Home / Browse projects / Sangli, Maharashtra / AJANTA COMPLEX
AJANTA COMPLEX
RG-MH-73027 · RERA P53100048987 · Last updated on MahaRERA portal: 9 Feb 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AJANTA COMPLEX is a Others project by KAVITA RAMCHANDRA PAWAR in Sangli, Maharashtra, registered with MahaRERA as P53100048987 on 24 Jan 2023. The registration is recorded completed; possession was promised by 20 Jun 2026. The completion date has moved by 12 months from the original filing. 6 of the 25 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameAJANTA COMPLEX
- TypeOthers
- Location
- -
- DATTANAGAR
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100048987
- ReraGenie IDRG-MH-73027
Builder
- NameKAVITA RAMCHANDRA PAWAR
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Jan 2023
- Promised completion20 Jun 2026
- Revised completionRevised to 20 Jun 2026 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed87 files
Current status
Figures as on 9 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AJANTA COMPLEX | NA | 6 | 6 | 20 | 5 | 25 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.
AJANTA COMPLEX: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 9 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AJANTA COMPLEX | NA | Rs 4.00 cr | Rs 1.42 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAMCHANDRA A PAWAR |
| Engineer | DR NAVNATH PHADATRE |
| Engineer | RAMCHANDRA A PAWAR |
| Chartered Accountant | LAXMAN K GAIKWAD |
| Chartered Accountant | SIDDHESHWAR VITTHAL MALI |
| Partner | Role in project |
|---|---|
| KAVITA RAMCHANDRA PAWAR | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterslow booking response
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 9 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 9 Feb 2026 |
| Withdrawal Update Form 3File: FORM-3.pdf | 9 Feb 2026 |
| Occupational CertificateFile: OC CERTIFICATE.pdf | 9 Feb 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 19 Dec 2025 |
| Withdrawal Update Form 1File: form 1.pdf | 19 Dec 2025 |
| Withdrawal Update Form 1File: form 1.pdf | 19 Dec 2025 |
| Withdrawal Update Form 2File: form 2.pdf | 19 Dec 2025 |
| Withdrawal Update Form 2File: form 2.pdf | 19 Dec 2025 |
| Withdrawal Update Form 2File: form 2.pdf | 19 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 19 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 19 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 19 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 9 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 9 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 9 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 9 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3 NEW.pdf | 9 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3 NEW.pdf | 9 Sep 2025 |
| Form 1File: FORM-1 31-03-25.pdf | 18 Jun 2025 |
| Form 2File: FORM-2 31-03-25.pdf | 18 Jun 2025 |
| Form 3File: form 3.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-03-25.pdf | 18 Jun 2025 |
| Form 2A (FY 2024-2025)File: Form 2A (1).pdf | 18 Jun 2025 |
| Form 5 (FY 2024-2025)File: from 5.pdf | 18 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 31-03-25.pdf | 10 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 31-03-25.pdf | 10 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31-03-25.pdf | 10 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31-03-25.pdf | 10 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 31-12-24.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 20-01-25.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 31-12-24.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3_compressed.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2.pdf | 24 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD.pdf | 24 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD NEW.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 13 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf | 13 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A.pdf | 13 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold.pdf | 13 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM3 NEW.pdf | 9 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23 new.pdf | 5 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 20 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf | 20 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FROM 2A - 22-23.pdf | 20 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: BookedInventory.pdf | 20 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3.pdf | 20 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 5 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 5 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Book Inventory.pdf | 5 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 5 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 12 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf | 12 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTI.pdf | 12 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 4 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EngineerCertificate.pdf | 4 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Book Inventory.pdf | 4 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 4 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: order no 39.pdf | 2 Jan 2023 |
| Declaration in FORM BFile: FROM B.pdf | 26 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 NEW121.pdf | 26 Dec 2022 |
| Layout approvalFile: mojani nakasha.pdf | 23 Dec 2022 |
| Building plan approvalFile: APPROVED PLAN.pdf | 23 Dec 2022 |
| PAN CardFile: PAN CARD1.pdf | 23 Dec 2022 |
| Copy of the legal title reportFile: search report.pdf | 23 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: EC FINALCIAL.pdf | 23 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: EC LEGAL.pdf | 23 Dec 2022 |
| Details of encumbrances concerned to LegalFile: EC FINALCIAL.pdf | 23 Dec 2022 |
| Details of encumbrances concerned to LegalFile: EC LEGAL.pdf | 23 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: mojani nakasha.pdf | 23 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN.pdf | 23 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: building permission certificate.pdf | 23 Dec 2022 |
| Declaration about Commencement CertificateFile: DCC1.pdf | 23 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate.pdf | 23 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
Keep AJANTA COMPLEX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DATTANAGAR790+ in Sangli
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
EVARA ESTATE
DSDB REALTY LLP
VISION CITY
VISION GROUP
NAKSHTRA
SHIV-NAKSHTRA DEVELOPERS LLP
SAHYADRISIDDHI
SAHYADRIDEVELOPERS
See every Sangli project, with the district possession charts
Builder: KAVITA RAMCHANDRA PAWAR
KAVITA RAMCHANDRA PAWAR has 1 registration on MahaRERA, including AJANTA COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if AJANTA COMPLEX is delayed beyond 20 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AJANTA COMPLEX?
The registered promoter entity is KAVITA RAMCHANDRA PAWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AJANTA COMPLEX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AJANTA COMPLEX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AJANTA COMPLEX?
The professionals named in the filing: Architect: RAMCHANDRA A PAWAR; Engineer: DR NAVNATH PHADATRE; Engineer: RAMCHANDRA A PAWAR; Chartered Accountant: LAXMAN K GAIKWAD; Chartered Accountant: SIDDHESHWAR VITTHAL MALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AJANTA COMPLEX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback