Home / Browse projects / Pune, Maharashtra / AKSHAY VISTA

Registered No litigation declared Residential / Group Housing project

AKSHAY VISTA

By AKSHAY SKYSCRAPERS PRIVATE LIMITED

RG-MH-49550 · RERA P52100052741 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 13 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 13 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
41 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

AKSHAY VISTA is a Residential / Group Housing project by AKSHAY SKYSCRAPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100052741 on 22 Sep 2023. Possession is promised by 31 May 2027. The completion date has moved by 13 months from the original filing. 17 of the 58 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameAKSHAY VISTA
  • TypeResidential / Group Housing
  • Location
    • KASHID PARK
    • PIMPLE GURAV
    • Pimpale Gurav
    • Haveli
    • Pune
    • 411061
  • Pincode411061
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052741
  • ReraGenie IDRG-MH-49550

Builder

  • NameAKSHAY SKYSCRAPERS PRIVATE LIMITED
  • Entity typePartnership
  • PartnerPOOJA AJAY CHOPDA
  • Other registrations2 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredSep 2023First promiseApr 2026Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2023
  • Promised completion31 May 2027
  • Revised completionRevised to 31 May 2027 (originally 30 Apr 2026)
  • Buildings1 building record
  • Documents filed100 files

Current status

29%17 of 58 units booked
42.7%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A- WINGNA7754458

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

A- WING: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered38

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,477 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Feb 2026

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNCIPAL CORPORATION
Permissible FSI9100.0
Proposed, not sanctioned3,482 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD PUNE
Estimated costRs 27.01 cr
Cost incurredRs 11.54 cr
Work done42.73%
BuildingWingEstimatedIncurred
A- WINGNARs 24.09 crRs 11.54 cr
-NARs 2.92 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRTI LUNKAD
EngineerASHISH PRAKASH DAHAKE
EngineerTushar Somnath Nirgude
Chartered AccountantMUTTHA AND LAHOTI
PartnerRole in project
AKSHAY SKYSCRAPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17022619864Apr 2026 → May 2027

