Home / Browse projects / Pune, Maharashtra / AKSHA VRUNDAVAN III

Registered No litigation declared Others project

AKSHA VRUNDAVAN III

By AKSHA ENTERPRISES

RG-MH-53653 · RERA P52100051549 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
126 of 236Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

AKSHA VRUNDAVAN III is a Others project by AKSHA ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100051549 on 27 Jun 2023. Possession is promised by 31 Dec 2027. 110 of the 236 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameAKSHA VRUNDAVAN III
  • TypeOthers
  • Location
    • CHIKHALI
    • Haveli
    • Pune
    • 412114
  • Pincode412114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051549
  • ReraGenie IDRG-MH-53653

Builder

  • NameAKSHA ENTERPRISES
  • Entity typePartnership
  • PartnersAKRAM ZIKRULLAH CHAUDHARY, SHABANA FAHAD KHAN, SABIRABANO ZIKRULLAH CHAUDHARY
  • PartnerZIKRULLAH ABBASALI CHAUDHARY
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1

Key dates

this monthRegisteredJun 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed88 files

Current status

47%110 of 236 units booked
92.5%Work done, per cost certificate

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA14131026108
WING BNA14131280128

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

WING A70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
WING B70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,718 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jul 2025
LandownerVillageDistrict
PANDIT JADHAVChikhaliPune
VISHNU MAHADU JADHAVChikhaliPune
BABY RAMCHANDRA JADHAVcharholi khPune
DIGAMBER KESHAV KAHANEcharholi khPune
KISHOR DIGAMBAR KAHANEcharholi khPune
SATISH DIGAMBAR KANAHNEcharholi khPune
SANTOSH DIGAMBAR KAHANEcharholi khPune
RAKESH KISHOR KAHANEcharholi khPune
YATISH KISHOR KAHANEcharholi khPune
ROHINI DILIP DAHITULEcharholi khPune
DNYANOBA MAHADU JADHAVcharholi khPune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI21067.26
Proposed, not sanctioned16,367 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHINCHWAD, PUNE
Estimated costRs 35.20 cr
Cost incurredRs 32.55 cr
Work done92.47%
BuildingWingEstimatedIncurred
WING ANARs 17.50 crRs 16.27 cr
WING BNARs 17.50 crRs 16.27 cr
-NARs 20.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDREAM SPACE ARCHITECTS
EngineerRAJU SATHE
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
AKSHA ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4 FY 25-26.pdf19 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 FY 25-26.pdf19 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 25-26.pdf19 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3 FY 25-26.pdf20 Jan 2026
Withdrawal Update Form 1File: Q2 FORM 1 AKSHA VRUNDAVAN III ARCHITECT CERTIFICATE.pdf19 Oct 2025
Withdrawal Update Form 2File: Q2 FORM 2 AKSHA VRUNDAVAN III ENGINEER CERTIFICATE.pdf19 Oct 2025
Withdrawal Update Form 3File: Q2 FORM 3 AKSHA ENTERPRISES CA CERTIFICATE.pdf19 Oct 2025
Withdrawal Update Form 1File: AKSHA VRUNDAVAN 3 FORM 1 ARCHITECT CERTIFICATE.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE AKSHA VRU III.pdf17 Oct 2025
Withdrawal Update Form 3File: VRU III FORM 3 CA CERTIFICATE.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Final.pdf30 Sep 2025
Form 1File: FORM 1 AKSHA VRUNDAVAN lll.pdf17 Jul 2025
Form 2File: FORM 2 AKSHA VRU lll.pdf17 Jul 2025
Form 3File: Form 3 Final.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Final.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AKSHA VRUNDAVAN lll.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AKSHA VRU lll.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory Final.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE AKSHA VRUNDAVAN III.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE AKSHA VRUNDAVAN III.pdf13 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final upload.pdf18 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A upload.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 upload_4_11zon.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 upload_3_11zon.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 upload_2_11zon.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 upload_1_11zon.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final upload.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 upload.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOrm 1 upload.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOrm 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VRU III 1549.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE AKSHA ENTERPRISE VRU III.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD-BOOK INVENTORY VRUNDAVAN III A,B WING.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: SOld circular5.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Circular upload.pdf20 Jul 2024
