
Document 12File: Revised License letter to commissioner City Corporation.pdf-
Document 13File: Compensation Affidavit cum declaration 23.01.2020.pdf-
Document 14File: Bank letter.pdf-
Document 15File: Bank Account Change Affidavit Menorah 23.1.2020.pdf-
Document 16File: Completion certificate.pdf-
Document 17File: CA Certificate.PDF-
Document 18File: Plan.PDF-
commencement certificate-
New Doc 2017-10-23_1-
approved layout-
sale deed - Draft Alexandria -
AGREEMENT-
sale deed - Draft Alexandria -
Site Plan-
Site Plan-
ALLOTMENT-
Alexandria-
noc 2-
approved layout-
Encumberance cert-
Katha-
jv-
Balance Sheet 2015 - 2016File: Financial info 2016-17.pdf-
Balance Sheet 2014 - 2015File: Balance sheet 2015-16.pdf-
Balance Sheet 2013 - 2014File: Balance sheet 2014-15.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Financial info 2016-17.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit and Loss Alc 2015-16.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Profit and loss alc 2014-15.pdf-
Director's Report 2015 - 2016File: Financial info 2016-17.pdf-
Director's Report 2014 - 2015File: Audit Report 2015-16-.pdf-
Director's Report 2013 - 2014File: Director Report 2014-15.pdf-
Cash Flow Statement 2015 - 2016File: Financial info 2016-17.pdf-
Cash Flow Statement 2014 - 2015File: Balance sheet 2015-16.pdf-
Auditor's Report 2015 - 2016File: Financial info 2016-17.pdf-
Auditor's Report 2014 - 2015File: Audit Report 2015-16-.pdf-
Auditor's Report 2013 - 2014File: Audit Report 2014-15.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Financial info 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT Return MRPL 2015-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: IT Return MRPL 2014-15.pdf-
Form B-
Prospectus/BrochureFile: Borchure.docx-
Advertisement Copy 1File: Borchure.docx-
Tower Excel SheetFile: PRM_KA_RERA_1257_334_PR_180313_001817final.xlsx-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Alexandria on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: Menorah Realties Pvt Ltd

Menorah Realties Pvt Ltd has 1 registration on RERA Karnataka, including Alexandria. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Alexandria is delayed beyond 30 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Alexandria?

The registered promoter entity is Menorah Realties Pvt Ltd, a company as per the filing. Its CIN U45200MH2008PTC180337 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Alexandria?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Alexandria?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Alexandria?

The professionals named in the filing: Architect: Hafeez Contractor; Engineer: Roy and Shenoy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Alexandria?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Alexandria. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Alexandria to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.