Aghav Resideny

By Aghav Developers

RG-MH-34659 · RERA P51700012349 · Last updated on MahaRERA portal: 28 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 52 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2027Possession promisedmoved 52 months from the original
38 of 77Construction stages doneacross 7 buildings; furthest along: External plumbing and external plaster, 90%
37 of 114Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 195 documents Report an error

Aghav Resideny is a Others project by Aghav Developers in Thane, Maharashtra, registered with MahaRERA as P51700012349 on 1 Sep 2017. Possession is promised by 30 Nov 2027. The completion date has moved by 52 months from the original filing. 77 of the 114 units on this registration are recorded sold or booked, and 38 of 77 construction stages are filed complete.

At a glance

Project

  • NameAghav Resideny
  • TypeOthers
  • Location
    • Atgaon
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700012349
  • ReraGenie IDRG-MH-34659

Builder

  • NameAghav Developers
  • Entity typePartnership
  • PartnerBalkrishna Ankush Aghav

Key dates

this monthRegisteredSep 2017First promiseJul 2023Revised toNov 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion30 Nov 2027
  • Revised completionRevised to 30 Nov 2027 (originally 1 Jul 2023)
  • Buildings7 building records
  • Documents filed195 files

Current status

68%77 of 114 units booked
41.4%Work done, per cost certificate

Figures as on 28 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA5530030
Wing CNA5520020
Wing DNA70000
Wing ENA80000
Wing FNA80000
Wing GNA65381048
Wing ANA4416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 28 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

38 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

Wing B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing D9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing E9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing F9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing G75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Wing A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes100%

Parking filed162

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots162
Closed/Covered3
Open Space159
BuildingClosed/CoveredOpen SpaceTotal
Wing B02222
Wing C02222
Wing D02222
Wing E12223
Wing F12223
Wing G12728
Wing A02222

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,030 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Sep 2026
LandownerVillageDistrict
A G DeveloperWashind (CT)Thane

Approvals and building plan

Sanctioning authorityOffce Of District Collector, Thane
Permissible FSI5776.48
Proposed, not sanctioned5,776 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGala no 2 and 3 Deepmoti old Agra Road Shahapur Dist Thane
Estimated costRs 40.76 cr
Cost incurredRs 16.89 cr
Work done41.43%
BuildingWingEstimatedIncurred
Wing DNARs 8.21 crRs 41.07 lakh
Wing ENARs 8.21 crRs 41.07 lakh
Wing FNARs 8.21 crRs 41.07 lakh
Wing GNARs 3.81 crRs 3.81 cr
Wing BNARs 3.79 crRs 3.79 cr
Wing CNARs 3.79 crRs 3.79 cr
Wing ANARs 3.79 crRs 3.79 cr
-NARs 92.11 lakhRs 46.06 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR K Khambayat
ArchitectRAJ ASSOCIATES
EngineerATUL KUDTARKAR
EngineerROHIT SHELAR
Chartered AccountantDivya Anil Jain
Chartered AccountantJAIN OSTWAL AND ASSOCIATES
PartnerRole in project
Aghav Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51700012349/WarJul 2023 → Nov 2027

Reason as filed by the promoterNA

EXT51700016738Jul 2023 → Jul 2027

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 52.48% allottees for purpose of extension of RERA registration period of the said project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Aug 2021

