Home / Browse projects / Bengaluru Rural, Karnataka / EMBASSY VERDE
EMBASSY VERDE
By EMBASSY DEVELOPMENTS LIMITED
RG-KA-46886 · RERA PRM/KA/RERA/1250/303/PR/101224/007284 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared, 30 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
EMBASSY VERDE is a Residential/Group Housing project by EMBASSY DEVELOPMENTS LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/101224/007284 on 10 Dec 2024. Possession is promised by 31 Dec 2030. 1,043 of the 1,044 units on this registration are recorded sold or booked, and 4 of 17 construction stages are filed complete.
At a glance
Project
- NameEMBASSY VERDE
- TypeResidential/Group Housing
- Location
- Devanahalli
- Bengaluru Rural
- 562157
- Pincode562157
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1250/303/PR/101224/007284
- ReraGenie IDRG-KA-46886
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on10 Dec 2024
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings3 building records
- Documents filed406 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A1 | - | - | - | 396 | 0 | 396 |
| Tower A2 | - | - | - | 252 | 0 | 252 |
| Tower A3 | - | - | - | 396 | 0 | 396 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 0%.
Building: 24% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership23
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
| M/s NAM ESTATES PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 419.00 cr | Rs 178.45 cr |
| Administrative and Marketing Costs | Rs 23.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 17.00 cr | - |
| Taxes, Cess or levy | Rs 4.36 cr | Rs 3.12 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jayant Vaitha |
| Engineer | Arun Srikanth Nadig |
| Chartered Accountant | Ravindranath N |
Litigation declared30
| Case | Court | Status |
|---|---|---|
| O.S.1329/2006/2006 | Senior Civil Judge Devanahalli | - |
| O.S. 829/08 | Senior Civil Judge Devanahalli | - |
| O.S.137/2011/2011 | Senior Civil Judge Devanahalli | - |
| O.S. 462/13 | 2 Additional Senior Civil Judge Devanahalli | - |
| O.S.647/2014/2014 | Senior Civil Judge Devanahalli | - |
| O.S.490/2015/2015 | Senior Civil Judge Devanahalli | - |
| O.S.675/2015/2015 | Senior Civil Judge Devanahalli | - |
| O.S 664/15 | Senior Civil Judge Devanahalli | - |
| O.S. 354/15 | Additional Civil Judge & JMFC Devanahalli | - |
| O.S 305/15 | Principal Civil Judge & JMFC Devanahalli | - |
| O.S 334/15 | Senior Civil Judge Devanahalli | - |
| O.S 753/15 | Senior Civil Judge Devanahalli | - |
| O.S 296/15 | Additional Civil Judge & JMFC Devanahalli | - |
| O.S 306/15 | Additional Civil Judge & JMFC Devanahalli | - |
| O.S. 349/15 | Principal Civil Judge & JMFC Devanahalli | - |
| O.S.770/2016/2016 | Senior Civil Judge Devanahalli | - |
| O.S 152/16 | Additional Civil Judge & JMFC Devanahalli | - |
| O.S 466/16 | Senior Civil Judge Devanahalli | - |
| RSA.No.2496/2017/2017 | High court of Karnataka | - |
| RFA.No.1741/2018 (OS.No.752/2015) | The High Court of Karnataka | - |
| O.S.179/2019/2019 | Senior Civil Judge Devanahalli | - |
| O.S. 385/2019/2019 | The Principal Civil Judge & JMFC, Devanahalli | - |
| R.F.A.No.2259/2019/2019 | The High Court of Karnataka | - |
| O.S.826/2020/2020 | 1 st Additional Senior Civil Judge Devanahalli | - |
| O.S.759/2020/2020 | Senior Civil Judge Devanahalli | - |
| O.S.685/2021/2021 | 2 Additional Senior Civil Judge Devanahalli | - |
| O.S.No.1144/2022/2022 | The Principal Senior Civil Judge, Devanahalli | - |
| W.P.No.19800/2025/2025 | The Hon'ble High Court of Karnataka | - |
| O.S.No.455/2025/2025 | The Additional Civil Judge, Devanahalli | - |
| O.S.No.143/2025/2025 | III Additional Senior Civil Judge, Devanahalli | - |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed406
