ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / AKSHAR EMPERIA GARDEN

Completed No litigation declared Residential / Group Housing project

AKSHAR EMPERIA GARDEN

By EMPERIA REALTY

RG-MH-12430 · RERA P52000011872 · Last updated on MahaRERA portal: 1 Nov 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
22 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 97%
0Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

AKSHAR EMPERIA GARDEN is a Residential / Group Housing project by EMPERIA REALTY in Raigarh, Maharashtra, registered with MahaRERA as P52000011872 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameAKSHAR EMPERIA GARDEN
  • TypeResidential / Group Housing
  • Location
    • BEHIND ANTONY GARAGE
    • RASAYANI PATALGANGA
    • Karade Kh.
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000011872
  • ReraGenie IDRG-MH-12430

Builder

  • NameEMPERIA REALTY
  • Entity typePartnership
  • PartnersDANJI DEVA DAKA, GOVIND MEGHJI PATEL, DHIRAJ SAVJIBHAI MANJERI, RAMESH KANJI ARETHIYA, KISHORE BACHUBHAI MUJAT, RAJENDRAKUMAR RAMESHBHAI CHAUDHARY
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ORCHIDNA90000
ROSENA90000
TULIPNA90000
ASTERNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 1 Nov 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 97%.

ORCHID88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
ROSE88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
TULIP83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises89%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks87%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
ASTER85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 1 Nov 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes75%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9583.48
Proposed, not sanctioned9,583 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASHI BRANCH,BIG SPLASH, SECTOR 17, VASHI,NAVI MUMBAI,400703

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAN.ARCH
EngineerB.S SUKTHANKAR & ASSOCIATES
PartnerRole in project
EMPERIA REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Nov 2021

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf1 Nov 2021
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf1 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf1 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate _compressed.pdf1 Oct 2019
Certificates of CA (Form 3)File: AKSHAR EMPERIA GARDEN_compressed.pdf1 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECT.pdf20 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: COMPRESSED_KARADE RERA CERTIFICATE OF ARCHITECT_BLDG.pdf11 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: COMPRESSED_KARADE RERA CERTIFICATE OF ARCHITECT_BLDG.pdf11 Feb 2019
Certificates of CA (Form 3)File: FORM 3 - EMPERIA GARDEN.pdf11 Jan 2019
Certificates of CA (Form 5)File: Form no5 emperia realty.pdf23 Nov 2018
Certificates of CA (Form 3)File: FORM 3.pdf7 Sep 2018
Certificates of CA (Form 3)File: EMPERIA_FORM 3_Q2.pdf12 Mar 2018
Certificates of CA (Form 3)File: Form 3.pdf21 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 EMPERIA.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 EMPERIA REALTY-compressed.pdf30 Jul 2017
Certificates of CA (Form 3)File: EMPERIA GARDEN FORM 3.pdf30 Jul 2017
Proforma of Allotment letterFile: EMPERIA REALTY Agreement as per RERA.pdf30 Jul 2017
Proforma of Allotment letterFile: EMPERIA REALTY-ALLOT LETTER as per RERA.pdf30 Jul 2017
Declaration in FORM BFile: Form B -compressed.pdf26 Jul 2017
Layout approvalFile: LAYOUT PLAN_1.pdf21 Jul 2017
Building plan approvalFile: LAYOUT PLAN_2.pdf21 Jul 2017
Building plan approvalFile: LAYOUT PLAN_3.pdf21 Jul 2017
Building plan approvalFile: LAYOUT PLAN_4.pdf21 Jul 2017
PAN CardFile: EMPERIA REALTY PAN CARD.pdf21 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf21 Jul 2017
Details of encumbrancesFile: DETAILS OF ENCUMBRANCES.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN_1.pdf21 Jul 2017
Building Plan Approval (IOD)File: LAYOUT PLAN_2.pdf21 Jul 2017
Building Plan Approval (IOD)File: LAYOUT PLAN_3.pdf21 Jul 2017
Building Plan Approval (IOD)File: LAYOUT PLAN_4.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC-Compressed.pdf21 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AKSHAR RIVERGATE PLOT BP52000032008CHAVANE, Raigarh1Dec 2021OngoingDec 2025Not delivered

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKSHAR EMPERIA GARDEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RASAYANI PATALGANGA5,900+ in Raigarh

2 kmAKSHAR EMPERIA GARDENCompleted 3Lapsed / revoked 4Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: EMPERIA REALTY

EMPERIA REALTY has 4 registrations on MahaRERA, including AKSHAR EMPERIA GARDEN and AKSHAR RIVERGATE - PLOT F. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if AKSHAR EMPERIA GARDEN is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSHAR EMPERIA GARDEN?

The registered promoter entity is EMPERIA REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSHAR EMPERIA GARDEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKSHAR EMPERIA GARDEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKSHAR EMPERIA GARDEN?

The professionals named in the filing: Architect: AN.ARCH; Engineer: B.S SUKTHANKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKSHAR EMPERIA GARDEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSHAR EMPERIA GARDEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSHAR EMPERIA GARDEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.