Registered No litigation declared Others project

Aastha Omkar

By Aastha Realtors

RG-MH-50197 · RERA P51700035044 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken
  • Rs 5.00 crore secured on the land, in favour of MOTILAL OSWAL HOME FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 24 months from the original
3 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 65%
205 of 315Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Aastha Omkar is a Others project by Aastha Realtors in Thane, Maharashtra, registered with MahaRERA as P51700035044 on 29 Apr 2022. Possession is promised by 31 Dec 2028. The completion date has moved by 24 months from the original filing. 110 of the 315 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.

At a glance

Project

  • NameAastha Omkar
  • TypeOthers
  • Location
    • Balyani
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700035044
  • ReraGenie IDRG-MH-50197

Builder

  • NameAastha Realtors
  • Entity typePartnership
  • PartnersNaresh Manoharlal Chaplot, Sachin Velji Shah
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2022First promiseDec 2026Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2022
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2026)
  • Buildings2 building records
  • Documents filed82 files

Current status

35%110 of 315 units booked
13.8%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA17161650165
Wing ANA141412921150

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 65%.

Wing B34%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed142

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots142
Closed/Covered48
Open Space94
BuildingClosed/CoveredOpen SpaceTotal
Wing B324779
Wing A164763

Land and ownership24

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,481 sq m
Land owned byNot the promoter
Named landowners24
Encumbrance on the landDeclared present
Charge in favour ofMOTILAL OSWAL HOME FINANCE LIMITED
Secured amountRs 5.00 crore
CERSAI search filedYes
Declared on17 Jan 2026
LandownerVillageDistrict
Vishnu Laxman DereMumbai CityMumbai City
Jayprakash SinghMumbai CityMumbai City
Sharda RaneMumbai CityMumbai City
Dagdu S GadhariMumbai CityMumbai City
Ratan V MulikMumbai CityMumbai City
Surekha DhereMumbai CityMumbai City
Vijay MulikMumbai CityMumbai City
Sharad H RaneMumbai CityMumbai City
Dilip R BhavsarMumbai CityMumbai City
Vishal Vishwas DeshpandeMumbai CityMumbai City
Kalpana A GulekarDadar- NagaonMumbai City
Beena K PadvalMumbai CityMumbai City
Lalit T ShindeMumbai CityMumbai City
Priti T ShindeMumbai CityMumbai City
Sameer T ShindeMumbai CityMumbai City
Bhushan T ShindeMumbai CityMumbai City
Ibrahim Mohammed Hussein GujarKalyan-Dombivali (M Corp.)Thane
Prabhakar G ParabMumbai CityMumbai City
Neeta P ParabMumbai CityMumbai City
Harishchandra J KolekarMumbai CityMumbai City
Digambar V KhadpeMumbai CityMumbai City
Deepika D KhapdeMumbai CityMumbai City
Manisha D GadhariMumbai CityMumbai City
Naresh M ChaplotMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION, KALYAN
Permissible FSI17079.05
Proposed, not sanctioned17,079 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUMA GALAXY SHOP NO 1 AND 2 NEAR MAHAGANPATI MANDIR TITWALA EAST TAL KALYAN KALYAN DOMBIVLI MAHARASHTRA 421605
Estimated costRs 46.46 cr
Cost incurredRs 6.40 cr
Work done13.78%
BuildingWingEstimatedIncurred
Wing BNARs 22.98 crRs 6.40 cr
Wing ANARs 22.98 cr-
-NARs 50.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDe Con Consultants
EngineerManohar Patil & Associates
EngineerPritesh Pravin Jadhav
Chartered AccountantLKC & Co.
Chartered AccountantT P Dangi & Associates
PartnerRole in project
Aastha Realtors-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700027755Dec 2026 → Dec 2028

Reason as filed by the promoterDUE TO CHANGE IN THE PLAN AND INCREASE OF FSI, THE PROJECT EXTENSION IS REQUIRED. REQUIRED DETAILS ARE ATTACHED HEREWITH