Documents filed195

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 195 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A - 2024 - 2025.pdf28 Sep 2026
Withdrawal Update Form 1File: Form 1 - March 2026.pdf18 Sep 2026
Withdrawal Update Form 1File: Form 1 - March 2026.pdf18 Sep 2026
Withdrawal Update Form 1File: Form 1 - June 2025.pdf18 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf18 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf18 Sep 2026
Withdrawal Update Form 1File: Form 1 - March 2025.pdf18 Sep 2026
Withdrawal Update Form 1File: Form 1 - March 2025.pdf18 Sep 2026
Withdrawal Update Form 2File: Form 2 - March 2026.pdf18 Sep 2026
Withdrawal Update Form 2File: Form 2 - March 2026.pdf18 Sep 2026
Withdrawal Update Form 2File: Form 2 - March 2026.pdf18 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf18 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf18 Sep 2026
Withdrawal Update Form 2File: Form 2 - March 2025.pdf18 Sep 2026
Withdrawal Update Form 2File: Form 2 - March 2025.pdf18 Sep 2026
Withdrawal Update Form 3File: Form 3 - June 2026.pdf18 Sep 2026
Withdrawal Update Form 3File: Form 3 - June 2026.pdf18 Sep 2026
Withdrawal Update Form 3File: Form 3 - June 2026.pdf18 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf18 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf18 Sep 2026
Withdrawal Update Form 3File: Form 3 - March 2025.pdf18 Sep 2026
Withdrawal Update Form 3File: Form 3 - June 2026.pdf18 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A - 2025 - 2026.pdf18 Sep 2026
Form 2A (FY 2024-2025)File: Form 2A - 2024 - 2025.pdf18 Sep 2026
Form 2A (FY 2022-2023)File: Form 2A - 2022 - 2023.pdf18 Sep 2026
Form 2A (FY 2021-2022)File: Form 2A - 2021 - 2022.pdf18 Sep 2026
Form 2A (FY 2020-2021)File: Form 2A - 2020 - 2021.pdf18 Sep 2026
Form 2A (FY 2019-2020)File: Form 2A - 2019 - 2020.pdf18 Sep 2026
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf17 Jul 2025
Certificates of CA (Form 3)File: Form 3 Rera Certificate.pdf17 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate.pdf17 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf26 Apr 2025
Certificates of CA (Form 3)File: Form 3.pdf26 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf26 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf4 Feb 2025
Certificates of CA (Form 3)File: Form NO 3.pdf4 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 (2).pdf4 Nov 2024
Certificates of CA (Form 3)File: CA Certificate Form 3_compressed.pdf4 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect Certificate Form 1 (2).pdf4 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form - 5 Aghav Developers.pdf4 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 qtr 1.pdf14 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Qtr 1.pdf14 Jul 2024
Certificates of CA (Form 3)File: Form 3 Qtr 1.pdf14 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 4th Qtr Period 01-01-24 to 31-03-24.pdf13 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 4th Qtr Period 01-01-24 to 31-03-24.pdf13 Apr 2024
Certificates of CA (Form 3)File: Form 3 4th Qtr Period 01-01-24 to 31-03-24.pdf13 Apr 2024
OtherFile: MOU CUM BARTER AGREEMENT A G DEVELOPERS.pdf23 Jan 2024
OtherFile: PARTNERSHIP DEED A G DEVELOPERS.pdf23 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Qtr 3.pdf12 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Qtr 3.pdf12 Jan 2024
Certificates of CA (Form 3)File: C A Form No 3.pdf12 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Form - 1.pdf16 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Form 2.pdf16 Oct 2023
Certificates of CA (Form 3)File: CA Form 3 01 July To 30 Aug 2023.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5 FY 2022 to 2023.pdf14 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form No 1.pdf10 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No 2.pdf10 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Site Eng Certificate.pdf10 Jul 2023
Certificates of CA (Form 3)File: Form No 3.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 31-03-17.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 31-03-18.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 31-03-19.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 31-03-20.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 31-03-21.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 31-12-21.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 31-03-22.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 30-06-22.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 30-09-22.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 31-12-22.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert as on 31-03-23.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert as on 31-03-17.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert as on 31-03-18.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert as on 31-03-19.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert as on 31-03-20.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert as on 31-03-21.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert as on 31-12-21.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert as on 31-03-22.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert as on 30-06-22.pdf23 Jun 2023

How this compares with Thane

68%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 52 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aghav Resideny on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Atgaon7,600+ in Thane

2 kmAghav ResidenyCompleted 3Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Aghav Developers

Aghav Developers has 1 registration on MahaRERA, including Aghav Resideny. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Aghav Resideny is delayed beyond 30 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aghav Resideny?

The registered promoter entity is Aghav Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aghav Resideny?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aghav Resideny?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aghav Resideny?

The professionals named in the filing: Architect: R K Khambayat; Architect: RAJ ASSOCIATES; Engineer: ATUL KUDTARKAR; Engineer: ROHIT SHELAR; Chartered Accountant: Divya Anil Jain; Chartered Accountant: JAIN OSTWAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aghav Resideny?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aghav Resideny. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aghav Resideny to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.