AATREY AANGAN
RG-MH-05046 · RERA P51600023362 · Last updated on MahaRERA portal: 9 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 28 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AATREY AANGAN is a Others project by AATREY PROJECT in Nashik, Maharashtra, registered with MahaRERA as P51600023362 on 12 Dec 2019. Possession was promised by 30 Jun 2024 and is now 28 months past that date.
At a glance
Project
- NameAATREY AANGAN
- TypeOthers
- Location
- TARAWALA AMRUTDHAM LINK ROAD
- NEAR RESHIMBAND LAWNS
- Nashik (M Corp.)
- Nashik
- 422003
- Pincode422003
- RERA no.P51600023362
- ReraGenie IDRG-MH-05046
Builder
- NameAATREY PROJECT
- Entity typePartnership
- PartnersYOGESH ARAVIND CHOUDHARI, SACHIN PRABHAKAR KOTHAWADE, CHETAN DILIP PATKAR, DEEPAK MURLIDHAR KOTHAWADE, ANJALI SACHIN KOTHAWADE, PRACHI YOGESH CHAOUDHARI, ARCHANA DEEPAK KOTHAWADE, POOJA SANJAY PATKAR
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on12 Dec 2019
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings3 building records
- Documents filed50 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AATREY AANGAN WING - A | NA | 11 | 0 | 0 | 0 | 0 |
| AATREY AANGAN WING - B | NA | 11 | 0 | 0 | 0 | 0 |
| AATREY AANGAN WING - C | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 9 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 0%.
AATREY AANGAN WING - A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
AATREY AANGAN WING - B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
AATREY AANGAN WING - C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 9 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed81
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| AATREY AANGAN WING - A | 19 | 6 | 25 |
| AATREY AANGAN WING - B | 0 | 28 | 28 |
| AATREY AANGAN WING - C | 19 | 9 | 28 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| CHINMAY KISHOR SARAF | Sangamner (MCL) | Ahmednagar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUMIT & BANSRI KUMATH |
| Engineer | S D AHER |
| Chartered Accountant | AKASH MAHAVIR BHANDARI |
| Partner | Role in project |
|---|---|
| AATREY PROJECT | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Nov 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Nov 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Nov 2023
Documents filed50
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Disclosure of Interest in Other Real Estate Organizations.pdf | 9 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan - Aatrey Project - Form 3 - 24-25 - Q 2.pdf | 9 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Scan - Aatrey Project - Form 3 - 24-25 - Q 2.pdf | 9 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Scan - Aatrey Project - Form - 5 - 23-24.pdf | 9 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan - Form 3 - Q 4 - Aatrey Project.pdf | 30 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aatrey Project - Form - 02.pdf | 5 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan - Aatrey Project - Form 3 - 23-24 - Q3.pdf | 8 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aatrey Project - Form - 01.pdf | 31 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aatrey Project - Form 2 A - Mar 23.pdf | 31 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aatrey Project - Form 2 A - Jun - 23.pdf | 31 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aatrey Project - Form 2 A - Sep - 23.pdf | 31 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aatrey Project - Form 2 A - Dec - 23.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Aatrey Project - Sold Inventory - June 23 to Dec - 23.pdf | 31 Jan 2024 |
| Copy of the legal title reportFile: Aatrey Project - Title Report_compressed.pdf | 27 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Title Report.pdf | 27 Nov 2023 |
| Details of encumbrancesFile: Title Report.pdf | 27 Nov 2023 |
| Details of encumbrancesFile: Aatrey Project - Title Report_compressed.pdf | 27 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Title Report.pdf | 27 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory - 31-03-2023.pdf | 27 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 27 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan - Aatrey Project - Form - 03 - 22-23_compressed.pdf | 25 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Aatrey Project - Form - 05 - 22-23.pdf | 25 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Aatrey Project - Form - 05 - 22-23.pdf | 25 Nov 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2) COMPLETION CERTIFICATE.PDF | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Attach - Aatrey Capital - Form - 03 - Scan Copy.pdf | 21 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Aatrey Aangan - Form - 5 Scan.pdf | 1 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 AATREY AANGAN - FORM 3.pdf | 30 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AATREY AANGAN FROM 5.pdf | 28 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AATREY PROJECT - FORM - 3 - FY - 19-20.pdf | 14 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AATREY AANGAN FORM 3.pdf | 13 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - DEVELOPER.pdf | 25 Nov 2019 |
| Layout approvalFile: APPROVED LAYOUT.pdf | 23 Nov 2019 |
| Building plan approvalFile: BSP 1 compressed.pdf | 23 Nov 2019 |
| Building plan approvalFile: BSP 2 compressed.pdf | 23 Nov 2019 |
| Building plan approvalFile: BSP 3 compressed.pdf | 23 Nov 2019 |
| Building plan approvalFile: BSP 4 compressed.pdf | 23 Nov 2019 |
| PAN CardFile: PAN.pdf | 23 Nov 2019 |
| Copy of the legal title reportFile: TITLE LEGAL REPORT.pdf | 23 Nov 2019 |
| Details of encumbrancesFile: EMCUMBERANCE CERTIFICATE.pdf | 23 Nov 2019 |
| Copy of Layout Approval (in case of layout)File: APPROVED LAYOUT.pdf | 23 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: BSP 1 compressed.pdf | 23 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: BSP 2 compressed.pdf | 23 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: BSP 3 compressed.pdf | 23 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: BSP 4 compressed.pdf | 23 Nov 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 23 Nov 2019 |
| Declaration in FORM BFile: FORM B DEVELOPER.pdf | 23 Nov 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 23 Nov 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 23 Nov 2019 |
| Proforma of Allotment letterFile: Agreement to Sales format.pdf | 23 Nov 2019 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER - AATREY AANGAN.pdf | 23 Nov 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 50 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep AATREY AANGAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR RESHIMBAND LAWNS4,100+ in Nashik
THE PLATINUM MALL BY PARKSYDE
JAIKUMAR CONSTRUCTIONS LTD
AVADH UTOPIA
DHATRAK CONSTRUWELL
ROONGTA ELEGANTE APARTMENT
ROONGTA LANDMARKS LLP
Siddhivinayak Trade Center
Dhatrak Constructions
G SQUARE
GIRI ASSOCIATE CONSTRUCTION
SADGURU HOMES
SHREE SADGURU HOMES
See every Nashik project, with the district possession charts
Builder: AATREY PROJECT
AATREY PROJECT has 1 registration on MahaRERA, including AATREY AANGAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that AATREY AANGAN shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AATREY AANGAN is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AATREY AANGAN?
The registered promoter entity is AATREY PROJECT, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AATREY AANGAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AATREY AANGAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AATREY AANGAN?
The professionals named in the filing: Architect: SUMIT & BANSRI KUMATH; Engineer: S D AHER; Chartered Accountant: AKASH MAHAVIR BHANDARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AATREY AANGAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback