Completed No litigation declared Commercial project

ABH CAPITAL PHASE I

By TANU REALITY LLP

RG-MH-13729 · RERA P51600027827 · Last updated on MahaRERA portal: 21 Dec 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

ABH CAPITAL PHASE I is a Commercial project by TANU REALITY LLP in Nashik, Maharashtra, registered with MahaRERA as P51600027827 on 4 Jan 2021. The registration is recorded completed; possession was promised by 30 Mar 2023.

At a glance

Project

  • NameABH CAPITAL PHASE I
  • TypeCommercial
  • Location
    • SHARANPUR ROAD OPP RAMAYAN BUNGLOW
    • TILAKWADI
    • Nashik (M Corp.)
    • Nashik
    • 422002
  • Pincode422002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600027827
  • ReraGenie IDRG-MH-13729

Builder

  • NameTANU REALITY LLP
  • Entity typePartnership
  • PartnersNISHIT VIJAYGOPAL ATAL, REETESH DHARAMPAL HANSWANI, PRASHANT MOHANLAL BAGMAR, PRASHANT MOHANLAL BAGMAR, REETESH DHARAMPAL HANSWANI, NISHIT VIJAYGOPAL ATAL
  • Other registrations6 more →
  • Completed6 of 7
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2021PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Jan 2021
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ABH CAPITAL PHASE INA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ABH CAPITAL PHASE I: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area673 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1093.58
Proposed, not sanctioned1,094 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUYOJIT SANKUL SHARANPUR ROAD NASHIK

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPANKAJ JADHAV
EngineerPUNIT DINESH CHANDRA RAI
Chartered AccountantKRISHNA SANTOSH JAJOO
PartnerRole in project
TANU REALITY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jan 2023

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Capital I_2023.pdf21 Dec 2023
Other - FinanceFile: 20230724120110.pdf24 Jul 2023
Other - FinanceFile: Capital 1_05-06-23.pdf17 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: RERA Form 4_ABH Capital 1.pdf8 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Capital PH 1_Q3.pdf3 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Capital 1_Q3_uploaded.pdf10 Mar 2023
Disclosure of sold/ booked inventoryFile: Capital I_Uploaded.pdf16 Feb 2023
Other - FinanceFile: TANU CAPITAL-1_19-01-23.pdf24 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Capital PH 1.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Capital 1_Q2_uploaded.pdf13 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: CAPITAL- Status of formation of legal entity.pdf5 Jan 2023
Status of ConveyanceFile: CAPITAL- DEED OF DECLARATION_1.pdf5 Jan 2023
Status of ConveyanceFile: CAPITAL- DEED OF DECLARATION_2.pdf5 Jan 2023
Status of ConveyanceFile: CAPITAL- DEED OF DECLARATION_3.pdf5 Jan 2023
Status of ConveyanceFile: CAPITAL- DEED OF DECLARATION_4.pdf5 Jan 2023
Status of ConveyanceFile: CAPITAL- DEED OF DECLARATION_5.pdf5 Jan 2023
Status of ConveyanceFile: CAPITAL- DEED OF DECLARATION_6.pdf5 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Capital_Phase 1_Completion Certificate.pdf4 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Capital 1_uploaded.pdf12 Dec 2022
Disclosure of sold/ booked inventoryFile: Capital 1_uploaded.pdf1 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Capital 1-Q2_uploaded.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-CAP 1.pdf13 Jul 2022
Disclosure of sold/ booked inventoryFile: CAPITAL 1.pdf13 Jul 2022
Details of encumbrances concerned to LegalFile: cap 1.pdf6 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 0568_220525130204_001_11zon.pdf25 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Capital 1_compressed.pdf30 Apr 2022
Disclosure of sold/ booked inventoryFile: Cap 1-sold unsold_compressed.pdf7 Apr 2022
OtherFile: Cap 1-2A_compressed.pdf7 Apr 2022
Details of encumbrancesFile: Capital-1.pdf6 Apr 2022
Building plan approvalFile: BUILDING PLAN - 1, DATED- 31-12-2021_11zon.pdf9 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN - 1, DATED- 31-12-2021_11zon.pdf9 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE- 31-12-2021_11zon.pdf9 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ABH Capital-Phase I_compressed.pdf23 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate_compressed (1).pdf17 Jan 2022
Details of encumbrancesFile: Capital 1.pdf7 Jan 2022
CERSAI detailsFile: Capital 1.pdf7 Jan 2022
OtherFile: Cap I_compressed.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: Capital I_uploaded.pdf6 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CAPITAL -1.pdf5 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Capital I.pdf3 Dec 2021
Details of encumbrancesFile: encum.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CAPITAL I-Engg.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: sold or booked_Capital I.pdf7 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: cA cert_compressed.pdf7 Oct 2021
OtherFile: Capital I.pdf4 Oct 2021
Disclosure of sold/ booked inventoryFile: Capital PH I_compressed.pdf14 Aug 2021
Details of encumbrancesFile: Encumbrance-Capital PH 1.pdf13 Aug 2021
Declaration about Commencement CertificateFile: Declaration-commencement Capital PH 1.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CAPITAL PH I-Architect.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ABH CAPITAL_0001_Uploaded.pdf13 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate 31072021_Uploaded.pdf13 Aug 2021
Building plan approvalFile: BUILDING PLAN SHEET- 1_updated.pdf9 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN SHEET- 1_updated.pdf9 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Capital Phase I_0001.pdf9 Aug 2021
PAN CardFile: TRLLP PAN CARD.pdf30 Dec 2020
Building plan approvalFile: Building plan.pdf28 Dec 2020
Layout approvalFile: Building plan.pdf28 Dec 2020
Copy of the legal title reportFile: Title Report.pdf28 Dec 2020
Details of encumbrancesFile: Non-encumberances.pdf28 Dec 2020
Copy of Layout Approval (in case of layout)File: Building plan.pdf28 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: Building plan.pdf28 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Dec 2020
Declaration in FORM BFile: Form B.pdf28 Dec 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf28 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf28 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf28 Dec 2020
Proforma of Allotment letterFile: Draft Letter of Allotment.pdf28 Dec 2020
Proforma of Allotment letterFile: Draft Agreement to Sale.pdf28 Dec 2020

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ABH CAPITAL PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TILAKWADI4,100+ in Nashik

2 kmABH CAPITAL PHASE ICompleted 140Lapsed / revoked 37Other 89Dot size: filed unitsN

Filed coordinates, straight-line distance. 266 registered projects within 2 km.

Builder: TANU REALITY LLP

TANU REALITY LLP has 7 registrations on MahaRERA, including TOWN SQUARE and ABH SAMRUDDHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if ABH CAPITAL PHASE I is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ABH CAPITAL PHASE I?

The registered promoter entity is TANU REALITY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ABH CAPITAL PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ABH CAPITAL PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ABH CAPITAL PHASE I?

The professionals named in the filing: Architect: PANKAJ JADHAV; Engineer: PUNIT DINESH CHANDRA RAI; Chartered Accountant: KRISHNA SANTOSH JAJOO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ABH CAPITAL PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ABH CAPITAL PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ABH CAPITAL PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.