ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / AKSHA ELEGANCE

Registered No litigation declared Others project

AKSHA ELEGANCE

By CRYSTAL PROPERTIES

RG-MH-16969 · RERA P52100027566 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 31 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 31 months from the original
9 of 11Construction stages donefurthest along: Installation of Lifts, 95%
0 of 31Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

AKSHA ELEGANCE is a Others project by CRYSTAL PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100027566 on 16 Dec 2020. Possession is promised by 30 Jan 2027. The completion date has moved by 31 months from the original filing. 31 of the 31 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameAKSHA ELEGANCE
  • TypeOthers
  • Location
    • MORE WASTI
    • CHIKHALI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412114
  • Pincode412114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100027566
  • ReraGenie IDRG-MH-16969

Builder

  • NameCRYSTAL PROPERTIES
  • Entity typePartnership
  • PartnersAKRAM ZIKRULLAH CHAUDHARY, IMRAN ABDULREHMAN CHAUDHARY, BHARAT LALARAM CHOUDHARY
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2020First promiseJun 2024Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Dec 2020
  • Promised completion30 Jan 2027
  • Revised completionRevised to 30 Jan 2027 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed100 files

Current status

100%31 of 31 units booked
95.0%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AKSHA ELEGANCE C WINGNA9031031

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

AKSHA ELEGANCE C WING: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,776 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025
LandownerVillageDistrict
MOHAMMAD ABRAR CHOUDHARYPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI7035.52
Proposed, not sanctioned7,036 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEMPIRE ESTATE CHINCHWAD PUNE 411019
Estimated costRs 2.99 cr
Cost incurredRs 2.84 cr
Work done95.0%
BuildingWingEstimatedIncurred
AKSHA ELEGANCE C WINGNARs 2.99 crRs 2.84 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDREAM SPACE ARCHITECTS
EngineerRAM RANDIVE AND ASSOICIATES
EngineerRaju Shrimant Sathe
Chartered AccountantCA VAIBHAV MODI
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
CRYSTAL PROPERTIES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024099Jun 2024 → Jun 2025

Reason as filed by the promoterNon availability of resources

EA15062621376Jun 2024 → Sep 2026

Reason as filed by the promoterthe project is already completed as on 04/12/2025, however, the FSI details reflected on the portal are mismatched with the latest sanctioned plan. Therefore, we request an extension to enable us to apply for the necessary corrections after approval of the extension application. In view of the above facts and circumstances, since the Completion Certificate has already been duly received, We humbly request the Hon’ble Authority to kindly consider our application and grant extension of the project registration till 30/09/2026.

P52100027566/WarJun 2024 → Jan 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jan 2027

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM-2A ELEGANCE (2024-2025).pdf16 Jun 2026
Form 2A (FY 2025-2026)File: FORM-2A FY 25-26.pdf16 Jun 2026
Withdrawal Update Form 1File: AKSHA ELEGANCE 1 FORM 1 ARCHITECT CERTIFICATE.pdf6 Jan 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE AKSHA ELEGANCE.pdf6 Jan 2026
Withdrawal Update Form 3File: ELEGANCE FORM 3 CA CERTIFICATE.pdf6 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Final.pdf30 Sep 2025
Form 1File: FORM 1.pdf17 Jul 2025
Form 2File: FORM 2.pdf17 Jul 2025
Form 3File: Form 3 Final.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AKSHA ELEGANCE C WING.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ELEGANCE C WING.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY ELEGANCE C WING WING.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE AKSHA ELEGANCE C WING.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE CRYSTAL PROPERTIES.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE AKSHA ELEGANCE C WING.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY AKSHA ELEGANCE C WING.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY AKSHA ELEGANCE C-WING.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 upload.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE CRYSTAL PROPERTIES.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ELEGANCE C WING.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 upload.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Upto Q3.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 22 Q4.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2021.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2122.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2223.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2324.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Q3 2122.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Q4 2122.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Q1.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Q2.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Q3.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Q4.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Q1.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4_compressed.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD and BOOK INVENTORY ELEGANCE C WING.pdf26 Jun 2024
Declaration in FORM BFile: FORM - B upload.pdf25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CRYSTAL PROPERTIES.pdf25 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD-BOOK INVENTORY ELEGANCE C WING.pdf25 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (CA and Promoter Signed).pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ELEGANCE C WING FORM 1.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ELEGANCE C WING FORM2.pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: ELEGANCE C WING SOLD-BOOK INVENTORY.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (20 - 21).pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: compressed_edited_Form 3 (Q3 21 - 22).pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: compressed_edited_Form 3 (Q4 21 - 22).pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT'S CERTIFICATE CRYSTAL PROPERTIES.pdf29 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AKSHA ELEGANCE.pdf29 Jul 2023
Disclosure of sold/ booked inventoryFile: AKSHA ELEGANCE C-WING SOLD BOOKED INVENTORY.pdf29 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CRYSTAL Final.pdf15 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 scanned.pdf25 Nov 2022

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 31 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKSHA ELEGANCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKHALI13,700+ in Pune

2 kmAKSHA ELEGANCECompleted 42Lapsed / revoked 23Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: CRYSTAL PROPERTIES

CRYSTAL PROPERTIES has 3 registrations on MahaRERA, including 33 keshav kunj and AKSHA ELEGENCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AKSHA ELEGANCE is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSHA ELEGANCE?

The registered promoter entity is CRYSTAL PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSHA ELEGANCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKSHA ELEGANCE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKSHA ELEGANCE?

The professionals named in the filing: Architect: DREAM SPACE ARCHITECTS; Engineer: RAM RANDIVE AND ASSOICIATES; Engineer: Raju Shrimant Sathe; Chartered Accountant: CA VAIBHAV MODI; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKSHA ELEGANCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSHA ELEGANCE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSHA ELEGANCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.