Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Apr 2028Possession promisedno revision filed
4 of 17Construction stages donefurthest along: Masonry Construction, 4%
0 of 26Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 171 documents Report an error

AFTER THE RAIN-PHASE IIC is a Residential/Group Housing project by Total Environment Building Systems Private limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/300322/004795 on 30 Mar 2022. Possession is promised by 1 Apr 2028. 26 of the 26 units on this registration are recorded sold or booked, and 4 of 17 construction stages are filed complete.

At a glance

Project

  • NameAFTER THE RAIN-PHASE IIC
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 562157
  • Pincode562157
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/300322/004795
  • ReraGenie IDRG-KA-44592

Builder

  • NameTotal Environment Building Systems Private limited
  • Entity typeCompany
  • CINU45202KA1996PTC020790
  • GSTIN29AABCT9452F1Z2
  • Authorized SignatorySuresh Chandra Bhandari
  • CeoKarthick Dhanasekaran
  • DirectorsKamal Sagar, Shibanee Sagar
  • Project HeadKarthick Dhanasekaran
  • Other registrations4 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2022PromisedApr 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Mar 2022
  • Promised completion1 Apr 2028
  • Revised completionNone
  • Buildings6 building records
  • Documents filed171 files

Current status

100%26 of 26 units booked
67.3%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block 06---12012
Block 19---202
Block 20---202
Block 28---404
Block 29---404
Block 30---202

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 17 construction stages are filed complete. The stage furthest along is Masonry Construction, at 4%.

Building: 26% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)Not applicable
RCC or MS Framed structure100%
Masonry Construction4%
Plastering inside , outside & Ceiling4%
Joinery: Doors, Windows, Ventilators etc4%
Basic work of Water supply, Sanitary and Electrification4%
Dadoing, Skirting, Flooring, Tiles work (All types)4%
Railing and Grill fixing4%
Electrification, Water supply and Sanitary Finishing4%
Painting4%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)4%
Wardrobe, Showcase, Kitchen cabinet, Puja work4%
Elevation work4%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes20%
Sewage and Drainage SystemYes20%
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes20%
Electricity supply transformer and substationYes0%
Storm water drainsYes20%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes46%
Parks & Tree plantingYes5%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes74%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes100%
GymNoNot applicable
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesYes0%

Land and ownership9

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,700 sq m
Named landowners9
LandownerVillageDistrict
Total Environment Building Systems--
Total Environment Building Systems--
Total Environment Building Systems--
Total Environment Building Systems--
Total Environment Building Systems--
Total Environment Building Systems--
Total Environment Building Systems--
Total Environment Building Systems--
Total Environment Building Systems--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 108.81 cr
Cost incurredRs 73.18 cr
Spent of the estimate67.26%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 108.81 crRs 36.14 cr
On-site expenditure-Site Overhead-Rs 23.69 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)-Rs 13.35 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVarun Biltoria
EngineerPRAKASH CHANNAPPAGOUDAR
Chartered AccountantAnkush Jain

Litigation declared2

CaseCourtStatus
WP Nos, 23101/2022, 23102/2022, 23103/2022, 23020/2022, 23097/2022, 23059/2022, 23037/2022, 23106/2022 22858/2022, 23811/2022, 23826/2022,High Court of Karnataka-
WP 15729/2024/2024High Court of Karnataka-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed171

