Home / Browse projects / Pune, Maharashtra / Aldea Annexo -C1

Completed No litigation declared Residential / Group Housing project

Aldea Annexo -C1

By Puranik Builders Limited

RG-MH-08280 · RERA P52100000979 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 19 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Aldea Annexo -C1 is a Residential / Group Housing project by Puranik Builders Limited in Pune, Maharashtra, registered with MahaRERA as P52100000979 on 25 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2026.

At a glance

Project

  • NameAldea Annexo -C1
  • TypeResidential / Group Housing
  • Location
    • Baner road
    • Near Puraniks Aldea Espanola
    • Mahalunge
    • Mulshi
    • Pune
    • 411023
  • Pincode411023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000979
  • ReraGenie IDRG-MH-08280

Builder

  • NamePuranik Builders Limited
  • Entity typeCompany
  • CINU99999MH1990PLC056451
  • GSTIN27AABCP0109R1Z9
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorShailesh Gopal Puranik
  • Other registrations19 more →
  • Completed5 of 20
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Jul 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C1-SantonaNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

C1-Santona: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered58

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,762 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
M/s. B.U. Bhandari VenturesPune (M Corp.)Pune

Approvals and building plan

Permissible FSI3477.35
Proposed, not sanctioned3,477 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No G-115, 116, 117, 118, High Street Cum Highland Corporate Centre, Kapurbawadi, Junction, Than

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastushilpa Associates
ArchitectCrystal Arch
EngineerG. A. Bhilare Consultants Pvt Ltd
PartnerRole in project
Puranik Builders Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jul 2022

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Aldea Annexo C1 - signed.pdf30 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Annexo C1.pdf21 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aldea Annexo -C1 Bldg -31032021.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect Annexo C1 31062021.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Annexo C1 30092021.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aldea Annexo -C1 Bldg -31122021.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect- Aldea Annexo - C1 Bldg -31032022.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect- Aldea Annexo - C1 Bldg -30062022.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect- Aldea Annexo - C1 Bldg -30092022.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect- Aldea Annexo - C1 Bldg -31122022.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 for Building C1 Annexo 310321.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 for Building C1 Annexo 300621.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 for Building C1 Annexo 300921.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Annexo C1 31122021.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Annexo C1 310322.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Annexo C1 300622.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Annexo C1 300922.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Annexo C1 311222.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 3 FORM 2A Annexo C1April2019- June 2019.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 4 FORM 2A Annexo C1July2019- Sept 2019.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 5 FORM 2A Annexo C1 Oct 2019- Dec 2019.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 6 FORM 2A Annexo C1 Jan2020- March2020.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 7 FORM 2A Annexo C April 2020- June2020.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 8 FORM 2A Annexo C July2020--Sept2020.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 9 FORM 2A Annexo C Oct2020--Dec2020.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 10 FORM 2A Annexo C Jan2021--March 2021.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 11 FORM 2A Annexo C April2021--June 2021.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 12 FORM 2A Annexo CJuly2021-Sept 2021.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 13 Form 2A- Annexo C1 Oct 21-Dec 21.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 14 Form 2A- Annexo C1 Jan 22-March 22.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 15 Form 2A- Annexo C1 April 22-June 22.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 16 Form 2A- Annexo C1July22-Sept22.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 17 Form 2A- Annexo C1 Oct22-Dec 22.pdf19 Apr 2023
Certificates of CA (Form 3)File: Annexo C1 Jun 21.pdf19 Apr 2023
Certificates of CA (Form 3)File: Annexo C1 Sept 21.pdf19 Apr 2023
Certificates of CA (Form 3)File: Annexo C1 Dec 21.pdf19 Apr 2023
Certificates of CA (Form 3)File: Annexo C1 March 22.pdf19 Apr 2023
Certificates of CA (Form 3)File: Annexo C1 Jun 22.pdf19 Apr 2023
Certificates of CA (Form 3)File: Annexo C1 Sept 22.pdf19 Apr 2023
Certificates of CA (Form 3)File: Annexo C1 Dec 22.pdf19 Apr 2023
Certificates of CA (Form 3)File: Annexo C1 310321.pdf19 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect project completion Aldea Annexo C1 Bldg.pdf11 Apr 2023
Certificates of CA (Form 3)File: Annexo C1 31032019.pdf11 Jan 2023
Certificates of CA (Form 3)File: Annexo C1 31032019.pdf11 Jan 2023
Certificates of CA (Form 3)File: ANNEXO C1 30619.pdf11 Jan 2023
Certificates of CA (Form 3)File: CA Certificates - Annexo C1.pdf11 Jan 2023
Certificates of CA (Form 3)File: CA Certificates - Annexo C1.pdf11 Jan 2023
Certificates of CA (Form 3)File: Annexo C1 March 20.pdf11 Jan 2023
Certificates of CA (Form 3)File: Annexo C1 June 20.pdf11 Jan 2023
Certificates of CA (Form 3)File: CA Certificates - Annexo C1.pdf11 Jan 2023
Certificates of CA (Form 3)File: Annexo C1.pdf11 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annexo C1.pdf4 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annexo C1.pdf1 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Annexo C1.pdf6 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Aldea Annexo C1.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Form 5 -Annexo C1.pdf31 Jul 2021
Details of Restarting of Construction work post lockdownFile: Annexo C1 - REPORT.pdf14 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ALDEA ANNEXO C1.pdf27 Jan 2020
Certificates of CA (Form 5)File: ANNEXO C1 PBL_-Form_-5.pdf22 Nov 2018
Proforma of Allotment letterFile: RERA Aldea Annexo C1 Agreement.pdf23 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Feb 2018
Copy of the legal title reportFile: Search and Title Report - Annexo.pdf18 Jul 2017
Details of encumbrancesFile: Encumbrances details.pdf18 Jul 2017
Declaration in FORM BFile: Declaration Annexo.PDF18 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Annexo.PDF18 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf18 Jul 2017
Layout approvalFile: SANCTION LAYOUT.pdf17 Jul 2017
Building plan approvalFile: SANCTION.pdf17 Jul 2017
Copy of Layout Approval (in case of layout)File: SANCTION LAYOUT.pdf17 Jul 2017
Building Plan Approval (IOD)File: SANCTION.pdf17 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Annexo C1.PDF17 Jul 2017
Certificates of CA (Form 3)File: CA Certificate-Annexo-C1.pdf17 Jul 2017

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hometown Part CKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2016Late, Apr 2017
Aldea AnnexoAldea Annexo Next to Hotel Vits Nr Balewadi Stadium Mhalunge Pune 411045129CompletedDec 2016Late, Apr 2017
Hometown Part BKasarvadavali Ghodbunder Road Thane west 400615159CompletedAug 2014Late, Jan 2015
Hometown Part AKasarvadavali Ghodbunder Road Thane west 400615176CompletedJun 2013Late, Nov 2013
Puranik City Part AKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2012Late, Feb 2013
Puranik City Part BKasarvadavali Ghodbunder Road Thane west 40061580CompletedDec 2011Late, Apr 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aldea Annexo -C1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Puraniks Aldea Espanola13,700+ in Pune

2 kmAldea Annexo -C1Completed 139Lapsed / revoked 45Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 285 registered projects within 2 km.

Builder: Puranik Builders Limited

Puranik Builders Limited has 20 registrations on MahaRERA, including Aldea Annexo -C1 and Rumahbali Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Aldea Annexo -C1 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aldea Annexo -C1?

The registered promoter entity is Puranik Builders Limited, a company as per the filing. Its CIN U99999MH1990PLC056451 and GSTIN 27AABCP0109R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aldea Annexo -C1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aldea Annexo -C1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aldea Annexo -C1?

The professionals named in the filing: Architect: Vastushilpa Associates; Architect: Crystal Arch; Engineer: G. A. Bhilare Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aldea Annexo -C1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aldea Annexo -C1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aldea Annexo -C1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.