Home / Browse projects / Palghar, Maharashtra / ACROPOLIS 2

Completed No litigation declared Residential / Group Housing project

ACROPOLIS 2

By Bhoomi & Arkade Associates

RG-MH-26053 · RERA P99000006132 · Last updated on MahaRERA portal: 31 May 2023

Source: official MahaRERA filing

Red flags

  • 40 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
60 of 66Construction stages doneacross 6 buildings; furthest along: Podiums (if any), 0%
40Complaints at MahaRERAon this registration
Jump to the 28 documents Report an error

ACROPOLIS 2 is a Residential / Group Housing project by Bhoomi & Arkade Associates in Palghar, Maharashtra, registered with MahaRERA as P99000006132 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 40 complaints are on record with the regulator.

At a glance

Project

  • NameACROPOLIS 2
  • TypeResidential / Group Housing
  • Location
    • Chilkhaldongri Road
    • Virar west
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000006132
  • ReraGenie IDRG-MH-26053

Builder

  • NameBhoomi & Arkade Associates
  • Entity typePartnership
  • PartnersArkade Developers Private Limited Arkade Developers Private Limited, Bhoomi Shashwat Estate Private Limited Bhoomi Shashwat Estate Private Limited
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings6 building records
  • Documents filed28 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA170000
BNA170000
CNA170000
DNA170000
ENA170000
FNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 31 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

60 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 31 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Podium with ClubhouseYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,077 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19946.34
Proposed, not sanctioned19,946 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSwastik Paradise Opp Viva college Viva College Road Thane 401303

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectREZA KABUL
ArchitectAJAY WADE AND ASSOCIATES
EngineerHIREN M TANNA
PartnerRole in project
Bhoomi & Arkade Associates-

Litigation declared1

CaseCourtStatus
2901/2015BOMBAY HIGH COURTPENDING FOR ADMISSION

Complaints filed with MahaRERA40

Case no.ComplainantRespondentFiled
CC006000000000224Rakesh JainM/S. BHOOMI & ARKADE ASSOCIATES08/11/2017
CC006000000000691SANGEETA CHANDRASHEKHAR RAIBHOOMI & ARKADE ASSOCIATE16/09/2017
CC006000000023768Riyaz JethamM/S Bhoomi & Arkade Associates17/03/2018
CC006000000044090Mr Sachin Prabhakar Kadam and Mrs Meena Sachin KadamM/s Bhoomi & Arkade Associates12/04/2018
CC006000000054591Hina NimavatBhoomi & Arkade Associates18/06/2018
CC006000000057050Vijay Lal MenariaM/s. Bhoomi & Arkade Associates26/11/2018
CC006000000057038Aarti Yeshwant KambleM/s. Bhoomi & Arcade Associates24/11/2018
CC006000000057254Suresh Sadanand ShettyM/s. Bhoomi & Arkade Associates11/12/2018
CC006000000057490Austin Selvaraj PillaiBhoomi and Arkade Associates03/01/2019
CC006000000089573Rehana Hussain / Sameer HussainBhoomi & Arkade associates11/06/2019
CC006000000193037Hasmukh WaghelaAcropolis15/03/2020
CC006000000193875Neelam VishwakarmaBhoomi & Arkade Associates(Acropolis)13/02/2021
CC006000000195151Laxmi Madaswamy & anrBHOOMI & ARKADE ASSOCIATES06/12/2020
CC006000000195155Velpandian ThevarBhoomi & Arkade Associates06/12/2020
CC006000000196172YASMEEN M NAIKBHOOMI ARKADE & ASSOCIATES27/02/2021
CC006000000196809Mr. Vijay ValanjuBhoomi & Arkade Associates27/05/2021
CC006000000196893SURESH SADANAND SHETTYM/s Bhoomi and ArcadeAssociates05/05/2021
CC006000000197123Mangal Maruti NikankeM/s. Bhoomi & Arkade Associates01/06/2021
CC006000000197107Sachin L. KulayeM/s. Bhoomi & Arkade Associates01/06/2021
CC006000000197127Arun Shankar SonejiM/s. Bhoomi & Arkade Associates02/06/2021
CC006000000197155Avinash Ashokkumar DubediM/s. Bhoomi & Arkade Associates04/06/2021
CC006000000197159Vilas Ravindra BhatM/s. Bhoomi & Arkade Associates04/06/2021
CC006000000197178Vinod Nanalal ModyM/s. Bhoomi & Arkade Associates08/06/2021
CC006000000197198Hemant LalwaniM/s. Bhoomi & Arkade Associates08/06/2021
CC006000000197239Chintan Suresh MehtaM/s. Bhoomi & Arkade Associates14/06/2021
CC006000000197241Chinmaya Sundar MishraM/s. Bhoomi & Arkade Associates14/06/2021
CC006000000197337Anthony Dasu JerryM/s. Bhoomi & Arkade Associates.21/06/2021
CC006000000197418Ekta Shyamdhar PandeyM/s. Bhoomi & Arkade Associates28/06/2021
CC006000000197439Abhijeet Santosh SakhardandeM/s. Bhoomi & Arkade Associates01/07/2021
CC006000000197556Danesh Jashanlal KarnaniM/s. Bhoomi & Arkade Associates08/07/2021
CC006000000197916Austin Selvaraj PillaiM/S Bhoomi Arkade & Associates11/08/2021
CC006000000198124Felio Teogenes DsilvaBhoomi & Arkade Associates27/08/2021
CC006000000198194RAMESH KESHAV PANDEYBhoomi & Arkade Associates31/08/2021
CC006000000198810Hiren Jitendra MistryM/S Bhoomi & Arkade Associates02/11/2021
CC006000000199115Noor Gulam BaigM/s. Bhoomi & Arkade Associates22/11/2021
CC006000000199349Jayprakash R. YadavM/s. Bhoomi & Arkade Associates08/12/2021
CC006000000209432Francis Savio DSaBhoomi & Arkade Associates16/12/2021
CC006000000210230Vasim Sultan AhmadM/s. Bhoomi & Arkade Associates02/03/2022
CC12400406Sunil PoojariBhoomi & Arkade Associates14/10/2024
CC12400756Sunil PoojariBhoomi & Arkade Associates13/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 May 2023

