Home / Browse projects / Pune, Maharashtra / Aarohan Residency

Registered No litigation declared Residential / Group Housing project

Aarohan Residency

By G S Developers

RG-MH-87393 · RERA P52100053056 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 18 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
19 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Aarohan Residency is a Residential / Group Housing project by G S Developers in Pune, Maharashtra, registered with MahaRERA as P52100053056 on 12 Oct 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 18 months from the original filing. 5 of the 24 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameAarohan Residency
  • TypeResidential / Group Housing
  • Location
    • 35/3
    • Bhugaon
    • Pune
    • Bhugaon
    • Mulshi
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053056
  • ReraGenie IDRG-MH-87393

Builder

  • NameG S Developers
  • Entity typePartnership
  • PartnersNarayan Rakhmaji Shinde, Pradhan Tukaram Gaikwad, Rajiv Eknath Kurhade
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2023First promiseJun 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed100 files

Current status

21%5 of 24 units booked
34.4%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aarohan ResidencyNA4324024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

Aarohan Residency: 31% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,300 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Nov 2025
LandownerVillageDistrict
Rajiv Eknath KurhadeKothrudPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority, Pune
Permissible FSI1560.0
Proposed, not sanctioned1,560 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchC.S.NO-688 TO 690 ,OFF KUMTHEKAR ROAD,SADASHIV PETH ,PUNE - 411 030
Estimated costRs 2.05 cr
Cost incurredRs 70.53 lakh
Work done34.39%
BuildingWingEstimatedIncurred
Aarohan ResidencyNARs 1.88 crRs 70.53 lakh
-NARs 16.98 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHAWAL DESHMUKH
EngineerRohinee Badgujar
EngineerRupesh Uttam Gujar
Chartered AccountantMr Eknath Agale
Chartered AccountantSHIVRAJ JAGTAP
Chartered AccountantS C BATHIYA
PartnerRole in project
Narayan Shinde-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23042620703Jun 2026 → Dec 2027

Reason as filed by the promoterWe had completed 50% of Project Development. The project is delayed because of delay in approvals from local authorities and approving authorities. Now all technical issues are resolved and we will get remaining approvals soon. We need time to complete project and complete handover process. We had informed the situations to customers and they had given us consent.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf16 Jul 2026
Withdrawal Update Form 3File: Q1 FORM-3 GS DEVELOPERS.pdf16 Jul 2026
Withdrawal Update Form 1File: Form 1 s.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf22 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 (12).pdf5 Feb 2026
Withdrawal Update Form 1File: WITHDRAWAL APP FORM 1.pdf24 Jan 2026
Withdrawal Update Form 2File: WITHDRWAL APP FORM 2.pdf24 Jan 2026
Withdrawal Update Form 3File: WITHDRWAL APP FORM 3.pdf24 Jan 2026
Withdrawal Update Form 1File: signed form 1.pdf2 Dec 2025
Withdrawal Update Form 2File: signed Form 2.pdf2 Dec 2025
Withdrawal Update Form 3File: 9ed6684b-9446-46a9-948e-27aab52e7b30.pdf2 Dec 2025
Form 5 (FY 2023-2024)File: FY 2023-24 form5 (1).pdf22 Nov 2025
Form 1File: Aarohan Residency Form 1 Sep 2025.pdf17 Oct 2025
Form 2File: Aarohan Residency Form 2 Sep 2025 (1).pdf17 Oct 2025
Form 3File: Aarohan Residency Form 3 Sep 2025.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Aarohan Residency Sold Unsold Sep 2025.pdf17 Oct 2025
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf23 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf23 Sep 2025
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf23 Sep 2025
Form 1File: FORM 1.pdf18 Sep 2025
Form 2File: FORM 2.pdf18 Sep 2025
Form 3File: Q4 FORM 3 (2).pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf18 Sep 2025
Form 1File: F1 Dec 24 AR (1).pdf18 Sep 2025
Form 2File: FORM 2.pdf18 Sep 2025
Form 3File: FORM 3.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD CIRCULAR 29 (5) (1).pdf18 Sep 2025
Form 1File: F1 DEC 23 AR (1).pdf18 Sep 2025
Form 2File: F2 DEC 23 AR (1).pdf18 Sep 2025
Form 3File: G S Devlopers scan form 3 Quarter Dec 2023 (1)_11zon.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf18 Sep 2025
Form 1File: FORM 1.pdf14 Aug 2025
Form 2File: FORM 2.pdf14 Aug 2025
Form 3File: FORM 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf14 Aug 2025
Form 1File: FORM 1.pdf14 Aug 2025
Form 2File: FORM 2.pdf14 Aug 2025
Form 3File: F3 MAR 24 (1).pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf14 Aug 2025
Form 1File: F1 SEP 24 AR (1).pdf14 Aug 2025
Form 2File: FORM 2.pdf14 Aug 2025
Form 3File: F3 SEP 24 AR (1).pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf14 Aug 2025
Form 1File: F1 JUN 25 AR (1).pdf11 Aug 2025
Form 2File: F2 JUN 25.pdf11 Aug 2025
Form 3File: FORM 3 (27).pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold (6).pdf11 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS DEVELPERS FORM 03-MARCH 25 (1).pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS DEVELPERS FORM 03-MARCH 25 (1).pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: aarohan sold unsold.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AAROHAN Re (1).pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AROHAN RESIDENCY MARCH 2025 (1).pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AROHAN Form 3.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arohan Residency Form 2 Sep (1).pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arohan Residency Form 2 Sep (2).pdf14 Nov 2024
Disclosure of sold/ booked inventoryFile: sold Unsold inventory (2).pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed F1.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed form 1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed f2.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed Form 2.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: signed sold unsold.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: signed sold unsold.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed f3_compressed (1).pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed form 3 _compressed.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed form 1.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: 1 a Details of encumbrances concerned to Finance (26) (1).pdf6 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Tabular Deviation of Agreement.pdf26 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Validation mail Narayan shinde.pdf22 Sep 2023
Other - LegalFile: Convayance Deed_11zon.pdf20 Sep 2023
Other - LegalFile: Gift Deed_11zon.pdf20 Sep 2023
Other - LegalFile: Landowners Declaraton.pdf20 Sep 2023

How this compares with Pune

21%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aarohan Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmAarohan ResidencyCompleted 42Lapsed / revoked 29Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: G S Developers

G.S. DEVELOPERS has 4 registrations on MahaRERA, including PLLATINUM AURA and Aarohan Residency. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Aarohan Residency is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aarohan Residency?

The registered promoter entity is G S Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aarohan Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aarohan Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aarohan Residency?

The professionals named in the filing: Architect: DHAWAL DESHMUKH; Engineer: Rohinee Badgujar; Engineer: Rupesh Uttam Gujar; Chartered Accountant: Mr Eknath Agale; Chartered Accountant: SHIVRAJ JAGTAP; Chartered Accountant: S C BATHIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aarohan Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aarohan Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aarohan Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.