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A YEAR 2025-26_ (1).pdf30 Jun 2026
Form 2A (FY 2024-2025)File: FORM 2A FY 24- 25.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 Signed 31032026.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2 Signed 31032026.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3 Signed 31032026.pdf25 Apr 2026
Withdrawal Update Form 1File: Form 1 Signed.pdf24 Feb 2026
Withdrawal Update Form 1File: Form 1 signed 31122025.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 signed.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 signed 31122025.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 Signed.pdf24 Feb 2026
Withdrawal Update Form 3File: FORM-3 - AASTHA REALTORS Signed.pdf24 Feb 2026
Withdrawal Update Form 1File: Form 1 - 30-06-2025.pdf21 Feb 2026
Withdrawal Update Form 2File: Form 2 - 30-06-2025.pdf21 Feb 2026
Withdrawal Update Form 3File: Form 3 - 30-06-2025.pdf21 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 Signed.pdf24 Jan 2026
Disclosure of sold/ booked inventoryFile: Sold_unsold_inventory.pdf29 Mar 2025
Layout approvalFile: PLAN 1.pdf26 Mar 2025
Layout approvalFile: PLAN 1.pdf26 Mar 2025
Copy of Layout Approval (in case of layout)File: PLAN 1.pdf26 Mar 2025
Copy of Layout Approval (in case of layout)File: PLAN 1.pdf26 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FY 22-23.pdf26 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 23-24.pdf26 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold_unsold_inventory_31st_Dec_2024.pdf3 Mar 2025
Layout approvalFile: PLAN 1.pdf28 Feb 2025
Building plan approvalFile: PLAN 2.pdf28 Feb 2025
Building plan approvalFile: PLAN 3.pdf28 Feb 2025
Copy of Layout Approval (in case of layout)File: PLAN 1.pdf28 Feb 2025
Declaration in FORM BFile: Form B_PROMOTER.pdf28 Feb 2025
Declaration in FORM BFile: Form B_Land Owner FINAL.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: NEW FULL CC.pdf28 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf28 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 3.pdf28 Feb 2025
Declaration about Commencement CertificateFile: FORMAT-D_DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Revised.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf5 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory disclosure.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec'23.pdf1 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec'23.pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec'23.pdf30 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec'23 Signed.pdf30 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Aastha Omkar.pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept'23.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept'23.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept'23 Signed.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June'23.pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June'23.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March'23.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June'23.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 _March'23.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_March'23 Signed.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Signed.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed compressed.pdf18 Jan 2023
Copy of the legal title reportFile: Format A.pdf27 Apr 2022
Declaration in FORM BFile: Form-B Naresh sir.pdf27 Apr 2022
Proforma of Allotment letterFile: allotment letter.pdf27 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Artitech Certificate.pdf9 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf9 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf9 Apr 2022
Proforma of Allotment letterFile: astha rera draft new project feb 2022 (2).pdf4 Apr 2022
PAN CardFile: PAN Aashta Realtors.pdf31 Mar 2022
Layout approvalFile: Layout Plan.pdf23 Mar 2022
Building plan approvalFile: Building Plan.pdf23 Mar 2022
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf23 Mar 2022
CERSAI detailsFile: CERSAI.pdf23 Mar 2022
Details of encumbrancesFile: Letter of encumbrance.pdf22 Mar 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
AASTHA EVERSHINES NO 56 H NO 35A 35B 35C 35D 2A Village Titwala Taluka Kalyan District Thane 42160561CompletedDec 2018Late, Feb 2019

How this compares with Thane

35%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aastha Omkar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balyani7,600+ in Thane

2 kmAastha OmkarCompleted 47Lapsed / revoked 12Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 81 registered projects within 2 km.

Builder: Aastha Realtors

Aastha Realtors has 1 registration on MahaRERA, including Aastha Omkar. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Aastha Omkar is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aastha Omkar?

The registered promoter entity is Aastha Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aastha Omkar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aastha Omkar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aastha Omkar?

The professionals named in the filing: Architect: De Con Consultants; Engineer: Manohar Patil & Associates; Engineer: Pritesh Pravin Jadhav; Chartered Accountant: LKC & Co.; Chartered Accountant: T P Dangi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aastha Omkar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aastha Omkar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aastha Omkar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.