Home / Browse projects / Sindhudurg, Maharashtra / ADITYASAGAR COMPLEX PHASE II

Registered No litigation declared Residential / Group Housing project

ADITYASAGAR COMPLEX PHASE II

By Siddhesh Mahadeo Kanade

RG-MH-30200 · RERA P52900029896 · Last updated on MahaRERA portal: 18 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
8 of 11Construction stages donefurthest along: Installation of Lifts, 50%
9 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

ADITYASAGAR COMPLEX PHASE II is a Residential / Group Housing project by Siddhesh Mahadeo Kanade in Sindhudurg, Maharashtra, registered with MahaRERA as P52900029896 on 12 Jul 2021. Possession is promised by 30 Dec 2026. The completion date has moved by 36 months from the original filing. 9 of the 18 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameADITYASAGAR COMPLEX PHASE II
  • TypeResidential / Group Housing
  • Location
    • Sambhaji Chowk
    • Vabhave
    • Vaibhavvadi
    • Sindhudurg
    • 416810
  • Pincode416810
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900029896
  • ReraGenie IDRG-MH-30200

Builder

  • NameSiddhesh Mahadeo Kanade
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJul 2021First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Jul 2021
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed120 files

Current status

50%9 of 18 units booked
86.1%Work done, per cost certificate

Figures as on 18 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADITYASAGAR COMPLEX PHASE IINA2218018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 50%.

ADITYASAGAR COMPLEX PHASE II: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntYes95%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,973 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Oct 2025
LandownerVillageDistrict
Mr Shantanu Ramakant NarkarThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityVabhave Vaibhavwadi Nagarpanchayat
Permissible FSI1290.62
Proposed, not sanctioned1,291 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVaibhavwadi District-Sindhudurg
Estimated costRs 2.52 cr
Cost incurredRs 2.17 cr
Work done86.11%
BuildingWingEstimatedIncurred
ADITYASAGAR COMPLEX PHASE IINARs 2.22 crRs 2.17 cr
-NARs 30.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSunil Digambar Kulkarni
EngineerSudhakar Balkrishna Khot
Chartered AccountantDamodar B Khanolkar & Co
PartnerRole in project
Siddhesh Mahadeo Kanade-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900018655Dec 2023 → Dec 2024

Reason as filed by the promoterI have registered my Real Estate Project under MahaRERA on 12/07/2021. Due to heavy rainfall in Kokan area and market condition and slow response from the buyers I have started development work of the Project in the year 2022. That I have completed 45% project work and the Project RCC 80% completed and other work of the project is in progress. Hence I haven’t been able to complete the project in the scheduled time i.e. on 31/12/2023. I request MahaRERA authority please grant me extension up to 30th December 2024 for the completion of the project

EXT52900025872Dec 2023 → Dec 2025

Reason as filed by the promoterThe project work means the slab is completed and the electrical fittings and internal external work is going on. Due to heavy rains in Konkan, the work of the project stops for 3 months in a year. I am unable to complete the project on time. Therefore, I request the MahaRERA authority to kindly approve the extension of my project at the earliest.

EA21032620317Dec 2023 → Dec 2026

Reason as filed by the promoterThe project work is in progress. The work related to the lift, sanitary fittings, doors and windows, staircase, lobby, electrical meter room, and substation is expected to be completed by the end of May 2026. Thereafter, we will apply for the Completion Certificate. Upon receipt of the Completion Certificate, the same will be updated in the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 01 (4).pdf18 Aug 2026
Withdrawal Update Form 1File: FORM 01 (MARCH 2026).pdf18 Aug 2026
Withdrawal Update Form 1File: FORM 01 (4).pdf18 Aug 2026
Withdrawal Update Form 2File: FORM 02 (1).pdf18 Aug 2026
Withdrawal Update Form 2File: FORM 02 (1).pdf18 Aug 2026
Withdrawal Update Form 2File: FORM 02 (1).pdf18 Aug 2026
Withdrawal Update Form 3File: FORM 03 (4)_compressed.pdf18 Aug 2026
Withdrawal Update Form 3File: FORM 03 (MARCH 2026.pdf18 Aug 2026
Withdrawal Update Form 3File: FORM 03 (4)_compressed.pdf18 Aug 2026
Withdrawal Update Form 1File: FORM 01 (MARCH 2026).pdf5 May 2026
Withdrawal Update Form 2File: FORM 2 (MARCH 2026).pdf5 May 2026
Withdrawal Update Form 3File: FORM 03 (MARCH 2026.pdf5 May 2026
Form 2A (FY 2025-2026)File: FORM 2 A (MARCH 2026).pdf5 May 2026
Form 2A (FY 2024-2025)File: FORM 2 A - 2024-2025.pdf6 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 -2024-2025.pdf6 Apr 2026
Withdrawal Update Form 1File: FORM 1 (18).pdf21 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf21 Mar 2026
Withdrawal Update Form 3File: FORM 3 (13).pdf21 Mar 2026
Withdrawal Update Form 1File: FORM 1 (18).pdf13 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf13 Mar 2026
Withdrawal Update Form 3File: FORM 3 (13).pdf13 Mar 2026
Withdrawal Update Form 1File: form 01 (2).pdf9 Feb 2026
Withdrawal Update Form 1File: form 1.pdf9 Feb 2026
Withdrawal Update Form 2File: FORM 2 (31).pdf9 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf9 Feb 2026
Withdrawal Update Form 3File: form 3 june 2025.pdf9 Feb 2026
Withdrawal Update Form 3File: form 03_compressed.pdf9 Feb 2026
Form 1File: FORM 01 (1).pdf7 Oct 2025
Form 2File: FORM 2 (27).pdf7 Oct 2025
Form 3File: FORM 03 (1).pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold (6).pdf7 Oct 2025
OthersFile: FORM 2A (17).pdf7 Oct 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf17 Apr 2025
Declaration in FORM BFile: Form B new.pdf2 Apr 2025
Declaration in FORM BFile: Form B Declaration_compressed (2).pdf13 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold final.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2024 (1).pdf10 Feb 2025
Declaration in FORM BFile: Form B Declaration_compressed (1).pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form - 5.pdf6 Feb 2025
Declaration in FORM BFile: Form B Declaration_compressed.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (3).pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -01.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Jan 2024
Declaration in FORM BFile: Form - B.pdf2 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2021.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP 2022.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 2023.pdf21 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A MARCH 2023 (1).pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect June 2022.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Dec 2022.PDF20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 JUNE 2023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Sept 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 June 2022.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Dec 2022.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 March 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Sept 2023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold inventory June 2022.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold inventory DEC 2022.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold MARCH 2023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold JUNE 2023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold JUNE 2023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold inventory sept 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2023.pdf20 Oct 2023

How this compares with Sindhudurg

50%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 36 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep ADITYASAGAR COMPLEX PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sambhaji Chowk530+ in Sindhudurg

2 kmADITYASAGAR COMPLEX PHASCompleted 2Lapsed / revoked 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: Siddhesh Mahadeo Kanade

Siddhesh Mahadeo Kanade has 2 registrations on MahaRERA, including Adityasagar Complex and ADITYASAGAR COMPLEX PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if ADITYASAGAR COMPLEX PHASE II is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADITYASAGAR COMPLEX PHASE II?

The registered promoter entity is Siddhesh Mahadeo Kanade, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADITYASAGAR COMPLEX PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADITYASAGAR COMPLEX PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ADITYASAGAR COMPLEX PHASE II?

The professionals named in the filing: Architect: Sunil Digambar Kulkarni; Engineer: Sudhakar Balkrishna Khot; Chartered Accountant: Damodar B Khanolkar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADITYASAGAR COMPLEX PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADITYASAGAR COMPLEX PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADITYASAGAR COMPLEX PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.