Home / Browse projects / Nashik, Maharashtra / AKRUTI HEIGHTS WING A
AKRUTI HEIGHTS WING A
RG-MH-03890 · RERA P51600022925 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AKRUTI HEIGHTS WING A is a Residential / Group Housing project by Akruti Buildcon in Nashik, Maharashtra, registered with MahaRERA as P51600022925 on 1 Nov 2019. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 36 months from the original filing. 26 of the 27 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameAKRUTI HEIGHTS WING A
- TypeResidential / Group Housing
- Location
- S NO 383/2/4 PLOT NO 30 TO 36
- NEAR A T PAWAR ASHRAM SCHOOL BORGAD NASHIK
- Nashik (M Corp.)
- Nashik
- 422003
- Pincode422003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600022925
- ReraGenie IDRG-MH-03890
Builder
- NameAkruti Buildcon
- Entity typePartnership
- GSTIN27AANFA1232F1ZT
- PartnersDevchand Dhanji Chaudhari, Jayaben Devchand Chaudhari, Chandulal Jayantibhai Pokar, Kantilal Jayantibhai Pokar, Kirtikumar Devchand Chaudhari, Manish Devchand Chaudhari, Nikita Kirtikumar Chaudhari, Bhakti Manish Chaudhari, Priya Haresh Chaudhari, Hemlata Chandulal Pokar, Maniben Jayantilal Pokar, Kokila Kantilal Pokar and 6 more
- Other registrations4 more →
- Completed2 of 5
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Nov 2019
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Mar 2023)
- Buildings1 building record
- Documents filed70 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AKRUTI HEIGHTS WING A | NA | 8 | 7 | 24 | 3 | 27 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
AKRUTI HEIGHTS WING A: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR SURESH N PATEL N PATEL |
| Engineer | SUNIL H PATEL H PATEL |
| Chartered Accountant | CA NANDIKISHOR PATIL DILIP PATIL |
| Chartered Accountant | DILIP SHANTILAL PATEL |
| Partner | Role in project |
|---|---|
| Akruti Buildcon | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWORK DELAYED DUE TO HEALTH ISSUES
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Oct 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Oct 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AR CER NEW.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Akruti Heights - structure cert.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: SELF CLARIFICATION Q1 - FY 24-25.pdf | 20 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: AR CER NEW.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: Akruti Heights - structure cert.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: SELF CLARIFICATION Q1 - FY 24-25.pdf | 17 Jan 2026 |
| Form 5 (FY 2023-2024)File: AKRUTI BUILDCON FORM 5 FY 23-24.pdf | 25 Nov 2025 |
| Withdrawal Update Form 1File: AR CER NEW.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Akruti Heights - structure cert.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: SELF CLARIFICATION Q1 - FY 24-25.pdf | 15 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 AKRUTI BUILDCON FY 2024-2025.pdf | 10 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q4 - FY 24-25.pdf | 9 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY MARCH 25.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q3 - FY 24-25.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY DEC 24.pdf | 27 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AKRUTI BUILDCON FORM 5 FY 23-24.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q2 - FY 24-25.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY SEP 24.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY JUNE 24.pdf | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q1 - FY 24-25.pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY MARCH 24.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q4 - FY 23-24.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY DEC 23.pdf | 21 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q3 - FY 23-24.pdf | 21 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY SEP 23.pdf | 13 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CFERTIFICATE FORM 3 AKRUTI.pdf | 15 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A NEW.pdf | 25 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q2 - FY 22-23.pdf | 25 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q3 - FY 22-23.pdf | 25 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q4 - FY 22-23.pdf | 25 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q1 - FY 23-24.pdf | 25 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY JUNE 23.pdf | 23 