Home / Browse projects / Sangli, Maharashtra / AJANTA COMPLEX

Completed No litigation declared Others project

AJANTA COMPLEX

By KAVITA RAMCHANDRA PAWAR

RG-MH-73027 · RERA P53100048987 · Last updated on MahaRERA portal: 9 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
19 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

AJANTA COMPLEX is a Others project by KAVITA RAMCHANDRA PAWAR in Sangli, Maharashtra, registered with MahaRERA as P53100048987 on 24 Jan 2023. The registration is recorded completed; possession was promised by 20 Jun 2026. The completion date has moved by 12 months from the original filing. 6 of the 25 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameAJANTA COMPLEX
  • TypeOthers
  • Location
    • -
    • DATTANAGAR
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100048987
  • ReraGenie IDRG-MH-73027

Builder

  • NameKAVITA RAMCHANDRA PAWAR
  • Entity typeIndividual

Key dates

this monthRegisteredJan 2023First promiseJun 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jan 2023
  • Promised completion20 Jun 2026
  • Revised completionRevised to 20 Jun 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed87 files

Current status

24%6 of 25 units booked
35.5%Work done, per cost certificate

Figures as on 9 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AJANTA COMPLEXNA6620525

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

AJANTA COMPLEX: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 9 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area557 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on20 Jun 2025

Approvals and building plan

Sanctioning authoritySANGLI MIRAJ AND KUPWAD MUNICIPAL CORPORATION
Permissible FSI1431.18
Proposed, not sanctioned1,431 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKeshar Bhavan, Ground Floor, Sangli
Estimated costRs 4.00 cr
Cost incurredRs 1.42 cr
Work done35.48%
BuildingWingEstimatedIncurred
AJANTA COMPLEXNARs 4.00 crRs 1.42 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAMCHANDRA A PAWAR
EngineerDR NAVNATH PHADATRE
EngineerRAMCHANDRA A PAWAR
Chartered AccountantLAXMAN K GAIKWAD
Chartered AccountantSIDDHESHWAR VITTHAL MALI
PartnerRole in project
KAVITA RAMCHANDRA PAWAR-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23062501709Jun 2025 → Jun 2026

Reason as filed by the promoterslow booking response

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf9 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf9 Feb 2026
Withdrawal Update Form 3File: FORM-3.pdf9 Feb 2026
Occupational CertificateFile: OC CERTIFICATE.pdf9 Feb 2026
Withdrawal Update Form 1File: form 1.pdf19 Dec 2025
Withdrawal Update Form 1File: form 1.pdf19 Dec 2025
Withdrawal Update Form 1File: form 1.pdf19 Dec 2025
Withdrawal Update Form 2File: form 2.pdf19 Dec 2025
Withdrawal Update Form 2File: form 2.pdf19 Dec 2025
Withdrawal Update Form 2File: form 2.pdf19 Dec 2025
Withdrawal Update Form 3File: FORM 3.pdf19 Dec 2025
Withdrawal Update Form 3File: FORM 3.pdf19 Dec 2025
Withdrawal Update Form 3File: FORM 3.pdf19 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf9 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf9 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf9 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf9 Sep 2025
Withdrawal Update Form 3File: FORM 3 NEW.pdf9 Sep 2025
Withdrawal Update Form 3File: FORM 3 NEW.pdf9 Sep 2025
Form 1File: FORM-1 31-03-25.pdf18 Jun 2025
Form 2File: FORM-2 31-03-25.pdf18 Jun 2025
Form 3File: form 3.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-03-25.pdf18 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A (1).pdf18 Jun 2025
Form 5 (FY 2024-2025)File: from 5.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 31-03-25.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 31-03-25.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31-03-25.pdf10 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31-03-25.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 31-12-24.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 20-01-25.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 31-12-24.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: sold.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3_compressed.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD NEW.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf13 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A.pdf13 May 2024
Disclosure of sold/ booked inventoryFile: sold.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM3 NEW.pdf9 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23 new.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf20 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FROM 2A - 22-23.pdf20 Feb 2024
Disclosure of sold/ booked inventoryFile: BookedInventory.pdf20 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf5 Dec 2023
Disclosure of sold/ booked inventoryFile: Book Inventory.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTI.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf4 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EngineerCertificate.pdf4 Aug 2023
Disclosure of sold/ booked inventoryFile: Book Inventory.pdf4 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf4 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: order no 39.pdf2 Jan 2023
Declaration in FORM BFile: FROM B.pdf26 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 NEW121.pdf26 Dec 2022
Layout approvalFile: mojani nakasha.pdf23 Dec 2022
Building plan approvalFile: APPROVED PLAN.pdf23 Dec 2022
PAN CardFile: PAN CARD1.pdf23 Dec 2022
Copy of the legal title reportFile: search report.pdf23 Dec 2022
Details of encumbrances concerned to FinanceFile: EC FINALCIAL.pdf23 Dec 2022
Details of encumbrances concerned to FinanceFile: EC LEGAL.pdf23 Dec 2022
Details of encumbrances concerned to LegalFile: EC FINALCIAL.pdf23 Dec 2022
Details of encumbrances concerned to LegalFile: EC LEGAL.pdf23 Dec 2022
Copy of Layout Approval (in case of layout)File: mojani nakasha.pdf23 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN.pdf23 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: building permission certificate.pdf23 Dec 2022
Declaration about Commencement CertificateFile: DCC1.pdf23 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate.pdf23 Dec 2022

How this compares with Sangli

24%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one moved by 12 months
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep AJANTA COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DATTANAGAR790+ in Sangli

Builder: KAVITA RAMCHANDRA PAWAR

KAVITA RAMCHANDRA PAWAR has 1 registration on MahaRERA, including AJANTA COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if AJANTA COMPLEX is delayed beyond 20 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AJANTA COMPLEX?

The registered promoter entity is KAVITA RAMCHANDRA PAWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AJANTA COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AJANTA COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AJANTA COMPLEX?

The professionals named in the filing: Architect: RAMCHANDRA A PAWAR; Engineer: DR NAVNATH PHADATRE; Engineer: RAMCHANDRA A PAWAR; Chartered Accountant: LAXMAN K GAIKWAD; Chartered Accountant: SIDDHESHWAR VITTHAL MALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AJANTA COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AJANTA COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AJANTA COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.