ADIDHAN PLATINUM

By DYUTI REALTY

RG-KA-23256 · RERA PRM/KA/RERA/1257/334/PR/230626/008743 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2031Possession promisedno revision filed
3 of 16Construction stages donefurthest along: RCC or MS Framed structure, 90%
85 of 85Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 94 documents Report an error

ADIDHAN PLATINUM is a Mixed Development project by DYUTI REALTY in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/230626/008743 on 23 Jun 2026. Possession is promised by 31 Dec 2031. 0 of the 85 units on this registration are recorded sold or booked, and 3 of 16 construction stages are filed complete.

At a glance

Project

  • NameADIDHAN PLATINUM
  • TypeMixed Development
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/230626/008743
  • ReraGenie IDRG-KA-23256

Builder

  • NameDYUTI REALTY
  • Entity typeProprietorship
  • GSTIN29ALSPR9779G2ZS
  • Authorized SignatoryDHANANJAYA RAI

Key dates

this monthRegisteredJun 2026PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Jun 2026
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

0%0 of 85 units booked
60.5%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADIDHAN PLATINUM-----85

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 16 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 90%.

Building: 40% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)50%
Retaining wall (All types)75%
RCC or MS Framed structure90%
Masonry Construction55%
Plastering inside , outside & Ceiling45%
Joinery: Doors, Windows, Ventilators etc10%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing15%
Painting0%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingNoNot applicable
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes50%
LiftsYes5%
Corridor/LobbiesYes15%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes65%
TerraceYes20%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners4
LandownerVillageDistrict
DHANANJAYA RAI--
NAZEER AHMED SHEIKH & IMTIYAZ AHMED SHEIKH--
SAJIDA KHAN & OTHERS--
ABDUL WAHAB & OTHERS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 16.00 cr
Cost incurredRs 9.68 cr
Spent of the estimate60.48%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 16.00 crRs 9.68 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHALINI SURESH
EngineerGANESH ACHARYA
Chartered AccountantASHOKA RAO

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed94

As listed on the registration, under the names the promoter filed them with; the newest 80 of 94 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/230626/008743 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: form 4.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Engineer certificate.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer certificate.pdf15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: adhidhan platinumCA.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: ARCHITECT CERTIFICATE.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: engineer certificate.pdf13 Jul 2026
EC UPTO DATEFile: EC 2007-2026.pdf15 May 2026
RTC, survey 31/8P & 31/13P-
Mutation, survey 31/8P & 31/13P-
Encumbrance Certificate, survey 31/8P & 31/13P-
Conversion/Alienation Order, survey 31/8P & 31/13P-
JDA, survey 31/8P & 31/13P-
Khatha, survey 31/8P & 31/13P-
RTC, survey 31/8P & 31/12B(P)-
Mutation, survey 31/8P & 31/12B(P)-
Encumbrance Certificate, survey 31/8P & 31/12B(P)-
Conversion/Alienation Order, survey 31/8P & 31/12B(P)-
JDA, survey 31/8P & 31/12B(P)-
Khatha, survey 31/8P & 31/12B(P)-
RTC, survey 31/8P & 31/13P-
Mutation, survey 31/8P & 31/13P-
Encumbrance Certificate, survey 31/8P & 31/13P-
Conversion/Alienation Order, survey 31/8P & 31/13P-
JDA, survey 31/8P & 31/13P-
Khatha, survey 31/8P & 31/13P-
RTC, survey 31/8P & 31/13P-
Mutation, survey 31/8P & 31/13P-
Encumbrance Certificate, survey 31/8P & 31/13P-
Conversion/Alienation Order, survey 31/8P & 31/13P-
JDA, survey 31/8P & 31/13P-
Khatha, survey 31/8P & 31/13P-
GST CertificateFile: GST.pdf-
Certificate issued by CA Form 1File: Form 1 CA.pdf-
Certificate issued by Architect Form 2File: form 2.pdf-
Certificate issued by Engineer Form 3File: Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Balance Sheet 2024 - 2025File: BS AY 2025-26.pdf-
Balance Sheet 2023 - 2024File: BS AY 2024-25.pdf-
Balance Sheet 2022 - 2023File: BS AY 2023-24.pdf-
Audited Profit and Loss Statement 2024 - 2025File: PL AY 2025-26.pdf-
Audited Profit and Loss Statement 2023 - 2024File: PL AY 2024-25.pdf-
Audited Profit and Loss Statement 2022 - 2023File: PL AY 2023-24.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: ITR AY 2025-26.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR AY 2024-25.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR AY 2023-24.pdf-
Building Licence-
approved plan-
single layout-
stability certificate licnece and declaration-
specification-
relinguishment deed 1& 2-
proforma AOS-
proforma allottment letter-
Form b-
affidavit 3(1)-
Jda affidavit-
search report-
mescom platinum-
Water NOC -adidhan-
KSPCB-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Village map-
Location map-
FAR-
mescom fee receipt-
Title deed-item no 1-
title deed-itme no 2-
title deed-item no 3 (i and ii)-

How this compares with Dakshina Kannada

0%of this project is bookeddistrict median 38%
30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep ADIDHAN PLATINUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: DYUTI REALTY

DYUTI REALTY has 1 registration on RERA Karnataka, including ADIDHAN PLATINUM. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if ADIDHAN PLATINUM is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ADIDHAN PLATINUM?

The registered promoter entity is DYUTI REALTY, a proprietorship as per the filing. Its GSTIN 29ALSPR9779G2ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ADIDHAN PLATINUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ADIDHAN PLATINUM?

The professionals named in the filing: Architect: SHALINI SURESH; Engineer: GANESH ACHARYA; Chartered Accountant: ASHOKA RAO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADIDHAN PLATINUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADIDHAN PLATINUM. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADIDHAN PLATINUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.