AERO VISTA

By MAHABHARAT CONSTRUCTION CORPORATION

RG-MH-91470 · RERA P53000055570 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Feb 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Plinth, 95%
7 of 23Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

AERO VISTA is a Residential / Group Housing project by MAHABHARAT CONSTRUCTION CORPORATION in Kolhapur, Maharashtra, registered with MahaRERA as P53000055570 on 2 Apr 2024. Possession is promised by 20 Feb 2028. 16 of the 23 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameAERO VISTA
  • TypeResidential / Group Housing
  • Location
    • Near St. Xaviers School
    • Nagala Park
    • E Ward
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • RERA no.P53000055570
  • ReraGenie IDRG-MH-91470

Builder

  • NameMAHABHARAT CONSTRUCTION CORPORATION
  • Entity typePartnership
  • PartnersJAYESH DINESH KADAM, BAHUBALI VRUSHABH KALSHETTI
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2024PromisedFeb 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion20 Feb 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

70%16 of 23 units booked
63.5%Work done, per cost certificate

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aero VistaNA8623023

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 95%.

Aero Vista: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth95%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area966 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI3543.34
Proposed, not sanctioned3,543 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1411, C -MAYA CHEMBER, LAXMIPURI MAIN BRANCH, KOLHAPUR-416002
Estimated costRs 9.90 cr
Cost incurredRs 6.29 cr
Work done63.55%
BuildingWingEstimatedIncurred
Aero VistaNARs 8.98 crRs 5.83 cr
-NARs 91.90 lakhRs 46.26 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAvinash J Naik
EngineerNupur J Kadam
Chartered AccountantSHANKAR VITTHAL PATIL
Chartered AccountantAmit Madanrao Shinde
PartnerRole in project
MAHABHARAT CONSTRUCTION CORPORATION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 20 Feb 2028

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form_1_aero vista_architect certificate.pdf5 May 2026
Withdrawal Update Form 2File: Form_2_aero vista_engineer certificate.pdf5 May 2026
Withdrawal Update Form 3File: Form_3_Aero_Vista_31032026.pdf5 May 2026
Withdrawal Update Form 1File: Form_1_aero vista_architech certificate.pdf18 Feb 2026
Withdrawal Update Form 2File: Form_2_Engineers-Certificate_Aero Vista.pdf18 Feb 2026
Withdrawal Update Form 3File: Form_3_Aero_Vista_31122025.pdf18 Feb 2026
Withdrawal Update Form 1File: Form_1_Architect_Certificate_Aero_Vista.pdf27 Nov 2025
Withdrawal Update Form 2File: Form_2 Engineers_ Certificate_ Aero_ Vista.pdf27 Nov 2025
Withdrawal Update Form 3File: Form_3_Aero_Vista_30092025.pdf27 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Annexure A with Qualification Signed.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 Mahabharat Aero Vista.pdf14 Nov 2025
Withdrawal Update Form 2File: FOrm 2 Mahabharat Aero Vista.pdf14 Nov 2025
Withdrawal Update Form 3File: Form 3 Mahabharat Aero Vista.pdf14 Nov 2025
Withdrawal Update Form 1File: Form 1 Mahabharat Aero Vista.pdf12 Aug 2025
Withdrawal Update Form 2File: FOrm 2 Mahabharat Aero Vista.pdf12 Aug 2025
Withdrawal Update Form 3File: Form 3 Mahabharat Aero Vista.pdf12 Aug 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Certificate 31032025.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_Architect_Certificate_Aero_Vista.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Aero_Vista_31032025.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Engineer_Certificate_Aero_Vista.pdf25 Apr 2025
Building plan approvalFile: Revised Plan sanction.pdf26 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised Building permission.pdf26 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan sanction.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_architects _certificate _aero vista.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Aero_Vista_31122024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Engineers Certificate_ 31122024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Engineers_Certificate_31122024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_Architect_Certificate_Aero_Vista_30092024.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Sven_Skies_30092024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Engineer_Certificate_Aero_Vista.pdf26 Oct 2024
Building plan approvalFile: Revised Plan sanction.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan sanction.pdf3 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised Building permission.pdf3 Aug 2024
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Engineers_Certificate_30062024.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Aero_Vista_30062024.pdf23 Jul 2024
Building plan approvalFile: PLAN 1.pdf21 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Aero_Vista REVISED.pdf21 Mar 2024
Other - TechnicalFile: cc details.pdf5 Mar 2024
Copy of the legal title reportFile: Legal Title Report.pdf23 Feb 2024
Copy of the legal title reportFile: sale deed-1-10_compressed.pdf23 Feb 2024
Copy of the legal title reportFile: sale deed-11-20_compressed.pdf23 Feb 2024
Copy of the legal title reportFile: sale deed-21-30_compressed.pdf23 Feb 2024
Copy of the legal title reportFile: sale deed-31-40_compressed.pdf23 Feb 2024
Copy of the legal title reportFile: sale deed-41-52_compressed.pdf23 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200297810641_For_Asset_Based_Search_22_02_2024_16_09_41_341.pdf23 Feb 2024
Layout approvalFile: PLAN 1.pdf22 Feb 2024
Layout approvalFile: PLAN 2.pdf22 Feb 2024
Layout approvalFile: PLAN 3.pdf22 Feb 2024
Building plan approvalFile: PLAN 1.pdf22 Feb 2024
Building plan approvalFile: PLAN 2.pdf22 Feb 2024
PAN CardFile: pan card_compressed.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrances.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: legal encumbrances.pdf22 Feb 2024
Details of encumbrances concerned to LegalFile: Financial Encumbrances.pdf22 Feb 2024
Details of encumbrances concerned to LegalFile: legal encumbrances.pdf22 Feb 2024
Copy of Layout Approval (in case of layout)File: PLAN 1.pdf22 Feb 2024
Copy of Layout Approval (in case of layout)File: PLAN 2.pdf22 Feb 2024
Copy of Layout Approval (in case of layout)File: PLAN 3.pdf22 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf22 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf22 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commence Certificate.pdf22 Feb 2024
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf22 Feb 2024
Declaration in FORM BFile: Form B.pdf22 Feb 2024
CERSAI detailsFile: CERSAIdeclaration regarding no security.pdf22 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discl Int in other Real Estate Jayesh.pdf22 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Balasaheb.pdf22 Feb 2024
Proforma of Agreement for saleFile: model copy agreement to sell.pdf22 Feb 2024
Proforma of Allotment letterFile: Allotment letter model copy.pdf22 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank Accounts.pdf22 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation report of allotment letter.pdf22 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report for agreement to sell.pdf22 Feb 2024
Other - TechnicalFile: Annexure A declaration cum undertaking.pdf22 Feb 2024
Other - TechnicalFile: Declaration of Authorised Signatory.pdf22 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationStatusPromisedDelivered
MATHURA NAGARIR S NO 1035 4 A WARD KASABA KARVIR APATE NAGAR KOLHAPURCompletedDec 2019Late, Mar 2020

How this compares with Kolhapur

70%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep AERO VISTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagala Park, E Ward880+ in Kolhapur

Builder: MAHABHARAT CONSTRUCTION CORPORATION

MAHABHARAT CONSTRUCTION CORPORATION has 4 registrations on MahaRERA, including MAHABHARAT CONSTRUCTION CORPORATION and Megh Mahabharat. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if AERO VISTA is delayed beyond 20 Feb 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AERO VISTA?

The registered promoter entity is MAHABHARAT CONSTRUCTION CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AERO VISTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AERO VISTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AERO VISTA?

The professionals named in the filing: Architect: Avinash J Naik; Engineer: Nupur J Kadam; Chartered Accountant: SHANKAR VITTHAL PATIL; Chartered Accountant: Amit Madanrao Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AERO VISTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AERO VISTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AERO VISTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.