ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / AKSHAR NEST

Registered No litigation declared Residential / Group Housing project

AKSHAR NEST

By AKSHAR DEVELOPERS

RG-MH-15529 · RERA P51600045473 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2032Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
27 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

AKSHAR NEST is a Residential / Group Housing project by AKSHAR DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600045473 on 19 May 2022. Possession is promised by 31 Mar 2032. 29 of the 56 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameAKSHAR NEST
  • TypeResidential / Group Housing
  • Location
    • MERI-RASBIHARI LINK ROAD
    • OPP. AUDUMBAR LAWNS
    • Nashik (M Corp.)
    • Nashik
    • 422003
  • Pincode422003
  • RERA no.P51600045473
  • ReraGenie IDRG-MH-15529

Builder

  • NameAKSHAR DEVELOPERS
  • Entity typePartnership
  • PartnersCHANDULAL JAYANTIBHAI POKAR, KANTILAL JAYANTIBHAI POKAR, JAGANNATH VITTHALRAO SURYAWANSHI
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2022PromisedMar 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 May 2022
  • Promised completion31 Mar 2032
  • Revised completionNone
  • Buildings2 building records
  • Documents filed58 files

Current status

52%29 of 56 units booked
54.0%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA8728028
WING BNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34
BuildingClosed/CoveredTotal
WING A1717
WING B1717

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,416 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI4983.09
Proposed, not sanctioned4,983 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFIRST FLOOR SAUBHAGYA MANGAL KARYALAY DINDORI ROAD MHASRUL NASHIK 422004
Estimated costRs 13.75 cr
Cost incurredRs 7.43 cr
Work done54.05%
BuildingWingEstimatedIncurred
WING ANARs 6.68 crRs 5.96 cr
WING BNARs 6.68 crRs 1.31 cr
-NARs 39.10 lakhRs 16.26 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURESH N PATEL
EngineerSUNIL H PATEL
Chartered AccountantMAYA DIXITKUMAR RAMANI
Chartered AccountantDILIP SHANTILAL PATEL
PartnerRole in project
AKSHAR DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Nov 2023

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_compressed.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2_compressed.pdf20 Apr 2026
Withdrawal Update Form 3File: SELF CLARIFICATION Q1 FY 24-25.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A (1).pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1_compressed.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2_compressed.pdf17 Jan 2026
Withdrawal Update Form 3File: SELF CLARIFICATION Q1 FY 24-25.pdf17 Jan 2026
Withdrawal Update Form 1File: FORM 1_compressed.pdf15 Oct 2025
Withdrawal Update Form 2File: FORM 2_compressed.pdf15 Oct 2025
Withdrawal Update Form 3File: SELF CLARIFICATION Q1 FY 24-25.pdf15 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q4 FY 24-25.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY MARCH 25.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY DEC 24.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q3 FY 24-25.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A NEW FY 2023-2024.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 AKSHAR DEVELOPERS FY 23-24.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q2 FY 24-25.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY SEP 24.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY JUNE 24.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q1 FY 24-25.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY MARCH 24.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q4 FY 23-24.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY DEC 23.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q3 FY 23-24.pdf24 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPANCY.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q2 FY 23-24.pdf11 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AKSHAR DEVELOPERS FORM 5.PDF6 Nov 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY SEP 23.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A NEW.pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q2 FY 22-23.pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q3 FY 22-23.pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q4 FY 22-23.pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q1 FY 23-24.pdf29 Aug 2023
Disclosure of sold/ booked inventoryFile: INVENTORY JUNE 23.pdf21 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A NEW.pdf8 May 2023
Disclosure of sold/ booked inventoryFile: INVENTORY MARCH 23.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: INVENTORY DEC 22.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: INVENTORY JUNE 22.pdf25 Nov 2022
Disclosure of sold/ booked inventoryFile: INVENTORY SEP 22.pdf25 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: NEW COMMENCEMENT AKSHAR NEST.pdf12 May 2022
CERSAI detailsFile: ASSET BASED SEARCH FINAL.pdf12 May 2022
Building plan approvalFile: BUILDING PLAN.pdf4 May 2022
Building plan approvalFile: BUILDING PLAN 2.pdf4 May 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf4 May 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 2.pdf4 May 2022
Layout approvalFile: LAYOUT FINAL.pdf27 Apr 2022
Details of encumbrancesFile: ENCUMBRANCE.pdf27 Apr 2022
Copy of Layout Approval (in case of layout)File: LAYOUT FINAL.pdf27 Apr 2022
Declaration about Commencement CertificateFile: FORMAT D.pdf27 Apr 2022
Declaration in FORM BFile: FORM B (1)_compressed.pdf27 Apr 2022
CERSAI detailsFile: CERSAI.pdf27 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CER_compressed.pdf27 Apr 2022
PAN CardFile: PAN CARD.pdf20 Apr 2022
Copy of the legal title reportFile: NEW TITTLE SEARCH AKSHAR DEVELOPERS KULKARNI1.pdf20 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf20 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf20 Apr 2022
Proforma of Allotment letterFile: AGRI FOR SALE.pdf20 Apr 2022
Proforma of Allotment letterFile: ALLOTMENT-LETTER-AKSHAR NEST (1).pdf20 Apr 2022

How this compares with Nashik

52%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKSHAR NEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP. AUDUMBAR LAWNS4,100+ in Nashik

Builder: AKSHAR DEVELOPERS

Akshar Developers has 5 registrations on MahaRERA, including Nirmal Arcade and Akshar Business Park- Phase I. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if AKSHAR NEST is delayed beyond 31 Mar 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSHAR NEST?

The registered promoter entity is AKSHAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSHAR NEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKSHAR NEST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKSHAR NEST?

The professionals named in the filing: Architect: SURESH N PATEL; Engineer: SUNIL H PATEL; Chartered Accountant: MAYA DIXITKUMAR RAMANI; Chartered Accountant: DILIP SHANTILAL PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKSHAR NEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSHAR NEST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSHAR NEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.