ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / AGARWAL SKYRISE

Registered No litigation declared Others project

AGARWAL SKYRISE

By LIPIKA ENTERPRISES

RG-MH-06262 · RERA P99000053167 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 95%
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

AGARWAL SKYRISE is a Others project by LIPIKA ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000053167 on 17 Oct 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameAGARWAL SKYRISE
  • TypeOthers
  • Location
    • Bolinj
    • Virar West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000053167
  • ReraGenie IDRG-MH-06262

Builder

  • NameLIPIKA ENTERPRISES
  • Entity typePartnership
  • PartnersLAXMINARAYAN PRABHUDAYAL AGARWAL, HEMANT LAXMINARAYAN AGARWAL

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1 Wing ANA230000
Building No 1 Wing BNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

Building No 1 Wing A79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Building No 1 Wing B79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered166
BuildingClosed/CoveredTotal
Building No 1 Wing A9090
Building No 1 Wing B7676

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,004 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation
Permissible FSI28435.64
Proposed, not sanctioned28,436 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUnit No 5/6/7, Viva Gokul Arcade, Viva Gokul Township, Agashi Rd, Virar West, Virar, Maharashtra, 40

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
LIPIKA ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Agarwal Skyrise as on Dec 2025.pdf17 Apr 2026
Form 2File: Form 2- Agarwal Skyrise as on Dec 2025.pdf17 Apr 2026
Form 3File: Form 3 of Agarwal Skyrise as on 31-12-2025.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 of Agarwal Skyrise as on 31-12-2025.pdf17 Apr 2026
Form 1File: Form 1 Agarwal Skyrise as on March 2026.pdf17 Apr 2026
Form 2File: Form 2- Agarwal Skyrise as on Mar 26.pdf17 Apr 2026
Form 3File: Form 3 of Agarwal Skyrise as on 31-03-2026.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Agarwal Skyrise as on Mar 26.pdf17 Apr 2026
Form 1File: Form 1 - Agarwal Skyrise as on Sep 2025.pdf22 Oct 2025
Form 2File: Form 2 - Agarwal Skyrise as on Sept 2025.pdf22 Oct 2025
Form 3File: Form 3 of Agarwal Skyrise as on 30-09-2025.pdf22 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 of Agarwal Skyrise as on 30-09-2025.pdf22 Oct 2025
Form 1File: Form 1 - Agarwal Skyrise as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - Agarwal Skyrise as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - Agarwal Skyrise as on June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Agarwal Skyrise as on June 2025.pdf20 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Agarwal Skyrise as on 31-03-2025 (SIGNED).pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Agarwal Skyrise as on March 2025 (SIGNED).pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Agarwal Skyrise as on March 2025.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Agarwal Skyrise as on Dec 2024 (SIGNED).pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Agarwal Skyrise as on Dec 2024 (SIGNED).pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Agarwal Skyrise as on Dec 2024.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Agarwal Skyrise as on 31-12-2024.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Agarwal Skyrise as on Sep 2024.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Agarwal Skyrise as on 30-09-2024 (SIGNED).pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Agarwal Skyrise as on Sept 2024.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Agarwal Skyrise Sep 2024.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Agarwal Skyrise for FY 2023-24.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Agarwal Skyrise as on June 2024_final.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Agarwal Skyrise as on 30-06-2024_final.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Agarwal Skyrise as on 30-06-2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AGARWAL SKYRISE FORM -1.pdf1 Jul 2024
Disclosure of sold/ booked inventoryFile: AGARWAL SKYRISE SOLD UNSOLD_compressed.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Agarwal Skyrise as on March 2024.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Agarwal Skyrise as on March 2024.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 AGARWAL SKYRISE.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Agarwal Skyrise as on Dec 2023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Agarwal Skyrise as on Dec 2023 (Signed).pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Agarwal Skyrise as on Dec 2023 (Signed).pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Agarwal Skyrise as on Dec 2023.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Agarwal Skyrise as on Dec 2023.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Agarwal Skyrise Form 3.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 (AGARWAL SKYRISE).pdf24 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Verification Agarwal skyrise.pdf12 Oct 2023
Other - TechnicalFile: CC Verification Agarwal skyrise.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Agarwal Skyrise.pdf26 Sep 2023
Layout approvalFile: SHEET 1 OF 9 LAYOUT PLAN_Stilt Highlighted.pdf11 Sep 2023
Copy of Layout Approval (in case of layout)File: SHEET 1 OF 9 LAYOUT PLAN_Stilt Highlighted.pdf11 Sep 2023
Other - LegalFile: KHARIDIKHAT 131 LIPIKA_Sale Deed_Compressed.pdf11 Sep 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE_By Rank_V3.pdf18 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1.pdf7 Aug 2023
Other - LegalFile: V1_TITLE DTD.pdf7 Aug 2023
Proforma of Allotment letterFile: Allotment Letter_By Rank_V3.pdf5 Aug 2023
Deviation Report with respect to Allotment letterFile: DEVIATION IN ALLOTMENT LETTER.pdf5 Aug 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION IN AGREEMENT OF SALE_compressed.pdf5 Aug 2023
Copy of the legal title reportFile: LEGAL TITLE REPORTS_compressed.pdf4 Aug 2023
Details of encumbrances concerned to FinanceFile: FINANCE ENCUMBRANCES.pdf4 Aug 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCES.pdf4 Aug 2023
Details of encumbrances concerned to LegalFile: FINANCE ENCUMBRANCES.pdf4 Aug 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCES.pdf4 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf4 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - LIPIKA ENTERPRISES.pdf4 Aug 2023
CERSAI detailsFile: Agarwal Skyrise_Cersai Report.pdf4 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS.pdf14 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ACCOUNT CERTIFICATE.pdf14 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION OF ACCOUNT.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD LIST AS ON 30-06-2023.pdf5 Jul 2023
Layout approvalFile: SHEET 1 OF 9 LAYOUT PLAN.pdf4 Jul 2023
Building plan approvalFile: N A ORDER.pdf4 Jul 2023
Building plan approvalFile: SHEET 2 OF 9 WING A.pdf4 Jul 2023
Building plan approvalFile: SHEET 3 OF 9 WING A.pdf4 Jul 2023
Building plan approvalFile: SHEET 4 OF 9 WING A.pdf4 Jul 2023
Building plan approvalFile: SHEET 5 OF 9 WING B.pdf4 Jul 2023
Building plan approvalFile: SHEET 6 OF 9 WING B.pdf4 Jul 2023
Building plan approvalFile: SHEET 7 OF 9 WING B.pdf4 Jul 2023
Building plan approvalFile: SHEET 8 OF 9 WING B.pdf4 Jul 2023
Building plan approvalFile: SHEET 9 OF 9 CLUB HOUSE.pdf4 Jul 2023
PAN CardFile: Pancard - LIPIKA ENTERPRISES.pdf4 Jul 2023
Copy of Layout Approval (in case of layout)File: SHEET 1 OF 9 LAYOUT PLAN.pdf4 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: N A ORDER.pdf4 Jul 2023

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AGARWAL SKYRISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar West3,200+ in Palghar

2 kmAGARWAL SKYRISECompleted 68Lapsed / revoked 42Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 174 registered projects within 2 km.

Builder: LIPIKA ENTERPRISES

LIPIKA ENTERPRISES has 1 registration on MahaRERA, including AGARWAL SKYRISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if AGARWAL SKYRISE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AGARWAL SKYRISE?

The registered promoter entity is LIPIKA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AGARWAL SKYRISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AGARWAL SKYRISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in AGARWAL SKYRISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AGARWAL SKYRISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AGARWAL SKYRISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.