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A NEW.pdf | 9 May 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY MARCH 23.pdf | 15 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY DEC 22.pdf | 15 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: AKRUTI BUILDCON-INVENTORY-31-3-22.PDF | 24 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: AKRUTI BUILDCON-INVENTORY-30-6-22.PDF | 24 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: AKRUTI BUILDCON-INVENTORY-30-9-22.PDF | 24 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5 CA CERTIFICATE-AKRUTI BUILDCON.PDF | 18 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AKRUTI FORM 5 ruT FY 20-21.PDF | 19 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A MARCH 21_compressed.pdf | 19 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A JUNE 21_compressed.pdf | 19 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A SEP 21 NEW_compressed.pdf | 19 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A DEC 21.pdf | 19 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: INVENTORY AKRUTI JUNE 21.pdf | 19 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: INVENTORY AKRUTI SEP 21.pdf | 19 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: INVENTORY AKRUTI DEC 21.pdf | 19 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AKRUTI HEIGHTS A FORM 5 FY19-20.PDF | 2 Apr 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2 A SEP 20_compressed.pdf | 25 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A DEC 20_compressed.pdf | 25 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A MARCH 20-min.pdf | 7 Jul 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A JUNE 20-min.pdf | 7 Jul 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: AKRUTI BUILDCON 2A.pdf | 20 Feb 2020 |
| Details of encumbrancesFile: NO ENCUMRANCE CERTIFICATE.PDF | 25 Oct 2019 |
| Declaration in FORM BFile: FORM B_compressed.pdf | 20 Oct 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2 A_compressed.pdf | 20 Oct 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf | 20 Oct 2019 |
| Layout approvalFile: AKRUTI BUILDCON LAYOUT.pdf | 16 Oct 2019 |
| Building plan approvalFile: BUILDING PLAN.pdf | 16 Oct 2019 |
| PAN CardFile: PAN CARD.pdf | 16 Oct 2019 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 16 Oct 2019 |
| Copy of Layout Approval (in case of layout)File: AKRUTI BUILDCON LAYOUT.pdf | 16 Oct 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf | 16 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTI_compressed.pdf | 16 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CER_compressed.pdf | 16 Oct 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Akruti Heights - structure cert.pdf | 16 Oct 2019 |
| Proforma of Allotment letterFile: ALLOTMENT-LETTER-AKRUTI HEIGHTS.pdf | 16 Oct 2019 |
| Proforma of Allotment letterFile: AGREEMENT OF SALE DRAFT AKRUTI BUILDCON.pdf | 16 Oct 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AKRUTI HEIGHTS WING A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR A T PAWAR ASHRAM SCHOOL BORGAD NASHIK4,100+ in Nashik
Filed coordinates, straight-line distance. 73 registered projects within 2 km.
THE PLATINUM MALL BY PARKSYDE
JAIKUMAR CONSTRUCTIONS LTD
AVADH UTOPIA
DHATRAK CONSTRUWELL
ROONGTA ELEGANTE APARTMENT
ROONGTA LANDMARKS LLP
Siddhivinayak Trade Center
Dhatrak Constructions
G SQUARE
GIRI ASSOCIATE CONSTRUCTION
SADGURU HOMES
SHREE SADGURU HOMES
See every Nashik project, with the district possession charts
Builder: Akruti Buildcon
Akruti Buildcon has 5 registrations on MahaRERA, including Nisarg Serene and ADITI PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that AKRUTI HEIGHTS WING A shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AKRUTI HEIGHTS WING A is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AKRUTI HEIGHTS WING A?
The registered promoter entity is Akruti Buildcon, a partnership as per the filing. Its GSTIN 27AANFA1232F1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AKRUTI HEIGHTS WING A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AKRUTI HEIGHTS WING A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AKRUTI HEIGHTS WING A?
The professionals named in the filing: Architect: AR SURESH N PATEL N PATEL; Engineer: SUNIL H PATEL H PATEL; Chartered Accountant: CA NANDIKISHOR PATIL DILIP PATIL; Chartered Accountant: DILIP SHANTILAL PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AKRUTI HEIGHTS WING A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback