ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / ADITHRI SUMANGAL

Registration approved No litigation declared Residential/Group Housing project

ADITHRI SUMANGAL

By ADITHRI INFRA

RG-KA-32068 · RERA PRM/KA/RERA/1257/334/PR/240326/008548 · Last updated on RERA Karnataka portal: 13 Jul 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
16 of 16Construction stages doneevery applicable stage filed complete
10 of 10Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 76 documents Report an error

ADITHRI SUMANGAL is a Residential/Group Housing project by ADITHRI INFRA in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/240326/008548 on 24 Mar 2026. Possession is promised by 31 Dec 2028. 0 of the 10 units on this registration are recorded sold or booked, and 16 of 16 construction stages are filed complete.

At a glance

Project

  • NameADITHRI SUMANGAL
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/240326/008548
  • ReraGenie IDRG-KA-32068

Builder

  • NameADITHRI INFRA
  • Entity typePartnership Firm
  • GSTIN29ACFFA5886M2ZL
  • Authorized SignatoryKISHORE KUMAR SHETTY

Key dates

this monthRegisteredMar 2026PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on24 Mar 2026
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

0%0 of 10 units booked
100.1%Of the estimated cost spent so far

Figures as on 13 Jul 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADITHRI SUMANGAL---10010

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 16 construction stages are filed complete.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Painting100%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work100%
Internal and External work including landscapes as per sanctioned drawings100%

Progress on shared amenities40

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes100%
Emergency Evacuation servicesYes100%
Internal Roads & FootpathsYes100%
Electricity supply transformer and substationYes100%
Storm water drainsYes100%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes100%
Parks & Tree plantingNoNot applicable
Street LightingYes100%
ElectricityYes100%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes100%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes100%
Piped GasNoNot applicable
Water and SanitationYes100%
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes100%
BasementNoNot applicable
TerraceYes100%
Outer WallYes100%
Open parking areasYes100%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes100%
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
K. SUNIL KUMAR--
K. SUNIL KUMAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.79 cr
Cost incurredRs 1.80 cr
Spent of the estimate100.06%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.75 crRs 1.76 cr
On-site expenditure-Consultants FeesRs 4.00 lakhRs 4.00 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCOLIN PINTO
EngineerMARUTI NAYAK
Chartered AccountantMAHESH KUMAR K

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed76

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/240326/008548 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Adithri Infra.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architect certificate.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: engineer certificate.pdf13 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: form 4 CA.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: architect certificate.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: engineer certificate.pdf14 Apr 2026
RTC, survey 25/3P2-
Mutation, survey 25/3P2-
Encumbrance Certificate, survey 25/3P2-
Conversion/Alienation Order, survey 25/3P2-
JDA, survey 25/3P2-
Khatha, survey 25/3P2-
RTC, survey 25/3-
Mutation, survey 25/3-
Encumbrance Certificate, survey 25/3-
Conversion/Alienation Order, survey 25/3-
JDA, survey 25/3-
Khatha, survey 25/3-
Registration CertificateFile: firm registration.pdf-
GST CertificateFile: GST.pdf-
Partnership DeedFile: Partnership deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: form 1 CA.pdf-
Certificate issued by Architect Form 2File: form 2 architect.pdf-
Certificate issued by Engineer Form 3File: form 3 engineer.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Balance Sheet 2024 - 2025File: BS AY 2025-26.pdf-
Balance Sheet 2023 - 2024File: BS AY 2024-25.pdf-
Audited Profit and Loss Statement 2024 - 2025File: PL AY 2025-26.pdf-
Audited Profit and Loss Statement 2023 - 2024File: PL AY 2024-25.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: ITR AY 2025-26.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR AY 2024-25.pdf-
building licence-
approved plan-
single layout-
Stability certificate with lbs and mtech certiifcate-
Specification-
Brochure-
Proforma AOS-
Proforma allottment letter-
form b-
affidavit 3(1)-
Jda affidavit-
search report-
MESCOM noc-
water noc-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Estimation-
STP Drawing-
village map-boloor-
village map-Site highlighted-
MASTER PLAN-
Sale deed-
title deed -death certificate-
Title deed-last will-
form 5 architect-
form 6 engineer-
Location map-
carpet area statement-
land cost sheet with guidance value-
declaration on borewell-
affidavit for sold unsold unit-

How this compares with Dakshina Kannada

0%of this project is bookeddistrict median 38%
30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep ADITHRI SUMANGAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: ADITHRI INFRA

ADITHRI INFRA has 1 registration on RERA Karnataka, including ADITHRI SUMANGAL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if ADITHRI SUMANGAL is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ADITHRI SUMANGAL?

The registered promoter entity is ADITHRI INFRA, a partnership firm as per the filing. Its GSTIN 29ACFFA5886M2ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ADITHRI SUMANGAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ADITHRI SUMANGAL?

The professionals named in the filing: Architect: COLIN PINTO; Engineer: MARUTI NAYAK; Chartered Accountant: MAHESH KUMAR K. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADITHRI SUMANGAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADITHRI SUMANGAL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADITHRI SUMANGAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.