ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Rural, Karnataka / Aeropolis, a project of Sattva Group

Registration approved No litigation declared Residential/Group Housing project

Aeropolis, a project of Sattva Group

By TRINAYANI REALTOR PRIVATE LIMITED

RG-KA-40810 · RERA PRM/KA/RERA/1250/303/PR/110522/004869 · Last updated on RERA Karnataka portal: 15 Jul 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jul 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 184 documents Report an error

Aeropolis, a project of Sattva Group is a Residential/Group Housing project by TRINAYANI REALTOR PRIVATE LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/110522/004869 on 11 May 2022. Possession is promised by 9 Jul 2026.

At a glance

Project

  • NameAeropolis, a project of Sattva Group
  • TypeResidential/Group Housing
  • Location
    • Devanahalli
    • Bengaluru Rural
    • 562157
  • Pincode562157
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/303/PR/110522/004869
  • ReraGenie IDRG-KA-40810

Builder

  • NameTRINAYANI REALTOR PRIVATE LIMITED
  • Entity typeCompany
  • CINU45400WB2006PTC108571
  • GSTIN29AACCT4238N1ZU
  • Authorized SignatoryP K Mishra
  • CeoMr.P.K.Mishra
  • DirectorsASHWIN SANCHETI, RAJIV PATHAK
  • Project HeadP K Mishra
  • Declared earlier projects5 →

Key dates

this monthRegisteredMay 2022PromisedJul 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 May 2022
  • Promised completion9 Jul 2026
  • Revised completionNone
  • Buildings9 building records
  • Documents filed184 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block B (Studio Units)---1760176
Block C- Wing 4---1210121
Block C- Wing 5---77077
Block C- Wing 6---99099
Block D- Wing 7---99099
Block D- Wing 8---77077
Block D- Wing 9---1320132
Block D- Wing 10---1100110
Block D- Wing 11---1100110

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasYes-
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership5

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area41,783 sq m
Named landowners5
LandownerVillageDistrict
TRINAYANI REALTOR PRIVATE LIMITED--
TRINAYANI REALTOR PRIVATE LIMITED--
TRINAYANI REALTOR PRIVATE LIMITED--
TRINAYANI REALTOR PRIVATE LIMITED--
TRINAYANI REALTOR PRIVATE LIMITED--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 245.92 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 211.42 cr-
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 17.40 cr-
On-site expenditure-Site OverheadRs 17.10 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s Kembhavi Architecture Foundation
EngineerM/s Innotech Engineering Consultant Pvt.Ltd.
Chartered AccountantDhirendra Kumar Dhal

