ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Ajmera Sikova

Completed No litigation declared Commercial project

Ajmera Sikova

By Ajmera Realty & Infra India Ltd

RG-MH-27764 · RERA P51800024066 · Last updated on MahaRERA portal: 12 Dec 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Internal walls, 95%
1Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Ajmera Sikova is a Commercial project by Ajmera Realty & Infra India Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024066 on 17 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAjmera Sikova
  • TypeCommercial
  • Location
    • Sikova Embroideries Marg
    • Ghatkoper West
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • RERA no.P51800024066
  • ReraGenie IDRG-MH-27764

Builder

  • NameAjmera Realty & Infra India Ltd
  • Entity typeCompany
  • DirectorDhaval Rajnikant Ajmera
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredJan 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Jan 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ajmera SikovaNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Ajmera Sikova: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed347

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots347
Closed/Covered347

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,290 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Ajmera Realty& Infra India LimitedAndheriMumbai Suburban
M/s Sikova Embroideries Private LimitedKurlaMumbai Suburban

Approvals and building plan

Permissible FSI14699.98
Proposed, not sanctioned3,980 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMaurya Estate Branch, Lokhandwala, Andheri West, Mumbai 400053

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAakar Architects and Consultant
EngineerMahimtura Consultant Pvt Ltd
Chartered AccountantParthiv & Co Chartered Accountants
PartnerRole in project
Ajmera Realty & Infra India Ltd-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504720Ajmera Realty & Infra India LtdAmplinno India Private Limited (Respondent)31/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Dec 2023

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sikova OC.pdf12 Dec 2023
Architect’s Certificate on Completion of Project (Form 4)File: Sikova Form 4.pdf12 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA SIKOVA Q2 FY 23-24 Signed.pdf9 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sikova Sold Unsold.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 60_6147_AJMERA SIKOVA (Form 5) 2022-23.pdf20 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIKOVA FORM 3.pdf2 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sikova signed.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sikova.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sIKOVA fORM-2.pdf18 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sikova Form 2A.pdf18 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARIIL-RERA Revised Certificate- Ajmera Sikova FORM 3 V3 Signed.pdf18 May 2023
Disclosure of sold/ booked inventoryFile: Sikova Sold Unsold.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sikova F1.pdf28 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SIKOVA CA CERTIFICATE FORM 5 2019-2020.pdf17 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SIKOVA CA CERTIFICATE FORM 5 2020-2021.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Sikova.pdf13 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sikova Form 2A.pdf3 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIKOVA Form 3.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate -Dec.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Signed Sikova Arch Cert 07012023.pdf9 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sikova Form 5 2021-2022.pdf23 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Sikova.pdf9 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sikova CA Certificate Q2 Signed.pdf2 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A Quality certificate (Sikova).pdf21 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIKOVA.pdf6 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sikova Signed.PDF18 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD Unsold as on TILL 31 MARCH 2022.pdf16 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3 SIKOVA Q4 CA CERTIFICATE Signed.pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sikova Form 1 Arch Cert March.pdf13 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sikova Quality Cert Form 2A March.pdf24 Mar 2022
Disclosure of sold/ booked inventoryFile: Sikova Sold Unsold.pdf11 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sikova Form 3 CA Cerificate for Project Cost.pdf4 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sikova Quality Certificate Form 2A.pdf23 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf9 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sikova architect.pdf1 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a sikova.pdf1 Nov 2021
Layout approvalFile: SIKOVA AMENDED PLAN.pdf23 Aug 2021
Copy of Layout Approval (in case of layout)File: SIKOVA AMENDED PLAN.pdf23 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIKOVA CA 1062021_compressed1.pdf15 Jun 2021
Details of encumbrancesFile: 1.pdf3 Jun 2021
Details of encumbrancesFile: 2.pdf3 Jun 2021
Details of encumbrancesFile: 3.pdf3 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIKOVA.pdf12 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIKOVA ca_compressed.pdf11 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARIIL-RERA_000035.pdf14 Jan 2020
Layout approvalFile: PLAN.pdf13 Jan 2020
Building plan approvalFile: IOD.pdf13 Jan 2020
Copy of the legal title reportFile: title report.pdf13 Jan 2020
Details of encumbrancesFile: declaration.pdf13 Jan 2020
Copy of Layout Approval (in case of layout)File: PLAN.pdf13 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf13 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Jan 2020
Declaration in FORM BFile: scan0028.pdf13 Jan 2020
Proforma of Allotment letterFile: Allotment Letter (3).pdf13 Jan 2020
Proforma of Allotment letterFile: agreement.pdf13 Jan 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AJMERA MANHATTAN BUILDING 4A AND 4BPR1180002500822Aanik, Mumbai Suburban239Sep 2025OngoingJul 2030Not due yet
BUILDING NO 6 AJMERA GREENFINITY A WING B WINGP51800052226WADALA EAST, Mumbai Suburban172Jul 2023OngoingMay 2027Not due yet

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ajmera Sikova on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkoper West6,700+ in Mumbai Suburban

Builder: Ajmera Realty & Infra India Ltd

Ajmera Realty & Infra India Ltd. has 4 registrations on MahaRERA, including Ajmera Treon and Ajmera Zeon. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ajmera Sikova is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ajmera Sikova?

The registered promoter entity is Ajmera Realty & Infra India Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ajmera Sikova?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ajmera Sikova?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ajmera Sikova?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ajmera Sikova?

The professionals named in the filing: Architect: Aakar Architects and Consultant; Engineer: Mahimtura Consultant Pvt Ltd; Chartered Accountant: Parthiv & Co Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ajmera Sikova?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ajmera Sikova. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ajmera Sikova to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.