ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / ABHIMAAN ALTURA

Registration lapsed No litigation declared Residential / Group Housing project

ABHIMAAN ALTURA

By ABHIMAAN DEVELOPERS

RG-MH-05500 · RERA P52000053084 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 6 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2026Possession promised6 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
9 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

ABHIMAAN ALTURA is a Residential / Group Housing project by ABHIMAAN DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000053084 on 16 Oct 2023. Possession was promised by 30 Apr 2026 and is now 6 months past that date. 19 of the 28 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameABHIMAAN ALTURA
  • TypeResidential / Group Housing
  • Location
    • PUSHPAK NODE (VAHAL)
    • SECTOR NO. 25A
    • Wahal
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000053084
  • ReraGenie IDRG-MH-05500

Builder

  • NameABHIMAAN DEVELOPERS
  • Entity typePartnership
  • PartnerDAMJI DHANJI BAMBHANIYA

Key dates

6 months past promisethis monthRegisteredOct 2023PromisedApr 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Oct 2023
  • Promised completion30 Apr 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Current status

68%19 of 28 units booked
93.0%Work done, per cost certificate

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ABHIMAAN ALTURANA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ABHIMAAN ALTURA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered9

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area330 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Nov 2025
LandownerVillageDistrict
MILIND LALCHANDRA KOLIWahalRaigarh
MINNATH LALCHANDRA KOLIWahalRaigarh
NIRMALA CHINTAMAN KARDINTargharRaigarh

Approvals and building plan

Permissible FSI1186.25
Proposed, not sanctioned1,152 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND & FIRST FLOOR, SAI PRASAD ARCADE, PLOT NO.2, SECTOR 7, KAMOTHE, NAVI MUMBAI, DIST. RAIGAD, MAHARASHTRA PIN 410206
Estimated costRs 2.91 cr
Cost incurredRs 2.71 cr
Work done93.0%
BuildingWingEstimatedIncurred
ABHIMAAN ALTURANARs 2.91 crRs 2.71 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION ARCHITECTURE INTERIOR DESIGNS
EngineerB S SUKTHANKAR & ASSOCIATES
EngineerHimadri Banerjee
Chartered AccountantKARAN JAIN & CO
PartnerRole in project
ABHIMAAN DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1- Q4- Abhimaan.pdf2 May 2026
Withdrawal Update Form 2File: Form 2- Q4- Abhimaan.pdf2 May 2026
Withdrawal Update Form 3File: Form 3- Q4- Abhimaan_compressed.pdf2 May 2026
Layout approvalFile: CIDCO- Sanctioned Plan.pdf17 Mar 2026
Withdrawal Update Form 1File: FORM 1 - Atura.pdf11 Feb 2026
Withdrawal Update Form 2File: Form 2- Abhimaan Eng certificate (ATura) 05 01 2026.pdf11 Feb 2026
Withdrawal Update Form 3File: Form 3_CA Signed_Q3_2025-26 - Atura.pdf11 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf13 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf13 Nov 2025
Withdrawal Update Form 2File: FORM 2 June 2025.pdf13 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf13 Nov 2025
Withdrawal Update Form 3File: FORM 3 June 2025.pdf13 Nov 2025
Withdrawal Update Form 3File: FORM 3 June 2025.pdf13 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf11 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf11 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf11 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE_Q3.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE_q4.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q3 2024-25_compressed.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4_2024-25.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3 2024-25 Abhimaan Eng certificate (ATura) 10 01 2025.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q4-24-25_Abhimaan Eng certificate (ATura) 18 04 2025.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 _Q1_24-25.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Q2_24-25.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Abhimaan_Q1_24-25.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Q2_24-25_11zon.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 _Q1_24-25.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q2_24-25.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE.pdf24 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE.pdf24 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFICATE.pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Mar 2024
Details of encumbrances concerned to FinanceFile: Emcumbrances concerned to Finance.pdf5 Sep 2023
Details of encumbrances concerned to LegalFile: Emcumbrances concerned to Finance.pdf5 Sep 2023
Layout approvalFile: LAYOUT.pdf18 May 2023
Building plan approvalFile: APPROVED PLAN.pdf18 May 2023
Copy of the legal title reportFile: Legal Title Report and Search Report.pdf18 May 2023
Details of encumbrances concerned to FinanceFile: Emcumbrances concerned to Legal.pdf18 May 2023
Details of encumbrances concerned to LegalFile: Emcumbrances concerned to Legal.pdf18 May 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf18 May 2023
Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN.pdf18 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf18 May 2023
Declaration about Commencement CertificateFile: Commencement Certificate Format D.pdf18 May 2023
Declaration in FORM BFile: Form B.pdf18 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate.pdf18 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate.pdf18 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200266747599_For_Asset_Based_Search_21_04_2023_18_17_53_844.pdf18 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf18 May 2023
Proforma of Agreement for saleFile: Draft Model Agreement_RERA-Agreement-Abhimaan-Altura.pdf18 May 2023
Proforma of Allotment letterFile: Draft Allotment Letter_RERA Allotment-Abhimaan-Altura-Pushpak.pdf18 May 2023
Other - LegalFile: Agreement to Lease_CIDCO.pdf18 May 2023
Other - LegalFile: Deed Of Distribution Of Flats.pdf18 May 2023
Other - LegalFile: Tripartite Agreement.pdf18 May 2023
PAN CardFile: Abhiman Pan.pdf28 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Account Format A.pdf28 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation Report With Respect to Allotment Letter.pdf28 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with Respect to Model Copy of the Agreement.pdf28 Apr 2023

How this compares with Raigarh

68%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ABHIMAAN ALTURA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR NO. 25A5,900+ in Raigarh

Builder: ABHIMAAN DEVELOPERS

ABHIMAAN DEVELOPERS has 1 registration on MahaRERA, including ABHIMAAN ALTURA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that ABHIMAAN ALTURA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ABHIMAAN ALTURA is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ABHIMAAN ALTURA?

The registered promoter entity is ABHIMAAN DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ABHIMAAN ALTURA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ABHIMAAN ALTURA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ABHIMAAN ALTURA?

The professionals named in the filing: Architect: DESTINATION ARCHITECTURE INTERIOR DESIGNS; Engineer: B S SUKTHANKAR & ASSOCIATES; Engineer: Himadri Banerjee; Chartered Accountant: KARAN JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ABHIMAAN ALTURA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ABHIMAAN ALTURA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ABHIMAAN ALTURA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.