As listed on the registration, under the names the promoter filed them with; the newest 80 of 406 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/101224/007284 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Embassy Verde_CA Certificate_Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Embassy Verde_Architect Certificate_Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Embassy Verde_Engineer Certificate_Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Embassy Verde_CA Certificate_1st Qtly_FY 2026-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Embassy Verde_Archi Certificate_1st Qtly_FY 2026-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Embassy Verde_Engi neer Certificate_1st Qtly_FY 2026-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Emabssy Verde_CA Certificate_4th Qtly_FY 2025-26.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Emabssy Verde_Architect Certificate_4th Qtly_FY 2025-26 Mar 26.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Embassy Verde_Engineer Certificate_4th Qtly_FY 2025-26 Mar 26.pdf | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Embassy Verde_CA Certificate_FY.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Embassy Verde_Architect Certificate_3rd Qtly_FY .pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Embassy Verde_Engineer Certificate_3rd Qtly_FY .pdf | 14 Jan 2026 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 122File: 1 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 122.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 119File: 2 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 119.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 112File: 3 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 112.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 109File: 4 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 109.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 106File: 5 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 106.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 103File: 6 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 103.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 100File: 7 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 100.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 99File: 8 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 99.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 97File: 9 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 97.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 96File: 10 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 96.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 95File: 11 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 95.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 94File: 12 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 94.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-8File: 13 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-8.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-7File: 14 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-7.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-6File: 15 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-6.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-5File: 16 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-5.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-4File: 17 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-4.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-2File: 18 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-2.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 58-1File: 19 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 58-1.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 57-4File: 20 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 57-4.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 57-3File: 21 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 57-3.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 116File: 22 Encumbrance certificate from 01-04-2009 to 19-11-2024 SY No 116.pdf | 29 Nov 2024 |
| Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-3File: 23 Encumbrance certificate from 01-04-2009 to 18-11-2024 SY No 59-3.pdf | 29 Nov 2024 |
| PTCL Endorsement Sy No 90,91,92,93,94,95 of SIPLFile: 1 PTCL Endorsement Sy No 90,91,92,93,94,95 of SIPL.pdf | 29 Nov 2024 |
| PTCL Endorsement Sy No 96,97,98,99,100,101 of SIPLFile: 2 PTCL Endorsement Sy No 96,97,98,99,100,101 of SIPL.pdf | 29 Nov 2024 |
| Official Memorandum No ALN SR (De) 230 04 - 05 dt 1-4-2005File: 1 Official Memorandum No ALN SR (De) 230 04 - 05 dt 1-4-2005.pdf | 29 Nov 2024 |
| Official Memorandum No ALN SR (DeKu)107-11-12 dt 16-7-2012File: 2 Official Memorandum No ALN SR (DeKu)107-11-12 dt 16-7-2012.pdf | 29 Nov 2024 |
| OM No ALN SR (De) 151 04 05 dt 3-2-2005File: 3 OM No ALN SR (De) 151 04 05 dt 3-2-2005.pdf | 29 Nov 2024 |
| Revision settlement Akarband SY No 99File: 1 Revision settlement Akarband SY No 99.pdf | 29 Nov 2024 |