Reason as filed by the promoterlabour issue and finance constraint.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Latest Aproved Layout (1 OF 6 ).pdf15 May 2026
Building plan approvalFile: Latest Aproved Building paln (2 OF 6 ).pdf15 May 2026
Building plan approvalFile: Latest Aproved Building paln (3 OF 6 ).pdf15 May 2026
Building plan approvalFile: Latest Aproved Building paln (4 OF 6 ).pdf15 May 2026
Building plan approvalFile: Latest Aproved Building paln (5 OF 6 ).pdf15 May 2026
Building plan approvalFile: Latest Aproved Building paln (6 OF 6 ).pdf15 May 2026
Commencement certificateFile: LATEST COMMENCEMENT CERTIFICATE.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 upto 31-03-2026.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 upto 31-03-2026.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 upto 31-03-2026.pdf15 May 2026
Form 2A (FY 2023-2024)File: form 2A - 2023-24.pdf13 Feb 2026
Form 2A (FY 2024-2025)File: form 2A - 2024-25.pdf13 Feb 2026
Form 1File: form 1 upto 31-12-2025.pdf23 Jan 2026
Form 2File: form 2 upto 31-12-2025.pdf23 Jan 2026
Form 3File: form 3 upto 31-12-2025.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 31-12-2025.pdf23 Jan 2026
Form 1File: form 1 upto 30-09-2025.pdf20 Jan 2026
Form 2File: form 2 upto 30-09-2025.pdf20 Jan 2026
Form 3File: form 3 upto 30-09-2025.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 30-09-2025.pdf20 Jan 2026
Form 1File: form 1 upto 31-12-2024.pdf20 Jan 2026
Form 2File: form 2 upto 31-12-2024.pdf20 Jan 2026
Form 3File: form 3 upto 31-12-2024.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 31-12-2024.pdf20 Jan 2026
Form 1File: form 1 upto 30-09-2024.pdf20 Jan 2026
Form 2File: form 2 upto 30-09-2024.pdf20 Jan 2026
Form 3File: form 3 upto 30-09-2024.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 30-09-2024.pdf20 Jan 2026
Form 1File: form 1 upto 30-06-2024.pdf20 Jan 2026
Form 2File: form 2 upto 30-06-2024.pdf20 Jan 2026
Form 3File: form 3 upto 30-06-2024.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 30-06-2024.pdf20 Jan 2026
Form 1File: form 1 upto 31-03-2024.pdf20 Jan 2026
Form 2File: form 2 upto 31-03-2024.pdf20 Jan 2026
Form 3File: form 3 upto 31-03-2024.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 31-03-2024.pdf20 Jan 2026
Form 1File: form 1 upto 31-12-2023.pdf20 Jan 2026
Form 2File: form 2 upto 31-12-2023.pdf20 Jan 2026
Form 3File: form 3 upto 31-12-2023.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY UPTO 31-12-2023.pdf20 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf20 Jan 2026
Form 1File: form 1 upto 30-06-2025.pdf16 Dec 2025
Form 2File: form 2 upto 30-06-2025.pdf16 Dec 2025
Form 3File: form 3 upto 30-06-2025.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY upto 30-06-2025.pdf16 Dec 2025
Form 1File: form 1 upto 31-03-2025.pdf16 Dec 2025
Form 2File: form 2 upto 31-03-2025.pdf16 Dec 2025
Form 3File: form 3 upto 31-03-2025.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY upto 31-03-2025.pdf16 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q4 FY 2024-25 Akshay Vista.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q4 FY 2024-25 Akshay Vista.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Q4 FY 2024-25 Akshay Vista.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q3 FY 2024-25 Akshay Vista.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q3 FY 2024-25 Akshay Vista.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Q3 FY 2024-25 Akshay Vista_.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q2 FY 2024-25 Akshay Vista.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q2 FY 2024-25 Akshay Vista.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Q2 FY 2024-25 Akshay Vista.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q1 FY 2024-25 Akshay Vista CMP.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q1 FY 2024-25 Akshay Vista CMP.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AVI Q1 2024-25 CMP.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Akshay Vista - Form 1.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AKSHAY VISTA - FORM - 2 ENGINEER CERTIFICATE.pdf5 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AKSHAY VISTA - FORM - 2A ENGINEER CERTIFICATE.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf5 Jun 2024
Other - LegalFile: Reply to Akshay Vista.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Akshay Vista Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AKSHAY VISTA FORM 2.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Akshay Vista Form 3.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Q3 FY 2023-24 Akshay Vista.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Q3 FY 2023-24 Akshay Vista.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Q3 FY 2023-24 Akshay Vista.pdf17 Jan 2024
Proforma of Agreement for saleFile: AKSHAY VISTA - RERA DRAFT AGREEMENT - 23-08-2023.pdf23 Aug 2023
Deviation Report with respect to model copy of AgreementFile: AV deviation clauses - Agreement to sale Draft23082023.pdf23 Aug 2023
Declaration about Commencement CertificateFile: C C Declration.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Jul 2023
Proforma of Allotment letterFile: ANNEXURE-1 AL.pdf12 Jun 2023
Declaration in FORM BFile: Form B.pdf9 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE PAC.pdf9 Jun 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AKSHAY VRINDAVAN - A,B BUILDINGP52100078891WADMUKHWADI, Pune150Jan 2025OngoingApr 2028Not due yet
AKSHAY VIRNDAVANSR. NO. 131 1 1A 13 NEAR BALAJI TEMPLE PUNE ALANDI ROAD WADHMUKHWADI 412105506-OngoingJun 2027Jun 2027
AKSHAY CLASSICPIMPLE SAUDAGAR35-CompletedJun 2019May 2019

How this compares with Pune

29%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 13 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKSHAY VISTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIMPLE GURAV13,700+ in Pune

2 kmAKSHAY VISTACompleted 29Lapsed / revoked 22Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: AKSHAY SKYSCRAPERS PRIVATE LIMITED

AKSHAY SKYSCRAPERS PRIVATE LIMITED has 3 registrations on MahaRERA, including AKSHAY VRINDAVAN and AKSHAY VISTA. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AKSHAY VISTA is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSHAY VISTA?

The registered promoter entity is AKSHAY SKYSCRAPERS PRIVATE LIMITED, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSHAY VISTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKSHAY VISTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKSHAY VISTA?

The professionals named in the filing: Architect: KIRTI LUNKAD; Engineer: ASHISH PRAKASH DAHAKE; Engineer: Tushar Somnath Nirgude; Chartered Accountant: MUTTHA AND LAHOTI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKSHAY VISTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSHAY VISTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSHAY VISTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.