Agami Infinity Park 3

By AGAMI ENTERPRISES

RG-MH-23417 · RERA P99000078729 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
14 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 70%
112 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

Agami Infinity Park 3 is a Others project by AGAMI ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000078729 on 8 Jan 2025. Possession is promised by 31 Dec 2029. 40 of the 152 units on this registration are recorded sold or booked, and 14 of 55 construction stages are filed complete.

At a glance

Project

  • NameAgami Infinity Park 3
  • TypeOthers
  • Location
    • J K Irani road
    • Boisar East
    • khairepada
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000078729
  • ReraGenie IDRG-MH-23417

Builder

  • NameAGAMI ENTERPRISES
  • Entity typePartnership
  • PartnersJANARDAN SANKHE, RAHUL JANARDAN SANKHE
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jan 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings5 building records
  • Documents filed56 files

Current status

26%40 of 152 units booked
27.1%Work done, per cost certificate

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 5NA8828937
Building No 4NA8828937
Building No 3NA8726026
Building No 2NA7624024
Building No 1NA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 70%.

Building No 547%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 447%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 318%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 218%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 125%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes10%
Open ParkingNoNot applicable

Parking filed224

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots224
Closed/Covered93
Open Space131
BuildingClosed/CoveredOpen SpaceTotal
Building No 5103141
Building No 463238
Building No 3222244
Building No 2222244
Building No 1332457

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,051 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on6 Nov 2025

Approvals and building plan

Sanctioning authorityTOWN PLANNING AUTHORITY PALGHAR
Permissible FSI10266.64
Proposed, not sanctioned10,267 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchROAD NO 22 DISTTHANE MAHARASHTRA 400604
Estimated costRs 28.51 cr
Cost incurredRs 7.71 cr
Work done27.05%
BuildingWingEstimatedIncurred
Building No 1NARs 7.50 crRs 1.21 cr
Building No 5NARs 5.02 crRs 2.53 cr
Building No 4NARs 5.02 crRs 2.53 cr
Building No 3NARs 4.93 crRs 41.58 lakh
Building No 2NARs 4.54 crRs 41.58 lakh
-NARs 1.49 crRs 61.51 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANKHEANDASSOCIATES
EngineerJanardan Shantaram Sankhe
EngineerMitesh Shantilal Parasiya
Chartered Accountantswati Badaya
Chartered AccountantRAJEEV BADAYA
Chartered AccountantAVPR & ASSOCIATES
PartnerRole in project
AGAMI ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf2 Jun 2026
Withdrawal Update Form 2File: Form2.pdf2 Jun 2026
Withdrawal Update Form 3File: From 3.pdf2 Jun 2026
Withdrawal Update Form 1File: From1-Final.pdf19 Feb 2026
Withdrawal Update Form 2File: Form2-Final.pdf19 Feb 2026
Withdrawal Update Form 3File: Form 3-Final.pdf19 Feb 2026
Withdrawal Update Form 1File: From1-Final.pdf28 Jan 2026
Withdrawal Update Form 2File: Form2-Final.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3-Final.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: Form 5.pdf27 Jan 2026
Withdrawal Update Form 1File: Form1.pdf25 Nov 2025
Withdrawal Update Form 2File: Form2.pdf25 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf25 Nov 2025
Withdrawal Update Form 1File: Form1.pdf21 Nov 2025
Withdrawal Update Form 2File: Form2.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf21 Nov 2025
Form 1File: Form-1 Final.pdf17 Jun 2025
Form 2File: Form-2 Final.pdf17 Jun 2025
Form 3File: Form-3 Final.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory.pdf17 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RERA_compressed.pdf30 Dec 2024
Building plan approvalFile: Flool Plan 1-5.pdf24 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: EMAIL FROM THE COLLECTOR OFFICE.pdf24 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Flool Plan 1-5.pdf24 Dec 2024
Other - LegalFile: Reconstitution Deed - Agami Enterprises.pdf24 Dec 2024
Other - LegalFile: satbara.pdf24 Dec 2024
Declaration about Commencement CertificateFile: Format D DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf24 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest-- JS Sankhe.pdf24 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest-- Rahul Sankhe.pdf24 Dec 2024
Other - LegalFile: LAND INTRODUCTION AGREEMENT.pdf23 Dec 2024
Other - LegalFile: Other Legal_compressed (1).pdf23 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format 'A' Declaration about Separate Bank Account.pdf23 Dec 2024
Other - FinanceFile: Declaration.pdf23 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement (2).pdf23 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format ‘B’ Opening of RERA Designated Bank Account 23122024.pdf23 Dec 2024
Proforma of Agreement for saleFile: RERA AFS_Agami Infinity Park-3_18122024.pdf18 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: CA Certificate for disclosure of secured or unsecured finance.pdf18 Dec 2024
Layout approvalFile: LAYOUT_16122024.pdf17 Dec 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance-- Financial Encumbrance.pdf17 Dec 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance - Legal Encumbrance.pdf17 Dec 2024
Copy of Layout Approval (in case of layout)File: LAYOUT_16122024.pdf17 Dec 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance-- Financial Encumbrance.pdf17 Dec 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance - Legal Encumbrance.pdf17 Dec 2024
Other - TechnicalFile: Annxuer A Declaration-Cum-Undertaking.pdf17 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured or unsecured finance availed for the project.pdf17 Dec 2024
PAN CardFile: PAN CARD.pdf14 Dec 2024
Copy of the legal title reportFile: Agami Pearl_RERA Title Certificate.pdf14 Dec 2024
Proforma of Allotment letterFile: Allotment Letter_Agami Infinity Park-3.pdf14 Dec 2024
Declaration in FORM BFile: FORM -B - AFFIDAVIT CUM DECLARATION.pdf14 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-Architects Certificate.pdf14 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineers Certificate.pdf14 Dec 2024
Other - LegalFile: Non Encumbrance - Legal Encumbrance.pdf14 Dec 2024
CERSAI detailsFile: CERSAI_Search_Report_200330722662_72-1C- Residental.pdf14 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf14 Dec 2024
Other - TechnicalFile: Authorization Letter.pdf14 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviations in Agreement for Sale.pdf14 Dec 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
AGAMI SAPPHIRESURVEY NO 66-1 Village Khaire Boisar E Palghar 401501211CompletedSep 2024Oct 2023

How this compares with Palghar

26%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Agami Infinity Park 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Boisar East3,200+ in Palghar

2 kmAgami Infinity Park 3Completed 15Lapsed / revoked 18Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 67 registered projects within 2 km.

Builder: AGAMI ENTERPRISES

AGAMI ENTERPRISES has 2 registrations on MahaRERA, including AGAMI SAPPHIRE and Agami Infinity Park 3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Agami Infinity Park 3 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Agami Infinity Park 3?

The registered promoter entity is AGAMI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Agami Infinity Park 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Agami Infinity Park 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Agami Infinity Park 3?

The professionals named in the filing: Architect: SANKHEANDASSOCIATES; Engineer: Janardan Shantaram Sankhe; Engineer: Mitesh Shantilal Parasiya; Chartered Accountant: swati Badaya; Chartered Accountant: RAJEEV BADAYA; Chartered Accountant: AVPR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Agami Infinity Park 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Agami Infinity Park 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Agami Infinity Park 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.