ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / ADDITYA RESIDENCY

Completed No litigation declared Plotted project

ADDITYA RESIDENCY

By SACHIN SURYABHAN MOON

RG-MH-41053 · RERA P50500024038 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
61 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

ADDITYA RESIDENCY is a Plotted project by SACHIN SURYABHAN MOON in Nagpur, Maharashtra, registered with MahaRERA as P50500024038 on 16 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2023. 0 of the 61 units on this registration are recorded sold or booked.

At a glance

Project

  • NameADDITYA RESIDENCY
  • TypePlotted
  • Location
    • WARDHA ROAD
    • GAWASI MANAPUR
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500024038
  • ReraGenie IDRG-MH-41053

Builder

  • NameSACHIN SURYABHAN MOON
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2020PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Jan 2020
  • Promised completion30 Dec 2023
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed80 files

Current status

0%0 of 61 units booked

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,543 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNAGPUR METROPOLITAN REGION DEVELOPMENT AUTHORITY (NMRDA)

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHAMLA NAGPUR

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas G Bahadure
EngineerRajesh Revatkar
Chartered AccountantKumar & Jaikrishnan
Chartered AccountantGAD AND ASSOCIATES
Chartered AccountantSUMIT SANTOSH AGRAWAL AND ASSOCIATES
PartnerRole in project
SACHIN SURYABHAN MOON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jun 2026

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: ADDITYA RESIDENCY OC MERGE.pdf11 Jun 2026
Form 1File: Additya Residency_ Form 1_ MARCH -20.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_MARCH_20.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_MAR-20.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_JUNE_21.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ JUNE -20.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_JUNE_20.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_june-20.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_JUNE_21.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ SEP -20.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_SEP_20.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_SEP-20.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_JUNE_21.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ DEC -20.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_DEC_20.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_DEC-20.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_JUNE_21.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ MARCH -21.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_MARCH_21.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_MAR-21.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_JUNE_21.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ JUNE -21.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_JUNE_21.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_june-21.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_JUNE_21.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ SEP -21.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_SEP_21.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_SEP-21.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_SEP_21.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ DEC -21.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_DEC_21.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_DEC-21.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_DEC_21.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ MARCH -21.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_MARCH_21.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_MAR-21.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_MAR_22.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ JUNE -22.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_JUNE_22.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_june-22.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_JUNE_22.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ SEP -22.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_SEP_22.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_SEP-22.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_SEP_22.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ DEC -22.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_DEC_22.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_DEC-22.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_DEC_22.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ MARCH -23.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_MARCH_23.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_MAR-23.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_MAR_23.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ JUNE -23.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_JUNE_23.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_june-23.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_JUNE_23.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ SEP -23.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_SEP_23.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_SEP-23.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_SEP_23.pdf13 Aug 2025
Form 1File: Additya Residency_ Form 1_ DEC -23.pdf13 Aug 2025
Form 2File: Additya Residency Form_2_DEC_23.pdf13 Aug 2025
Form 3File: FORM 3_ ADDITYA RESIDENCY_DEC-23.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Additya Residency_DEC_23.pdf13 Aug 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RL.pdf29 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf29 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RL.pdf29 Dec 2023
Copy of the legal title reportFile: Search report New.pdf6 Jan 2020
Details of encumbrancesFile: Encumbrance Letter new.pdf6 Jan 2020
Building plan approval or NA orderFile: Gawasi 34-2 Final Map RERA.pdf3 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Gawasi 34-2 Final Map RERA.pdf3 Jan 2020
Layout approvalFile: layout permit 34-2.pdf2 Jan 2020
PAN CardFile: SACHIN MOON PAN.pdf2 Jan 2020
Copy of Layout Approval (in case of layout)File: layout permit 34-2.pdf2 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Gawasi 34-2 Cover Letter.pdf2 Jan 2020
Declaration in FORM BFile: Notarial.pdf2 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Original Engineer's Certificate34-2.pdf2 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate 34-2.pdf2 Jan 2020
Proforma of Allotment letterFile: _gawasi draft.pdf2 Jan 2020

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ADDITYA RESIDENCYGAWASI MANAPUR-CompletedDec 2022Dec 2022
SHIVAJI COMPLEXKALMESHWAR34CompletedDec 2021Dec 2021
VEDAARYAWARDHA ROAD224CompletedAug 2019Late, Aug 2019

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ADDITYA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GAWASI MANAPUR2,800+ in Nagpur

2 kmADDITYA RESIDENCYCompleted 15Lapsed / revoked 2Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: SACHIN SURYABHAN MOON

SACHIN SURYABHAN MOON has 3 registrations on MahaRERA, including ADDITYA RESIDENCY and WOODS RESIDENCY. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ADDITYA RESIDENCY is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADDITYA RESIDENCY?

The registered promoter entity is SACHIN SURYABHAN MOON, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADDITYA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADDITYA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ADDITYA RESIDENCY?

The professionals named in the filing: Architect: Vikas G Bahadure; Engineer: Rajesh Revatkar; Chartered Accountant: Kumar & Jaikrishnan; Chartered Accountant: GAD AND ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADDITYA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADDITYA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADDITYA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.