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed184

As listed on the registration, under the names the promoter filed them with; the newest 80 of 184 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/110522/004869 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Aeropolis Q1 Form 4.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Aeropolis - Form 5 POC.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Aeropolis 1 Form 6 POC_compressed.pdf15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Aeropolis Ph - 1Form 4.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 - Aeropolis 1 - POC.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 - Aeropolis 1 - POC.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Labour and Education Department15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Aeropolis PH 1.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Aeropolis - Phase I - Form 5.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Aeropolis - Phase 1.pdf14 Jan 2026
Q3 2025-26 Water supply and sewage board14 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
Q3 2025-26 Fire and Safety14 Jan 2026
Q3 2025-26 Labour and Education Department14 Jan 2026
Q3 2025-26 Airport Authority of India14 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department14 Jan 2026
SALARPURIA-SATTVA ANUGRAHA phase 2 quarterly reportFile: ANUGRAHA phase 2-quarterly report.pdf25 Mar 2022
SALARPURIA-SATTVA SIGNET quarterly reportFile: Signet-quarterly report.pdf25 Mar 2022
SALARPURIA-SATTVA EXOTIC quarterly reportFile: Exotic-quarterly report.pdf25 Mar 2022
SALARPURIA SATTVA MISTY CHARM quarterly reportFile: Misty Charm-quarterly report.pdf25 Mar 2022
SALARPURIA-SATTVA OPUS quarterly reportFile: Opus-quarterly report.pdf25 Mar 2022
SALARPURIA-SATTVA KAVERI SIRI quarterly reportFile: Kaveri Siri-quarterly report.pdf25 Mar 2022
SALARPURIA SATTVA ASHRAYA quarterly reportFile: Ashraya-quarterly report.pdf25 Mar 2022
SALARPURIA SATTVA PARK CUBIX quarterly reportFile: Park Cubix-quarterly report.pdf25 Mar 2022
Draft Agreement for Sale as notified by GOK highlighting insertions, modifications, deletionFile: AGREEMENT FOR SALE-Aeropolis-changes highlighted.pdf25 Mar 2022
Marked guideline value certificateFile: Guidance Value-certified-Aeropolis.pdf25 Feb 2022
The certified copy obtained by the concerned Sub-registrar regarding value of the propertyFile: Guidance Value-certified-Aeropolis.pdf14 Feb 2022
Development planFile: Development plan_Aeropolis.pdf14 Feb 2022
approved drawing Sl. No. 7File: DN 7 of 27 Basement Floor Plan(E Block) Sheet 06of06.jpg14 Feb 2022
approved drawing Sl. No. 13File: DN 13 of 27 Stilt plan E Block Sheet 06of06.pdf14 Feb 2022
approved drawing Sl. No. 26File: DN 26 of 27 E Block(Hotel) Floor Plans.pdf14 Feb 2022
approved drawing Sl. No. 27File: DN 27 of 27 E - Block (Hotel) Elevation and Section plans.pdf14 Feb 2022
NOC issued by Airport Authority-UndertakingFile: Undertaking-Airport NOC.pdf14 Feb 2022
title deed or sale deed in the name of previous land owners for S.No.39/2 & 41/1File: S No 39-2 & 41-1-Sale deed.pdf29 Jan 2022
title deed or sale deed in the name of previous land owners for S.No.43 & 75/1File: S No 43& 75-1-Sale deed.pdf29 Jan 2022
title deed or sale deed in the name of previous land owners for S.No.44File: S No 44-Sale deed.pdf29 Jan 2022
RTCs for the year 2021-22File: RTC-39-2.pdf29 Jan 2022
RTCs for the year 2021-22File: RTC-41-1.pdf29 Jan 2022
RTCs for the year 2021-22File: RTC-43.pdf29 Jan 2022
RTCs for the year 2021-22File: RTC-44.pdf29 Jan 2022
RTCs for the year 2021-22File: RTC-75-1.pdf29 Jan 2022
Mutation copy in the name of land ownerFile: S No 39-2-MR 2-10-11.pdf29 Jan 2022
Mutation copy in the name of land ownerFile: S No 41-1-MR 9 - 07-08.pdf29 Jan 2022
Mutation copy in the name of land ownerFile: S No 43 & 75 Mutation 5-2004-2005.pdf29 Jan 2022
Mutation copy in the name of land ownerFile: S No 44 Mutation -7-2007-2008.pdf29 Jan 2022
guidance value of the project land- gazzette notification with marking attachedFile: guidance value-udayagiri.pdf29 Jan 2022
The approved building drawingsFile: DN 2 of 27 Basement plan Sheet 01of06.pdf29 Jan 2022
The approved building drawingsFile: DN 3 of 27 Basement D Block plan Sheet 02of06.pdf29 Jan 2022
The approved building drawingsFile: DN 4 of 27 Basement D Block plan Sheet 03of06.pdf29 Jan 2022
The approved building drawingsFile: DN 5 of 27 Basement B&C Block Plan Sheet 04of06.pdf29 Jan 2022
The approved building drawingsFile: DN 6 of 27 Basement A Block plan Sheet 05of06.pdf29 Jan 2022
The approved building drawingsFile: DN 8 of 27 Stilt plan Sheet 01of06.pdf29 Jan 2022
The approved building drawingsFile: DN 9 of 27 Stilt plan D block plan Sheet 02of06.pdf29 Jan 2022
