ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / ABHINAV SHILPI

Registered No litigation declared Residential / Group Housing project

ABHINAV SHILPI

By OMKARA BUILDCON

RG-MH-75598 · RERA P50500080117 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 89%
18 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

ABHINAV SHILPI is a Residential / Group Housing project by OMKARA BUILDCON in Nagpur, Maharashtra, registered with MahaRERA as P50500080117 on 29 Apr 2025. Possession is promised by 31 Dec 2027. 6 of the 24 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameABHINAV SHILPI
  • TypeResidential / Group Housing
  • Location
    • MOUZA-AJANI
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440022
  • Pincode440022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500080117
  • ReraGenie IDRG-MH-75598

Builder

  • NameOMKARA BUILDCON
  • Entity typePartnership
  • PartnersRAVINDRA SEWAKRAM SONKUSARE, SADANAND MADHAVRAO KOKATE, VITTHAL RAMCHANDRA BAJIRAO
  • Other registrations5 more →
  • Completed2 of 6
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

25%6 of 24 units booked
29.0%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ABHINAV SHILPINA7624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 89%.

ABHINAV SHILPI: 49% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure89%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises81%
Sanitary Fittings within the flats / premises54%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.41%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes51%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes89%
Storm Water DrainsYes68%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes78%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes61%
Electrical meter room, sub-station, receiving stationYes49%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership10