| Extract of Entry MR No 75-2004-2005 Sy No 99File: 2 Extract of Entry MR No 75-2004-2005 Sy No 99.pdf | 29 Nov 2024 |
| Extract of Entry MR 6-1997-98 Sy No 99File: 3 Extract of Entry MR 6-1997-98 Sy No 99.pdf | 29 Nov 2024 |
| Extract of Entry MR 6-2010-2011 Sy No 99File: 4 Extract of Entry MR 6-2010-2011 Sy No 99.pdf | 29 Nov 2024 |
| Extract of Entry MR No 98-2004-2005 Sy No 99File: 5 Extract of Entry MR No 98-2004-2005 Sy No 99.pdf | 29 Nov 2024 |
| Panchayat MR No 106 of 2005-06 Sy No 99File: 6 Panchayat MR No 106 of 2005-06 Sy No 99.pdf | 29 Nov 2024 |
| Survey Sketch of Nagamangala & Hegganahalli Issued By ADLRFile: 7 Survey Sketch of Nagamangala & Hegganahalli Issued By ADLR.pdf | 29 Nov 2024 |
| Podi Register of Sy No 51 NAgamangala VillageFile: 8 Podi Register of Sy No 51 NAgamangala Village.pdf | 29 Nov 2024 |
| Akarband SY No 73 to 143 Of Nagamangala VillageFile: 1 Akarband SY No 73 to 143 Of Nagamangala Village.pdf | 29 Nov 2024 |
| Revision Settlement Akarband Sy No 97File: 2 Revision Settlement Akarband Sy No 97.pdf | 29 Nov 2024 |
| Sketch of 50 & 51File: 3 Sketch of 50 & 51.pdf | 29 Nov 2024 |
| Tippany 50 & 51File: 4 Tippany 50 & 51.pdf | 29 Nov 2024 |
| Tippany Sy No 97File: 5 Tippany Sy No 97.pdf | 29 Nov 2024 |
| Akarbandh Sy No 100File: 1 Akarbandh Sy No 100.pdf | 29 Nov 2024 |
| Extract of Phodi Entry Sy No 100File: 2 Extract of Phodi Entry Sy No 100.pdf | 29 Nov 2024 |
| Revision Settlement Akarbandh for Sy No 51File: 3 Revision Settlement Akarbandh for Sy No 51.pdf | 29 Nov 2024 |
| Tippany for Sy no 51File: 4 Tippany for Sy no 51.pdf | 29 Nov 2024 |
| Tippany Sy No 100File: 5 Tippany Sy No 100.pdf | 29 Nov 2024 |
| Revision Settlement Akarband SY No 73 to 143File: 1 Revision Settlement Akarband SY No 73 to 143.pdf | 29 Nov 2024 |
| Tippany Sy No 96File: 3 Tippany Sy No 96.pdf | 29 Nov 2024 |
| Hissa Tippany for Sy no 51File: 1 Hissa Tippany for Sy no 51.pdf | 29 Nov 2024 |
| Hissa Tippany Sy No 95File: 2 Hissa Tippany Sy No 95.pdf | 29 Nov 2024 |
| Revision Settlement Akarband Sy No 95File: 3 Revision Settlement Akarband Sy No 95.pdf | 29 Nov 2024 |
| Revision settlement Akarband Sy No 94File: 2 Revision settlement Akarband Sy No 94.pdf | 29 Nov 2024 |
| Tippany Sy No 94File: 3 Tippany Sy No 94.pdf | 29 Nov 2024 |
| Embassy Verde_Merger Order_Swire to NAMFile: Embassy Verde_Merger Order_Swire to NAM.pdf | 29 Nov 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| BY THE LAKE | Sy. No. 44/1 (P),44/2 (P), 44/3 (P), 45/2 (P), 57/3 (P), 57/4 (P), 58/1 (P), 58/2 (P) & 58/3 (P) OF HEGGANAHALLI VILLAGE , KUNDANA HOBLI , DEVANAHALLI TALUK , DEVANAHALLI , Bengaluru Rural | Ongoing | Dec 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Rural
Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.
Keep EMBASSY VERDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Rural650+ in Bengaluru Rural
Filed coordinates, straight-line distance. 14 registered projects within 2 km.
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
Aeropolis, a project of Sattva Group
TRINAYANI REALTOR PRIVATE LIMITED
DS MAX SKY SHLOKAM
DS Max Properties Private Limited
EMBASSY SOUTH RESERVE
SUMMIT DEVELOPMENTS LIMITED
Bhartiya Garden Estate Phase-1
Bhartiya Urban Pvt Ltd
Bhartiya Garden Estate Phase-2
Bhartiya Urban Pvt Ltd
See every Bengaluru Rural project, with the district possession charts
Builder: EMBASSY DEVELOPMENTS LIMITED
EMBASSY DEVELOPMENTS LIMITED has 5 registrations on RERA Karnataka, including EMBASSY VERDE and Embassy Springs - Phase 2A, Apartments. Its filings declare 4 earlier projects, none of them declared completed. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Bengaluru Rural district page.
Frequently asked questions
What are my rights if EMBASSY VERDE is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of EMBASSY VERDE?
The registered promoter entity is EMBASSY DEVELOPMENTS LIMITED, a company as per the filing. Its GSTIN 29AAACN6881H1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in EMBASSY VERDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at EMBASSY VERDE?
The professionals named in the filing: Architect: Jayant Vaitha; Engineer: Arun Srikanth Nadig; Chartered Accountant: Ravindranath N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EMBASSY VERDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback