AGAMI INFINITY PARK

By MAYURESH REALTY PRIVATE LIMITED

RG-MH-28094 · RERA P99000024826 · Last updated on MahaRERA portal: 28 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
7 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 12%
8 of 92Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

AGAMI INFINITY PARK is a Residential / Group Housing project by MAYURESH REALTY PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000024826 on 9 Mar 2020. Possession was promised by 30 Mar 2025 and is now 19 months past that date. The completion date has moved by 12 months from the original filing. 84 of the 92 units on this registration are recorded sold or booked, and 7 of 44 construction stages are filed complete.

At a glance

Project

  • NameAGAMI INFINITY PARK
  • TypeResidential / Group Housing
  • Location
    • J K IRANI PRIVATE ROAD
    • BOISAR
    • khairepada
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000024826
  • ReraGenie IDRG-MH-28094

Builder

  • NameMAYURESH REALTY PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AAGCM4338N1Z0
  • Managing DirectorJANARDAN SHANTARAM SANKHE
  • DirectorsRAHUL JANARDAN SANKHE, ROHIT CHINTAMAN PATIL
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

19 months past promisethis monthRegisteredMar 2020First promiseMar 2024Revised toMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Mar 2020
  • Promised completion30 Mar 2025
  • Revised completionRevised to 30 Mar 2025 (originally 30 Mar 2024)
  • Buildings4 building records
  • Documents filed46 files

Current status

91%84 of 92 units booked
81.0%Work done, per cost certificate

Figures as on 28 Mar 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 14-DNA44404
BUILDING NO- 14-D1NA44404
BUILDING NO-15 ENA9742042
BUILDING NO-15 -E1NA9742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 28 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 12%.

BUILDING NO 14-D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO- 14-D10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO-15 E27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO-15 -E137%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered36
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 14-D044
BUILDING NO- 14-D1044
BUILDING NO-15 E19019
BUILDING NO-15 -E117017

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,331 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2026
LandownerVillageDistrict
JANARDAN SHANTARAM SANKHEGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
RAHUL JANARDAN SANKHEGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
SHIRISH KISHORE SANKHEGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
SAMEER ARVIND PIMPLEYGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityCollector Palghar
Permissible FSI6330.91
Proposed, not sanctioned6,331 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHALLMARK PLAZA BANDRA EAST, MUMBAI 400051
Estimated costRs 13.60 cr
Cost incurredRs 11.02 cr
Work done81.03%
BuildingWingEstimatedIncurred
BUILDING NO-15 ENARs 5.79 crRs 5.79 cr
BUILDING NO-15 -E1NARs 5.23 crRs 5.23 cr
-NARs 2.58 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerJanardan Shantaram Sankhe
EngineerMitesh Parasiya
Chartered AccountantAVPR & Associates
Chartered AccountantRajeev & Associates
PartnerRole in project
MAYURESH REALTY PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000018812Mar 2024 → Mar 2025

Reason as filed by the promoterThe project faced delay due to the non-receipt of the Environmental Clearance certificate, due to which we could not commence any construction. The application for the certificate was submitted on 3rd June, 2021 but it approved on 24th November, 2022. Construction work on site was stopped during this time. We started construction only after receving EC which resulted in the delay.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Mar 2025

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Copy - Bldg No 15.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE for FY 23-24-FINAL.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE for FY 22-23-FINAL.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 22-23-final.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 23-24-FINAL.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Certificates of Engineer Form 2 _March-23_Singed.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Certificates of Engineer Form 2 _March-24-MRPL_Singed.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: 5Till31-3-23.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 11Till30-9-24.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 10Till30-6-24.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 9Till31-03-24.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 8Till31-12-23.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 7Till30-9-23.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 6Till30-6-23.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 4Till30-9-22.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 3Till30-6-22.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 2Till31-3-22.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: 1Till31-12-21.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Executed Form 5 FY 2021-22.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Executed Form 5 FY 2021-22.pdf15 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate_Form 2_March 2021-2022.pdf21 Jan 2023
Declaration about Commencement CertificateFile: Declearation of CC Agami Infinity Park 14-15-1.pdf17 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A - March - 2021 Mayuresh Realty Pvt Ltd.pdf17 Sep 2021
Disclosure of sold/ booked inventoryFile: Agami Infinity Park Booking 14-15.pdf17 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: MRPL- AIP- 14-15- FY 2019-20.pdf17 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: MRPL- AIP- 14-15- FY 2020-21.pdf17 Sep 2021
Copy of the legal title reportFile: Title Report.pdf29 Feb 2020
Details of encumbrancesFile: No Encumbrances .pdf29 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 Architect Certificate.pdf29 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Engineer Certifcate.pdf29 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate.pdf29 Feb 2020
Proforma of Allotment letterFile: Agreement and Allotment Draft.pdf29 Feb 2020
Declaration in FORM BFile: From B Affidavit Cum Declaration .pdf25 Feb 2020
Layout approvalFile: APPROVAL LAYOUT PLAN.pdf24 Feb 2020
Layout approvalFile: TYPE - D.PDF24 Feb 2020
Layout approvalFile: TYPE - E.PDF24 Feb 2020
Layout approvalFile: TYPE - E1.PDF24 Feb 2020
Building plan approvalFile: APPROVAL ORDER .pdf24 Feb 2020
PAN CardFile: Mayuresh Realty Pvt Ltd 001.pdf24 Feb 2020
Copy of Layout Approval (in case of layout)File: APPROVAL LAYOUT PLAN.pdf24 Feb 2020
Copy of Layout Approval (in case of layout)File: TYPE - D.PDF24 Feb 2020
Copy of Layout Approval (in case of layout)File: TYPE - E.PDF24 Feb 2020
Copy of Layout Approval (in case of layout)File: TYPE - E1.PDF24 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: APPROVAL ORDER .pdf24 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: TOWN PLANNING PERMISSION.pdf24 Feb 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ECO EDEN CITY- PHASE-ISURVEY NUMBER 63 PART 1 OLD SURVEY NUMBER 113 PART 1 VILLGAE KHAIRE228CompletedJul 2014Late, Mar 2016

How this compares with Palghar

91%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AGAMI INFINITY PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BOISAR3,200+ in Palghar

2 kmAGAMI INFINITY PARKCompleted 15Lapsed / revoked 17Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: MAYURESH REALTY PRIVATE LIMITED

MAYURESH REALTY PRIVATE LIMITED has 2 registrations on MahaRERA, including AGAMI INFINITY PARK and AGAMI INFINITY PARK. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that AGAMI INFINITY PARK shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AGAMI INFINITY PARK is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AGAMI INFINITY PARK?

The registered promoter entity is MAYURESH REALTY PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAGCM4338N1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AGAMI INFINITY PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AGAMI INFINITY PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AGAMI INFINITY PARK?

The professionals named in the filing: Engineer: Janardan Shantaram Sankhe; Engineer: Mitesh Parasiya; Chartered Accountant: AVPR & Associates; Chartered Accountant: Rajeev & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AGAMI INFINITY PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AGAMI INFINITY PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AGAMI INFINITY PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.