The approved building drawingsFile: DN 10 of 27 Stilt plan D Block Sheet 03of06.pdf29 Jan 2022
The approved building drawingsFile: DN 11 of 27 Stilt plan A&B Block Sheet 04of06.pdf29 Jan 2022
The approved building drawingsFile: DN 12 of 27 Stilt plan A Block Sheet 05of06.pdf29 Jan 2022
The approved building drawingsFile: DN 14 of 27 A Block 1st Floor to 11th floor plan.pdf29 Jan 2022
The approved building drawingsFile: DN 15 of 27 C Block 1st Floor to 11th floor plan.pdf29 Jan 2022
The approved building drawingsFile: DN 16 of 27 D Block 1st Floor to 11th floor plan.pdf29 Jan 2022
The approved building drawingsFile: DN 17 of 27 A Block Terrace Floor plan.pdf29 Jan 2022
The approved building drawingsFile: DN 18 of 27 C Block Terrace Floor Plan.pdf29 Jan 2022
The approved building drawingsFile: DN 19 of 27 D Block Terrace Floor Plan.pdf29 Jan 2022
The approved building drawingsFile: DN 20 of 27 C Block Elevations and Section Plan.pdf29 Jan 2022
The approved building drawingsFile: DN 21 of 27 A Block Elevations and Section Plan.pdf29 Jan 2022
The approved building drawingsFile: DN 22 of 27 D Block Elevation and Section Plan.pdf29 Jan 2022
The approved building drawingsFile: DN 23 of 27 Club House Plan Elevations and Section plan.pdf29 Jan 2022
The approved building drawingsFile: DN 24 of 27 B- Block(Studio Units) Floor Plans.pdf29 Jan 2022
The approved building drawingsFile: DN 25 of 27 B- Block(Studio Units) Elevation and Section Plans.pdf29 Jan 2022
The single Layout plan issued by planning authorityFile: DN 1 of 27 Site Plan.pdf29 Jan 2022
Cost of Land + Estimated Cost of Construction is equals to Total Project CostFile: Letter for corrected cost.pdf29 Jan 2022
Please mention the acknowledgement number in affidavit upload the section 3(1) notarized affidavit.File: AFFIDAVIT-3(1)-Aeropolis-updated.pdf29 Jan 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Salarpuria-Sattva Laurel HeightsHesaraghatta Main Road, Off Tumkur Main Road, Near UCO Bank, Mallasandra, Jalahalli West, BengaluruCompleted-No date filed
Salarpuria-Sattva East CrestBengaluru - Tirupati Highway, Survey No. 41, Bandapura Village, Bidarahalli Hobli, Bangalore East Taluk and presently bearing Khata No. 61 issued by Doddabanahalli Village Panchayat, Virgonagar, Konadasapura, BengaluruCompleted-No date filed
Salarpuria-Sattva CelestaMunicipal No.158 (earlier Survey Nos. 49/1A, 49/1B and 49/2, Bhattarahalli Village, Bidarahalli Hobli, earlier in Hoskote Taluk and presently in Bangalore East Taluk) Bhattarahalli, K. R. Puram, Bengaluru.Completed-No date filed
Salarpuria-Sattva CadenzaHosur main road, Kudlu junction, Sy. No.48/4D & 48/4 E, Hongasandra Village, Begur Hobli, Bangalore South Taluk, BengaluruCompleted-No date filed
SALARPURIA-SATTVA DIVINITYland bearing BBMP khatha No.24/20/20/219, Mysore Main Road, Bengaluru carved out of converted undeveloped lands bearing Survey No.126, Survey No.119/1, Survey No.119/2D, Survey No.119/3D, Survey No.119/4B, Survey No.119/5B, Survey No.119/6B, Survey No. 120/1, Survey No.120/2, Survey No.120/3B, Survey No.120/4B, Survey No.120/5B, Survey No.120/6B, Survey No.123/1, Survey No. 123/2, Survey No.123/3 and Survey No.125/5, all situated at Pantharapalya Village, Kengeri Hobli, Bangalore South TalukCompleted-No date filed

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep Aeropolis, a project of Sattva Group on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmAeropolis, a project of Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: TRINAYANI REALTOR PRIVATE LIMITED

TRINAYANI REALTOR PRIVATE LIMITED has 1 registration on RERA Karnataka, including Aeropolis, a project of Sattva Group. Its filings declare 5 earlier projects, 5 of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if Aeropolis, a project of Sattva Group is delayed beyond 9 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Aeropolis, a project of Sattva Group?

The registered promoter entity is TRINAYANI REALTOR PRIVATE LIMITED, a company as per the filing. Its CIN U45400WB2006PTC108571 and GSTIN 29AACCT4238N1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Aeropolis, a project of Sattva Group?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Aeropolis, a project of Sattva Group?

The professionals named in the filing: Architect: M/s Kembhavi Architecture Foundation; Engineer: M/s Innotech Engineering Consultant Pvt.Ltd.; Chartered Accountant: Dhirendra Kumar Dhal. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aeropolis, a project of Sattva Group?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aeropolis, a project of Sattva Group. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aeropolis, a project of Sattva Group to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.