Alexandria
RG-KA-50049 · RERA PRM/KA/RERA/1257/334/PR/180313/001817
Source: official RERA Karnataka filing
Red flags
- 2 complaints at RERA Karnataka
- Completion date moved by 12 months
- 1 extension taken
Clear
- Separate project account declared
Saved.
Alexandria is a Residential/Group Housing project by Menorah Realties Pvt Ltd in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/180313/001817 on 13 Mar 2018. Possession is promised by 30 Jun 2019. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameAlexandria
- TypeResidential/Group Housing
- Location
- Mangalore
- Dakshina Kannada
- PincodeNot stated
- RERA no.PRM/KA/RERA/1257/334/PR/180313/001817
- ReraGenie IDRG-KA-50049
Builder
- NameMenorah Realties Pvt Ltd
- Entity typeCompany
- CINU45200MH2008PTC180337
- Authorized SignatoryDavid Sassoon Ashtamkar
- DirectorAmira David Ashtamkar
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on13 Mar 2018
- Promised completion30 Jun 2019
- Revised completionRevised to 30 Jun 2019 (originally 30 Jun 2018)
- Buildings4 building records
- Documents filed66 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 30 | 0 | 30 |
| B | - | - | - | 38 | 0 | 38 |
| C | - | - | - | 38 | 0 | 38 |
| D | - | - | - | 30 | 0 | 30 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Hafeez Contractor |
| Engineer | Roy and Shenoy |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc; Shortage of Building Materials, Concrete, Jalli etc; Shortage of Building Materials, Concrete, Jalli etc; Shortage of Building Materials, Concrete, Jalli etc
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/200302/0005443 | - | Menorah Realties Pvt Ltd | 02/03/2020 |
| 01051/2024 | - | Menorah Realties Pvt Ltd | 23/10/2024 |
Documents filed66
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/180313/001817 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: Certificate of incorporation MRPL (2).pdf | - |
| Certificate form Architect,Engineer,CA etc.File: Pic.jpg | - |
| Architect Certificate for Work Completion Schedule till DateFile: MX-M356N_20181213_174824.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: MX-M356N_20181213_174740_001.jpg | - |
| CA Certificate for Funds UtilizationFile: CA Certificate_Funds Utilised.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: MX-M356N_20181213_174824.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: MX-M356N_20181213_174757.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA Certificate_Funds Required_001.jpg | - |
| AffidavitFile: RERA.pdf | - |
| Latest Encumbrance CertificateFile: Encumberance certificate_compressed.pdf | - |
| Consent letter from 2/3rd of AllotteesFile: MOU 6 pag_compressed-1-5.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: REREA Flat SOld and Unsold.xlsx | - |
| Document 1File: 002512100008878.pdf | - |
| Document 2 | - |
| Document 3File: Affidavit Bank Account Manorah 23.1.2020.pdf | - |
| Document 4File: Affidavith extension of Registration of project 23.1.2020.pdf | - |
| Document 5File: Affidavit cum Declaration Menorah 23.01.2020.pdf | - |
| Document 6File: alexandria project 3.pdf | - |
| Document 7File: alexandria project 4.pdf | - |
| Document 8File: 2-3 rd consent final.pdf | - |
| Document 9File: MoU -04.06.2018.pdf | - |
| Document 10File: Kotak Bank Account statement.pdf | - |
| Document 11File: CA Certificate Bank Account Change Menorah Realties.PDF | - |
| Document 12File: Revised License letter to commissioner City Corporation.pdf | - |
| Document 13File: Compensation Affidavit cum declaration 23.01.2020.pdf | - |
| Document 14File: Bank letter.pdf | - |
| Document 15File: Bank Account Change Affidavit Menorah 23.1.2020.pdf | - |
| Document 16File: Completion certificate.pdf | - |
| Document 17File: CA Certificate.PDF | - |
| Document 18File: Plan.PDF | - |
| commencement certificate | - |
| New Doc 2017-10-23_1 | - |
| approved layout | - |
| sale deed - Draft Alexandria | - |
| AGREEMENT | - |
| sale deed - Draft Alexandria | - |
| Site Plan | - |
| Site Plan | - |
| ALLOTMENT | - |
| Alexandria | - |
| noc 2 | - |
| approved layout | - |
| Encumberance cert | - |
| Katha | - |
| jv | - |
| Balance Sheet 2015 - 2016File: Financial info 2016-17.pdf | - |
| Balance Sheet 2014 - 2015File: Balance sheet 2015-16.pdf | - |
| Balance Sheet 2013 - 2014File: Balance sheet 2014-15.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: Financial info 2016-17.pdf | - |
| Audited Profit and Loss Statement 2014 - 2015File: Profit and Loss Alc 2015-16.pdf | - |
| Audited Profit and Loss Statement 2013 - 2014File: Profit and loss alc 2014-15.pdf | - |
| Director's Report 2015 - 2016File: Financial info 2016-17.pdf | - |
| Director's Report 2014 - 2015File: Audit Report 2015-16-.pdf | - |
| Director's Report 2013 - 2014File: Director Report 2014-15.pdf | - |
| Cash Flow Statement 2015 - 2016File: Financial info 2016-17.pdf | - |
| Cash Flow Statement 2014 - 2015File: Balance sheet 2015-16.pdf | - |
| Auditor's Report 2015 - 2016File: Financial info 2016-17.pdf | - |
| Auditor's Report 2014 - 2015File: Audit Report 2015-16-.pdf | - |
| Auditor's Report 2013 - 2014File: Audit Report 2014-15.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: Financial info 2016-17.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: IT Return MRPL 2015-16.pdf | - |
| Income Tax Return Acknowledgement 2013 - 2014File: IT Return MRPL 2014-15.pdf | - |
| Form B | - |
| Prospectus/BrochureFile: Borchure.docx | - |
| Advertisement Copy 1File: Borchure.docx | - |
| Tower Excel SheetFile: PRM_KA_RERA_1257_334_PR_180313_001817final.xlsx | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep Alexandria on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
ROHAN CITY
ROHAN CORPORATION INDIA PRIVATE LIMITED
Bearys Turning Point
Bearys Properties and Developments Private
YAMUNA SKY CITY
YAMUNA HOMES AND DESIGN PRIVATE LIMITED
The Marian Park
Marian Projects Pvt Ltd
Sai Matha Garden
Matha Developers Pvt Ltd
ROHAN MARINA ONE
ROHAN PLAZA PRIVATE LIMITED
See every Dakshina Kannada project, with the district possession charts
Builder: Menorah Realties Pvt Ltd
Menorah Realties Pvt Ltd has 1 registration on RERA Karnataka, including Alexandria. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if Alexandria is delayed beyond 30 Jun 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Alexandria?
The registered promoter entity is Menorah Realties Pvt Ltd, a company as per the filing. Its CIN U45200MH2008PTC180337 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Alexandria?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Alexandria?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Alexandria?
The professionals named in the filing: Architect: Hafeez Contractor; Engineer: Roy and Shenoy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Alexandria?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback