AKSHAY VISTA
By AKSHAY SKYSCRAPERS PRIVATE LIMITED
RG-MH-49550 · RERA P52100052741 · Last updated on MahaRERA portal: 15 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 13 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 completed earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AKSHAY VISTA is a Residential / Group Housing project by AKSHAY SKYSCRAPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100052741 on 22 Sep 2023. Possession is promised by 31 May 2027. The completion date has moved by 13 months from the original filing. 17 of the 58 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameAKSHAY VISTA
- TypeResidential / Group Housing
- Location
- KASHID PARK
- PIMPLE GURAV
- Pimpale Gurav
- Haveli
- Pune
- 411061
- Pincode411061
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052741
- ReraGenie IDRG-MH-49550
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Sep 2023
- Promised completion31 May 2027
- Revised completionRevised to 31 May 2027 (originally 30 Apr 2026)
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 15 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A- WING | NA | 7 | 7 | 54 | 4 | 58 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.
A- WING: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed38
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A- WING | NA | Rs 24.09 cr | Rs 11.54 cr |
| - | NA | Rs 2.92 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KIRTI LUNKAD |
| Engineer | ASHISH PRAKASH DAHAKE |
| Engineer | Tushar Somnath Nirgude |
| Chartered Accountant | MUTTHA AND LAHOTI |
| Partner | Role in project |
|---|---|
| AKSHAY SKYSCRAPERS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterlabour issue and finance constraint.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 May 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2027
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Latest Aproved Layout (1 OF 6 ).pdf | 15 May 2026 |
| Building plan approvalFile: Latest Aproved Building paln (2 OF 6 ).pdf | 15 May 2026 |
| Building plan approvalFile: Latest Aproved Building paln (3 OF 6 ).pdf | 15 May 2026 |
| Building plan approvalFile: Latest Aproved Building paln (4 OF 6 ).pdf | 15 May 2026 |
| Building plan approvalFile: Latest Aproved Building paln (5 OF 6 ).pdf | 15 May 2026 |
| Building plan approvalFile: Latest Aproved Building paln (6 OF 6 ).pdf | 15 May 2026 |
| Commencement certificateFile: LATEST COMMENCEMENT CERTIFICATE.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: Form 1 upto 31-03-2026.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: Form 2 upto 31-03-2026.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: Form 3 upto 31-03-2026.pdf | 15 May 2026 |
| Form 2A (FY 2023-2024)File: form 2A - 2023-24.pdf | 13 Feb 2026 |
| Form 2A (FY 2024-2025)File: form 2A - 2024-25.pdf | 13 Feb 2026 |
| Form 1File: form 1 upto 31-12-2025.pdf | 23 Jan 2026 |
| Form 2File: form 2 upto 31-12-2025.pdf | 23 Jan 2026 |
| Form 3File: form 3 upto 31-12-2025.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 31-12-2025.pdf | 23 Jan 2026 |
| Form 1File: form 1 upto 30-09-2025.pdf | 20 Jan 2026 |
| Form 2File: form 2 upto 30-09-2025.pdf | 20 Jan 2026 |
| Form 3File: form 3 upto 30-09-2025.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 30-09-2025.pdf | 20 Jan 2026 |
| Form 1File: form 1 upto 31-12-2024.pdf | 20 Jan 2026 |
| Form 2File: form 2 upto 31-12-2024.pdf | 20 Jan 2026 |
| Form 3File: form 3 upto 31-12-2024.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 31-12-2024.pdf | 20 Jan 2026 |
| Form 1File: form 1 upto 30-09-2024.pdf | 20 Jan 2026 |
| Form 2File: form 2 upto 30-09-2024.pdf | 20 Jan 2026 |
| Form 3File: form 3 upto 30-09-2024.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 30-09-2024.pdf | 20 Jan 2026 |
| Form 1File: form 1 upto 30-06-2024.pdf | 20 Jan 2026 |
| Form 2File: form 2 upto 30-06-2024.pdf | 20 Jan 2026 |
| Form 3File: form 3 upto 30-06-2024.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 30-06-2024.pdf | 20 Jan 2026 |
| Form 1File: form 1 upto 31-03-2024.pdf | 20 Jan 2026 |
| Form 2File: form 2 upto 31-03-2024.pdf | 20 Jan 2026 |
| Form 3File: form 3 upto 31-03-2024.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 31-03-2024.pdf | 20 Jan 2026 |
| Form 1File: form 1 upto 31-12-2023.pdf | 20 Jan 2026 |
| Form 2File: form 2 upto 31-12-2023.pdf | 20 Jan 2026 |
| Form 3File: form 3 upto 31-12-2023.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 31-12-2023.pdf | 20 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf | 20 Jan 2026 |
| Form 1File: form 1 upto 30-06-2025.pdf | 16 Dec 2025 |
| Form 2File: form 2 upto 30-06-2025.pdf | 16 Dec 2025 |
| Form 3File: form 3 upto 30-06-2025.pdf | 16 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY upto 30-06-2025.pdf | 16 Dec 2025 |
| Form 1File: form 1 upto 31-03-2025.pdf | 16 Dec 2025 |
| Form 2File: form 2 upto 31-03-2025.pdf | 16 Dec 2025 |
| Form 3File: form 3 upto 31-03-2025.pdf | 16 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY upto 31-03-2025.pdf | 16 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q4 FY 2024-25 Akshay Vista.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q4 FY 2024-25 Akshay Vista.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Q4 FY 2024-25 Akshay Vista.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q3 FY 2024-25 Akshay Vista.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q3 FY 2024-25 Akshay Vista.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Q3 FY 2024-25 Akshay Vista_.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q2 FY 2024-25 Akshay Vista.pdf | 29 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q2 FY 2024-25 Akshay Vista.pdf | 29 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Q2 FY 2024-25 Akshay Vista.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q1 FY 2024-25 Akshay Vista CMP.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q1 FY 2024-25 Akshay Vista CMP.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AVI Q1 2024-25 CMP.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Akshay Vista - Form 1.pdf | 5 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AKSHAY VISTA - FORM - 2 ENGINEER CERTIFICATE.pdf | 5 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AKSHAY VISTA - FORM - 2A ENGINEER CERTIFICATE.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf | 5 Jun 2024 |
| Other - LegalFile: Reply to Akshay Vista.pdf | 5 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Akshay Vista Form 1.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AKSHAY VISTA FORM 2.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Akshay Vista Form 3.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q3 FY 2023-24 Akshay Vista.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Q3 FY 2023-24 Akshay Vista.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q3 FY 2023-24 Akshay Vista.pdf | 17 Jan 2024 |
| Proforma of Agreement for saleFile: AKSHAY VISTA - RERA DRAFT AGREEMENT - 23-08-2023.pdf | 23 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: AV deviation clauses - Agreement to sale Draft23082023.pdf | 23 Aug 2023 |
| Declaration about Commencement CertificateFile: C C Declration.pdf | 10 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 10 Jul 2023 |
| Proforma of Allotment letterFile: ANNEXURE-1 AL.pdf | 12 Jun 2023 |
| Declaration in FORM BFile: Form B.pdf | 9 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE PAC.pdf | 9 Jun 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| AKSHAY VRINDAVAN - A,B BUILDINGP52100078891 | WADMUKHWADI, Pune | 150 | Jan 2025 | Ongoing | Apr 2028 | Not due yet |
| AKSHAY VIRNDAVAN | SR. NO. 131 1 1A 13 NEAR BALAJI TEMPLE PUNE ALANDI ROAD WADHMUKHWADI 412105 | 506 | - | Ongoing | Jun 2027 | Jun 2027 |
| AKSHAY CLASSIC | PIMPLE SAUDAGAR | 35 | - | Completed | Jun 2019 | May 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AKSHAY VISTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PIMPLE GURAV13,700+ in Pune
Filed coordinates, straight-line distance. 103 registered projects within 2 km.
Samrajya Wing GH
Garve Patil Construction Company
Eastern River Residency Wing C
Kishor Shankar Garve
KRISHNA PRABHA AANGAN
RATHOD AND SONS
Eastern River Residency Wing D
Kishor Shankar Garve
Eastern River Residency Wing B
Kishor Shankar Garve
Samrajya C Wing
Garve Patil Construction Company
Builder: AKSHAY SKYSCRAPERS PRIVATE LIMITED
AKSHAY SKYSCRAPERS PRIVATE LIMITED has 3 registrations on MahaRERA, including AKSHAY VRINDAVAN and AKSHAY VISTA. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AKSHAY VISTA is delayed beyond 31 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AKSHAY VISTA?
The registered promoter entity is AKSHAY SKYSCRAPERS PRIVATE LIMITED, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AKSHAY VISTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AKSHAY VISTA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AKSHAY VISTA?
The professionals named in the filing: Architect: KIRTI LUNKAD; Engineer: ASHISH PRAKASH DAHAKE; Engineer: Tushar Somnath Nirgude; Chartered Accountant: MUTTHA AND LAHOTI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AKSHAY VISTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback