Home / Browse projects / Aden Court

Registration lapsed No litigation declared Residential / Group Housing project

Aden Court

By Gupta Housing Pvt Ltd

RG-MH-10302 · RERA P51900005034 · Last updated on MahaRERA portal: 16 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2023Possession promised34 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Aden Court is a Residential / Group Housing project by Gupta Housing Pvt Ltd in Mumbai, 400019, registered with MahaRERA as P51900005034 on 9 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 2 complaints are on record with the regulator.

At a glance

Project

  • NameAden Court
  • TypeResidential / Group Housing
  • Location
    • Mumbai
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900005034
  • ReraGenie IDRG-MH-10302

Builder

  • NameGupta Housing Pvt Ltd
  • Entity typeCompany
  • Managing DirectorsAshwin Gupta, Sudhir Gupta

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aden CourtNA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Aden Court: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 16 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Swimming PoolYes100%
GymnasiumYes100%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Emgee Homes Private Limited-Mumbai City

Approvals and building plan

Permissible FSI3298.5
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch210, B Wing, Mittal Tower, Opposite Vidhan Sabha, Nariman Point, Mumbai, Maharashtra 400021

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Gupta Housing Pvt Ltd-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000001375Mudhit Madanlal GuptaGupta Housing Pvt. Ltd.20/10/2017
CC006000000000959Mudhit GuptaAshwin Gupta28/09/2017

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Mar 2024

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 - Aden Court as on Dec 2024.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on Dec 2024.pdf16 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Aden Court as on Sep 2024.pdf6 Jan 2025
Certificates of CA (Form 3)File: Form 3 of Aden Court Sept 2024.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 of Aden Court June 2024.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 of Aden Court March 2024.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 of Aden Court Dec 2023.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 of Aden Court Sept 2023.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 of Aden Court June 2023.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 of Aden Court March 2023.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 of Aden Court Dec 2022.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 of Aden Court Sept 2022.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 of Aden Court June 2022.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on September 2024.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on June 2024.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on March 2024.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on December 2023.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on September 2023.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on June 2023.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on March 2023.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on December 2022.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on September 2022.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aden Court as on June 2022.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Aden Court_FY 2022-23.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aden Court FY 2023-24.pdf18 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of CA (Form 3)File: 6 Certificates of CA (Form 3).pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Aden Court.pdf1 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC - Aden Court.pdf1 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Aden Court.pdf1 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf28 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aden Court June 2021.pdf28 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aden Court September 2021-DESKTOP-E1E6TLV.pdf28 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aden Court December 2021.pdf28 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aden Court March 2022.pdf28 Oct 2022
Certificates of CA (Form 3)File: Form 3 of Aden Court June 2021.pdf28 Oct 2022
Certificates of CA (Form 3)File: Form 3 of Aden Court Sept 2021.pdf28 Oct 2022
Certificates of CA (Form 3)File: Form 3 of Aden Court Dec 2021.pdf28 Oct 2022
Certificates of CA (Form 3)File: Form 3 of Aden Court March 2022.pdf28 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 363.pdf28 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aden Court 31st March 2021.pdf1 Mar 2022
CERSAI detailsFile: Aden Court.pdf1 Mar 2022
Certificates of CA (Form 3)File: Form 3 Aden Court 31st March 2021_compressed.pdf1 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Certificate FY 18-19.pdf24 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Certificate FY 19-20.pdf24 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Certificate FY 20-21.pdf24 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER Certificate_2019.pdf7 Aug 2019
Proforma of Allotment letterFile: Sales Agreement.pdf4 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: Further cc upto 19th floor.pdf29 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers Certificate pdf.pdf29 Sep 2018
Certificates of CA (Form 5)File: Gupta MahaRERA Form 5.pdf29 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: 2025488_firstcc_signed.pdf27 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: 2118065_furthercc_signed.pdf27 Mar 2018
Certificates of CA (Form 3)File: compressed_ca certificate sohan.pdf28 Jul 2017
Building plan approvalFile: IOD.pdf26 Jul 2017
Layout approvalFile: IOD PLAN.pdf26 Jul 2017
PAN CardFile: GH PAN CARD.PDF26 Jul 2017
Copy of the legal title reportFile: Title Certificate - Lex Juris.pdf26 Jul 2017
Details of encumbrancesFile: Letter for Encumbrances.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: IOD PLAN.pdf26 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf26 Jul 2017
Declaration in FORM BFile: Declaration Form B GHPL.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GHPL - Engineer certificate.pdf26 Jul 2017
Proforma of Allotment letterFile: Letter for Draft Agreement.pdf26 Jul 2017
Proforma of Allotment letterFile: Draft Application Letter.pdf26 Jul 2017

Keep Aden Court on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai

2 kmAden CourtCompleted 43Lapsed / revoked 17Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: Gupta Housing Pvt Ltd

Gupta Housing Pvt Ltd has 1 registration on MahaRERA, including Aden Court. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that Aden Court shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Aden Court is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aden Court?

The registered promoter entity is Gupta Housing Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aden Court?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Aden Court?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Aden Court?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Aden Court?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aden Court. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aden Court to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.