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area743 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
LandownerVillageDistrict
KISHOR GANAPAT GHUDENagpur (M Corp.)Nagpur
VENKATARAMAN SUBRAMANIAM S/O PANCHAPAKESHANNagpur (M Corp.)Nagpur
RAVINDRA MANOHARRAO PANDENagpur (M Corp.)Nagpur
KISHOR VINAYAK RODAYNagpur (M Corp.)Nagpur
NEELAM DEEPAK DESHMUKHNagpur (M Corp.)Nagpur
VIJAYA SATISHCHANDRA RANADIVENagpur (M Corp.)Nagpur
KRISHNA KOTHIRAM WANJARINagpur (M Corp.)Nagpur
SAMEER VASANT KULKARNINagpur (M Corp.)Nagpur
GANESH DATTATRAYA BORKUTENagpur (M Corp.)Nagpur
PADMAKAR VASUDEORAO SUDAMENagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR MUNICIPAL CORPORATION (NMC)
Permissible FSI2600.86
Proposed, not sanctioned2,371 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG1 2 3 4 SARAF COURT, OPP YASHWANT STADIUM, DHANTOLI, NAGPUR 440012 MAHARASHTRA
Estimated costRs 5.12 cr
Cost incurredRs 1.48 cr
Work done29.0%
BuildingWingEstimatedIncurred
ABHINAV SHILPINARs 5.12 crRs 1.48 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr RAVINDRA SONKUSARE
EngineerEr GOPAL PANDHARE
Chartered AccountantCA ANKIT TALREJA
Chartered AccountantSUMIT
PartnerRole in project
OMKARA BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 DEC-2025.pdf18 Jul 2026
Withdrawal Update Form 2File: FORM-2 DEC-2025.pdf18 Jul 2026
Withdrawal Update Form 3File: FORM-3 DEC-2025.pdf18 Jul 2026
Withdrawal Update Form 1File: FORM-1 DEC-2025.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM-2 DEC-2025.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM-3 DEC-2025.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM-1 JUN-2025.pdf18 Mar 2026
Withdrawal Update Form 1File: FORM-1 SEP-2025.pdf18 Mar 2026
Withdrawal Update Form 1File: FORM-1 DEC-2025.pdf18 Mar 2026
Withdrawal Update Form 2File: FORM-2 JUN-2025.pdf18 Mar 2026
Withdrawal Update Form 2File: FORM-2 SEP-2025.pdf18 Mar 2026
Withdrawal Update Form 2File: FORM-2 DEC-2025.pdf18 Mar 2026
Withdrawal Update Form 3File: FORM-3 JUN-2025.pdf18 Mar 2026
Withdrawal Update Form 3File: FORM-3 SEP-2025.pdf18 Mar 2026
Withdrawal Update Form 3File: FORM-3 DEC-2025.pdf18 Mar 2026
Commencement Certificates / NA Order for plotted developmentFile: OMKARA MAIL.pdf10 Apr 2025
Declaration about Commencement CertificateFile: format d omkara.pdf10 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ABHINAV.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ABHINAV.pdf3 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A C.pdf3 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 2 Other - Technical.pdf3 Apr 2025
Proforma of Agreement for saleFile: ATS ABHINAV.pdf3 Apr 2025
Layout approvalFile: PLAN OB 1.pdf2 Apr 2025
Building plan approvalFile: PLAN OB 1.pdf2 Apr 2025
Building plan approvalFile: PLAN OB 2.pdf2 Apr 2025
Building plan approvalFile: PLAN OB 3.pdf2 Apr 2025
Copy of the legal title reportFile: LTR ob_.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: PLAN OB 1.pdf2 Apr 2025
Declaration in FORM BFile: form b pro OB.pdf2 Apr 2025
Declaration in FORM BFile: form b landowner OB.pdf2 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: permit OB.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN OB 1.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN OB 3.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN OB 2.pdf2 Apr 2025
Other - LegalFile: Redevelopment Agreement _1-13.pdf2 Apr 2025
Other - LegalFile: Redevelopment Agreement and -14-26.pdf2 Apr 2025
Other - LegalFile: Redevelopment Agreement -27-39.pdf2 Apr 2025
Other - LegalFile: Redevelopment Agreement -40-52.pdf2 Apr 2025
Other - LegalFile: POA-1-15.pdf2 Apr 2025
Other - LegalFile: POA_-16-30.pdf2 Apr 2025
Other - LegalFile: partnership deed ob.pdf2 Apr 2025
Other - FinanceFile: POA_-16-30.pdf2 Apr 2025
Other - FinanceFile: DEC oB.pdf2 Apr 2025
Other - FinanceFile: partnership deed ob.pdf2 Apr 2025
Other - FinanceFile: POA-1-15.pdf2 Apr 2025
Other - FinanceFile: Redevelopment Agreement -40-52.pdf2 Apr 2025
Other - FinanceFile: Redevelopment Agreement -27-39.pdf2 Apr 2025
Other - FinanceFile: Redevelopment Agreement and -14-26.pdf2 Apr 2025
Other - FinanceFile: Redevelopment Agreement _1-13.pdf2 Apr 2025
Other - TechnicalFile: qa abhinav shilp.pdf2 Apr 2025
PAN CardFile: 1 PAN Card.pdf29 Mar 2025
Details of encumbrances concerned to FinanceFile: EN LEGAL ABHINAV.pdf29 Mar 2025
Details of encumbrances concerned to FinanceFile: EN FINANCE ABHINAV.pdf29 Mar 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER ABHINAV.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ABHINAV.pdf29 Mar 2025
CERSAI detailsFile: CERSAI ABHINAV.pdf29 Mar 2025
Deviation Report with respect to Allotment letterFile: DEV AL ABHINAV.pdf29 Mar 2025
Details of encumbrances concerned to LegalFile: EN FINANCE ABHINAV.pdf29 Mar 2025
Details of encumbrances concerned to LegalFile: EN LEGAL ABHINAV.pdf29 Mar 2025
Deviation Report with respect to model copy of AgreementFile: DEV ATS ABHINAV.pdf29 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: INT DEC KOKATE.pdf29 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: INT DEC SONKUSARE.pdf29 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: INT DEC BAJIRAO.pdf29 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: INT DEC LANDOWNERS.pdf29 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format 'B'_compressed.pdf29 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: SEC UNSEC ABHINAV.pdf29 Mar 2025

How this compares with Nagpur

25%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ABHINAV SHILPI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA-AJANI2,800+ in Nagpur

2 kmABHINAV SHILPICompleted 22Lapsed / revoked 11Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: OMKARA BUILDCON

OMKARA BUILDCON has 6 registrations on MahaRERA, including OMKARA PARK WING A and OMKARA PARK WING B. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ABHINAV SHILPI is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ABHINAV SHILPI?

The registered promoter entity is OMKARA BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ABHINAV SHILPI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ABHINAV SHILPI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ABHINAV SHILPI?

The professionals named in the filing: Architect: Ar RAVINDRA SONKUSARE; Engineer: Er GOPAL PANDHARE; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: SUMIT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ABHINAV SHILPI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ABHINAV SHILPI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ABHINAV SHILPI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.