As listed on the registration, under the names the promoter filed them with; the newest 80 of 171 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/300322/004795 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 AFTER THE RAIN - PHASE IIC Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM-5 AFTER THE RAIN - PHASE IIC Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM-6 AFTER THE RAIN - PHASE IIC Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 ATR 2C Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 ATR 2C Q1 26-27.PDF15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 ATR 2C Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Q4 25-26 ATR PHASE 2C.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q4 25-26 AtR Ph 2c.PDF15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM-6 AFTER THE RAIN PHASE IIC 31-03-2026.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 PH 2C.pdf27 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5_Architect_Certificate_ Ph-2C_Q3_25-26 (1).pdf27 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 After The Rain - Phase IIc 31-12-2025.pdf27 Jan 2026
Proforma AOS UpdatedFile: Proforma Agreement for Sale ATR 2C RERA Updated.pdf29 Mar 2022
Clarification along with demarcation for proposed land areaFile: Clarifiation and Demarcation Details ATR Phase 2C.pdf19 Mar 2022
Proforma AOSFile: Proforma Agreement for Sale ATR Phase 2C.pdf19 Mar 2022
Proforma Allotment LetterFile: Proforma Allotment Letter Phase 2C.pdf19 Mar 2022
KSPCB NOCFile: KSPCB NOC.pdf19 Mar 2022
BESCOM PaymentFile: BESCOM Payment.pdf19 Mar 2022
Account Confirmation LetterFile: Bank Letter.pdf19 Mar 2022
KSPCB PaymentFile: KSPCB Payment reciept- ATR_Residential.pdf19 Mar 2022
Water NOCFile: Water NOC.pdf19 Mar 2022
Non Applicability of Fire NOCFile: Non Applicability of Fire NOC.pdf19 Mar 2022
RTC, survey 226/2-
Mutation, survey 226/2-
Encumbrance Certificate, survey 226/2-
Conversion/Alienation Order, survey 226/2-
Sale/Title/Gift Deed, survey 226/2-
Khatha, survey 226/2-
RTC, survey 227/1-
Mutation, survey 227/1-
Encumbrance Certificate, survey 227/1-
Conversion/Alienation Order, survey 227/1-
Sale/Title/Gift Deed, survey 227/1-
Khatha, survey 227/1-
RTC, survey 227/2-
Mutation, survey 227/2-
Encumbrance Certificate, survey 227/2-
Conversion/Alienation Order, survey 227/2-
Sale/Title/Gift Deed, survey 227/2-
Khatha, survey 227/2-
RTC, survey 228/1-
Mutation, survey 228/1-
Encumbrance Certificate, survey 228/1-
Conversion/Alienation Order, survey 228/1-
Sale/Title/Gift Deed, survey 228/1-
Khatha, survey 228/1-
RTC, survey 228/2-
Mutation, survey 228/2-
Encumbrance Certificate, survey 228/2-
Conversion/Alienation Order, survey 228/2-
Sale/Title/Gift Deed, survey 228/2-
Khatha, survey 228/2-
RTC, survey 239/2b-
Mutation, survey 239/2b-
Encumbrance Certificate, survey 239/2b-
Conversion/Alienation Order, survey 239/2b-
Sale/Title/Gift Deed, survey 239/2b-
Khatha, survey 239/2b-
RTC, survey 241-
Mutation, survey 241-
Encumbrance Certificate, survey 241-
Conversion/Alienation Order, survey 241-
Sale/Title/Gift Deed, survey 241-
Khatha, survey 241-
RTC, survey 353(P)-
Mutation, survey 353(P)-
Encumbrance Certificate, survey 353(P)-
Conversion/Alienation Order, survey 353(P)-
Sale/Title/Gift Deed, survey 353(P)-
Khatha, survey 353(P)-
RTC, survey 354/1A-
Mutation, survey 354/1A-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
TMFT Phase 2Survey no 32 part1 and 33 part 1 and 33 part 2 Kanakapura Road, TallaghattapuraOngoingSep 2024Not delivered

How this compares with Bengaluru Urban

100%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep AFTER THE RAIN-PHASE IIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmAFTER THE RAIN-PHASE IICOther 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: Total Environment Building Systems Private limited

Total Environment Building Systems Private limited. has 5 registrations on RERA Karnataka, including AFTER THE RAIN COMMERCIAL and Lost in the Greens. Its filings declare 3 earlier projects, none of them declared completed. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if AFTER THE RAIN-PHASE IIC is delayed beyond 1 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of AFTER THE RAIN-PHASE IIC?

The registered promoter entity is Total Environment Building Systems Private limited, a company as per the filing. Its CIN U45202KA1996PTC020790 and GSTIN 29AABCT9452F1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in AFTER THE RAIN-PHASE IIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at AFTER THE RAIN-PHASE IIC?

The professionals named in the filing: Architect: Varun Biltoria; Engineer: PRAKASH CHANNAPPAGOUDAR; Chartered Accountant: Ankush Jain. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AFTER THE RAIN-PHASE IIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AFTER THE RAIN-PHASE IIC. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AFTER THE RAIN-PHASE IIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.