Proforma of Agreement for saleFile: Draft Copy of AKSHA VRUNDAVAN III.pdf8 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Draft Copy of AKSHA VRUNDAVAN III.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: VRU III AB WING SOLD-BOOK INVENTORY.pdf23 Nov 2023
Declaration about Commencement CertificateFile: VRU III AB WING SOLD-BOOK INVENTORY.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VRU III AB FORM 1.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VRU III AB WING FORM2.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1AKSHA VRUNDAVAN III ARCHITECT CERTIFICATE.pdf29 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AKSHA VRUNDAVAN III ENGINEER CERTIFICATE.pdf29 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY AKSHA VRUNDAVAN III WING.pdf29 Jul 2023
Other - FinanceFile: DECLARATION FINANCE LANDOWNERS.pdf5 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf3 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final UPLOAD.pdf1 Jun 2023
Layout approvalFile: Layout 1 final.pdf27 May 2023
Copy of Layout Approval (in case of layout)File: Layout 1 final.pdf27 May 2023
CERSAI detailsFile: Final Cersai.pdf27 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: AKRAM CHAUDHARY.pdf27 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SABIRABANO CHAUDHARY.pdf27 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SHABANA KHAN.pdf27 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ZIKRULLAH CHAUDHARY.pdf27 May 2023
Details of encumbrances concerned to FinanceFile: VRU II NO ENCUMBRANCE LETTER.pdf18 May 2023
Details of encumbrances concerned to LegalFile: VRU II NO ENCUMBRANCE LETTER.pdf18 May 2023
Declaration about Commencement CertificateFile: VRU III DECLARATION OF COMMENCEMENT CERTIFICATE.pdf18 May 2023
Declaration in FORM BFile: VRU III FORM B PROMOTER.pdf18 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf18 May 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION AL.pdf18 May 2023
Deviation Report with respect to model copy of AgreementFile: VRU III AGG to SALE.pdf18 May 2023
Proforma of Agreement for saleFile: AGREEMENT TO SALE_compressed.pdf25 Apr 2023
Building plan approvalFile: 2 A AND B WING BASEMENT PLAN.pdf9 Mar 2023
Building plan approvalFile: 3 A WING SHOP AND 1ST FLOOR PLAN.pdf9 Mar 2023
Building plan approvalFile: 5 A WING ELEVATION.pdf9 Mar 2023
Building plan approvalFile: 4 A WING 2 TO 12TH FLOOR PLAN_compressed.pdf9 Mar 2023
Building plan approvalFile: 5 A WING ELEVATION.pdf9 Mar 2023
Building plan approvalFile: 6 B WING 1 TO 12 TH FLOOR PLAN_compressed_compressed.pdf9 Mar 2023
Building plan approvalFile: 7 B WING 13TH FLOOR PLAN_compressed.pdf9 Mar 2023
Building plan approvalFile: 8 B WING ELEVATION_compressed.pdf9 Mar 2023
PAN CardFile: PAN OF FIRM.pdf9 Mar 2023
Copy of the legal title reportFile: TITLE REPORT.pdf9 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 A AND B WING BASEMENT PLAN.pdf9 Mar 2023

How this compares with Pune

47%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKSHA VRUNDAVAN III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKHALI13,700+ in Pune

2 kmAKSHA VRUNDAVAN IIICompleted 77Lapsed / revoked 40Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: AKSHA ENTERPRISES

AKSHA ENTERPRISES has 5 registrations on MahaRERA, including AKSHA VRUNDAVAN and AKSHA VRUNDAVAN II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AKSHA VRUNDAVAN III is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSHA VRUNDAVAN III?

The registered promoter entity is AKSHA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSHA VRUNDAVAN III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKSHA VRUNDAVAN III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKSHA VRUNDAVAN III?

The professionals named in the filing: Architect: DREAM SPACE ARCHITECTS; Engineer: RAJU SATHE; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKSHA VRUNDAVAN III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSHA VRUNDAVAN III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSHA VRUNDAVAN III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.