ReraGenieLog inGet a buyer report

Home / Browse projects / Amravati, Maharashtra / AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13

Completed No litigation declared Residential / Group Housing project

AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13

By PMAY AMRAVATI MUNICIPAL CORPORATION

RG-MH-69664 · RERA P50300031430 · Last updated on MahaRERA portal: 3 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Mar 2022Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 17 documents Report an error

AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13 is a Residential / Group Housing project by PMAY AMRAVATI MUNICIPAL CORPORATION in Amravati, Maharashtra, registered with MahaRERA as P50300031430 on 23 Oct 2021. The registration is recorded completed; possession was promised by 31 Mar 2022.

At a glance

Project

  • NameAFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13
  • TypeResidential / Group Housing
  • Location
    • AMBADEVI RAJKAMAL ROAD
    • RAJKAMAL CHOWK
    • Amravati (M Corp.)
    • Amravati
    • 444601
  • Pincode444601
  • RERA no.P50300031430
  • ReraGenie IDRG-MH-69664

Builder

  • NamePMAY AMRAVATI MUNICIPAL CORPORATION
  • Entity typePublic Authority
  • Other registrations7 more →
  • Completed1 of 8
  • No longer live7 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2021PromisedMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Oct 2021
  • Promised completion31 Mar 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed17 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA110000
WING BNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19
BuildingClosed/CoveredTotal
WING A77
WING B1212

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,310 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PMAY AMRAVATI MUNICIPAL CORPORATIONAmravati (M Corp.)Amravati

Approvals and building plan

Permissible FSI2066.33
Proposed, not sanctioned2,066 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR, TANK PLAZA, AMBADEVI ROAD, RAJKAMAL CHOWK, AMRAVATI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEEP MIHIR DEY
EngineerDEEP MIHIR DEY
Chartered AccountantS S SHRIMALI & ASSOCIATES
PartnerRole in project
PMAY AMRAVATI MUNICIPAL CORPORATION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Oct 2023

Documents filed17

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf3 Oct 2023
Copy of the legal title reportFile: badnera 10 3.pdf15 Oct 2021
Declaration about Commencement CertificateFile: Badnera - 10-3.pdf15 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BADNERA 10 3 ARCHITECT.pdf15 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BADNERA 10 3 ENGINEER_compressed.pdf15 Oct 2021
Layout approvalFile: LAYOUT MAP.pdf10 Oct 2021
Building plan approvalFile: SANCTIONED MAP_compressed.pdf10 Oct 2021
Copy of Layout Approval (in case of layout)File: LAYOUT MAP.pdf10 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED MAP_compressed.pdf10 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION AND COMMENCMENT CERTIFICATE_compressed.pdf10 Oct 2021
PAN CardFile: PAN CARD OF AMC_compressed.pdf20 Aug 2021
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf20 Aug 2021
Declaration in FORM BFile: FORM B_compressed.pdf20 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE CERTIFICATE_compressed.pdf20 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf20 Aug 2021
Proforma of Allotment letterFile: AGREEMENT TO SALE PDF.pdf20 Aug 2021
OtherFile: AADHAR CARD OF SURESH PATIL_compressed.pdf20 Aug 2021

How this compares with Amravati

8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is completed

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep AFFORDABLE HOUSING PROJECT MOUJA BADNERA S N on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAJKAMAL CHOWK450+ in Amravati

Builder: PMAY AMRAVATI MUNICIPAL CORPORATION

PMAY AMRAVATI MUNICIPAL CORPORATION has 8 registrations on MahaRERA, including AFFORDABLE HOUSING PROJECT MOUJA NAVSARI S NO 129/2A PLOT NO 91 TO 97 and AFFORDABLE HOUSING PROJECT MOUJA NAVSARI S NO 129/2A PLOT NO 107 TO 113. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13 is delayed beyond 31 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13?

The registered promoter entity is PMAY AMRAVATI MUNICIPAL CORPORATION, a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13?

The professionals named in the filing: Architect: DEEP MIHIR DEY; Engineer: DEEP MIHIR DEY; Chartered Accountant: S S SHRIMALI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AFFORDABLE HOUSING PROJECT MOUJA BADNERA S N to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.