Documents filed28

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf31 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Phase 2.pdf31 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: A B C SOCIETY REGISTRATION CERTIFICATE.pdf4 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: D E F SOCIETY REGISTRATION CERTIFICATE.pdf4 Aug 2021
OtherFile: Occupation Certificate.pdf17 Jan 2019
Certificates of CA (Form 5)File: Acropolis 2.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Phase 2.pdf7 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate - Phase 2.pdf7 Jun 2018
Proforma of Allotment letterFile: Draft AFS Virar Phase II.pdf7 Jun 2018
Building plan approvalFile: CC COPY MARKED WITH BULD 3 and 4 SEC3.pdf30 Jul 2017
Details of encumbrancesFile: INDEX II.pdf30 Jul 2017
Building Plan Approval (IOD)File: CC COPY MARKED WITH BULD 3 and 4 SEC3.pdf30 Jul 2017
Declaration in FORM BFile: Form B Phase 2.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE PHASE 2.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH PHASE 2.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG 2nd phase.pdf29 Jul 2017
Building plan approvalFile: Layout IOD plan.pdf28 Jul 2017
Layout approvalFile: Layout IOD plan.pdf28 Jul 2017
PAN CardFile: PAN.pdf28 Jul 2017
Copy of the legal title reportFile: Legal Title report.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout IOD plan.pdf28 Jul 2017
Building Plan Approval (IOD)File: Layout IOD plan.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: A wing PCC.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: B wing PCC.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: C Wing PCC.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: E WING PCC.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: F wing.pdf28 Jul 2017
Proforma of Allotment letterFile: Allotement letter agreement for sale.pdf28 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ACROPOLIS 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar west3,200+ in Palghar

2 kmACROPOLIS 2Completed 63Lapsed / revoked 37Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 153 registered projects within 2 km.

Builder: Bhoomi & Arkade Associates

Bhoomi & Arkade Associates has 2 registrations on MahaRERA, including Acropolis 1 and ACROPOLIS 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if ACROPOLIS 2 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ACROPOLIS 2?

The registered promoter entity is Bhoomi & Arkade Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ACROPOLIS 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ACROPOLIS 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ACROPOLIS 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ACROPOLIS 2?

The professionals named in the filing: Architect: REZA KABUL; Architect: AJAY WADE AND ASSOCIATES; Engineer: HIREN M TANNA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ACROPOLIS 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ACROPOLIS 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ACROPOLIS 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.