Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AARAMBH CITY 2 is a Plotted project by AARAMBH BUILDERS AND DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500047960 on 2 Dec 2022. Possession is promised by 13 Oct 2027. 23 of the 29 units on this registration are recorded sold or booked.
At a glance
Project
- NameAARAMBH CITY 2
- TypePlotted
- Location
- KHASRA NO 21 (PART)
- P H NO 38
- MOUZA SHANKARPUR
- NAGPUR GRAMIN
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500047960
- ReraGenie IDRG-MH-35932
Builder
- NameAARAMBH BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersSHANKAR VITTHALRAO THAKRE, SANKET SHANKARRAO THAKRE
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Dec 2022
- Promised completion13 Oct 2027
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed85 files
Current status
Figures as on 11 May 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 80.87 lakh | Rs 80.20 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UMESH LAMGE |
| Architect | JIGNESH PATEL |
| Engineer | mahendra bhandari |
| Engineer | VIJAY PARADKAR |
| Chartered Accountant | RANJEET MISHRA & COMPANY |
| Chartered Accountant | ANJALI DIVECHA |
| Chartered Accountant | SAMEER DIVECHA |
| Partner | Role in project |
|---|---|
| AARAMBH BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 13 Oct 2027
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: arc cert mrh 26.pdf | 11 May 2026 |
| Withdrawal Update Form 2File: eng cr mrch 26.pdf | 11 May 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE FORM 3.pdf | 11 May 2026 |
| Withdrawal Update Form 1File: FORM 1 SEPT 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: form 1 dec 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 SEP25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 DEC 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: CA CERTI sys (2).pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: CA CERIFICATE DEC-25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: Jun 2025 Arccertificate.pdf | 5 Dec 2025 |
| Withdrawal Update Form 2File: jun 2025 Eng certificate.pdf | 5 Dec 2025 |
| Withdrawal Update Form 3File: CA CERTI sys (2).pdf | 5 Dec 2025 |
| Form 2A (FY 2022-2023)File: AARAMBH 22-23.pdf | 15 Oct 2025 |
| Form 2A (FY 2023-2024)File: AARAMBH 23-24.pdf | 15 Oct 2025 |
| Form 2A (FY 2024-2025)File: AARAMBH 24-25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: arc mar 25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 2File: eng mar 25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE AARAMBH MARCH-25.pdf | 20 Aug 2025 |
| Form 5 (FY 2022-2023)File: FORM 5 AARAMBH 22-23.pdf | 19 Aug 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 AARAMBH 23-24.pdf | 19 Aug 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 AARAMBH 24-25.pdf | 19 Aug 2025 |
| Form 1File: arch 30 jun24.pdf | 13 Aug 2025 |
| Form 2File: eng cer june 24.pdf | 13 Aug 2025 |
| Form 3File: CA CERTIFICATE AARAMBH JUN-24.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold june 24 EDIT.pdf | 13 Aug 2025 |
| Form 1File: arc sep 24.pdf | 13 Aug 2025 |
| Form 2File: sep 24 eng.pdf | 13 Aug 2025 |
| Form 3File: CA CERTIFICATE AARAMBH SEP-24.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold sept 24 EDIT.pdf | 13 Aug 2025 |
| Form 1File: arch dec 24.pdf | 13 Aug 2025 |
| Form 2File: eng dec 24.pdf | 13 Aug 2025 |
| Form 3File: CA CERTIFICATE AARAMBH DEC-24.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold dec 24 EDIT.pdf | 13 Aug 2025 |
| Form 1File: arc mar 25.pdf | 13 Aug 2025 |
| Form 2File: eng mar 25.pdf | 13 Aug 2025 |
| Form 3File: CA CERTIFICATE AARAMBH MARCH-25.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold march 25 EDIT.pdf | 13 Aug 2025 |
| Form 1File: 31-12-22 arch.pdf | 12 Aug 2025 |
| Form 2File: 31-12-2022 eng.pdf | 12 Aug 2025 |
| Form 3File: CA CERTIFICATE DEC-22.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD DEC-22.pdf | 12 Aug 2025 |
| Form 1File: 31-03-2023 ARCH.pdf | 12 Aug 2025 |
| Form 2File: 31-03-2023 eng.pdf | 12 Aug 2025 |
| Form 3File: CA CERTIFICATE MARCH-23.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD MARCH-23.pdf | 12 Aug 2025 |
| Form 1File: 30-06-2023 arch.pdf | 12 Aug 2025 |
| Form 2File: 30-06-2023 eng.pdf | 12 Aug 2025 |
| Form 3File: CA CERTIFICATE JUNE-23.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD JUNE-23.pdf | 12 Aug 2025 |
| Form 1File: 30-09-2023 arch.pdf | 12 Aug 2025 |
| Form 2File: 30-09-2023 eng.pdf | 12 Aug 2025 |
| Form 3File: CA CERTIFICATE SEP-23.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD SEP-23.pdf | 12 Aug 2025 |
| Form 1File: 31-12-2023 arch.pdf | 12 Aug 2025 |
| Form 2File: 31-12-2023 eng.pdf | 12 Aug 2025 |
| Form 3File: CA CERTIFICATE DEC-23.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD DEC-23.pdf | 12 Aug 2025 |
| Form 1File: 31-03-2024 arch.pdf | 12 Aug 2025 |
| Form 2File: 31-03-2024 eng.pdf | 12 Aug 2025 |
| Form 3File: ca cert mar 24.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD MARCH-24.pdf | 12 Aug 2025 |
| Copy of the legal title reportFile: Title Search Report.pdf | 25 Nov 2022 |
| Copy of the legal title reportFile: Seven By Twelve Extract.pdf | 25 Nov 2022 |
| Other - LegalFile: NA_Orderr.pdf | 25 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: Model Fomrat of Agreement to Sale.pdf | 16 Nov 2022 |
| Declaration in FORM BFile: Form B.pdf | 29 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf | 18 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 18 Oct 2022 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 18 Oct 2022 |
| Proforma of Agreement for saleFile: Format of Allotement Letter.pdf | 18 Oct 2022 |
| Proforma of Allotment letterFile: Format of Allotement Letter.pdf | 18 Oct 2022 |
| Layout approvalFile: Layout MAP.pdf | 14 Oct 2022 |
| Building plan approval or NA orderFile: NA Order.pdf | 14 Oct 2022 |
| PAN CardFile: PAN_Firm.pdf | 14 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: Declaration ASbout Encumbrance And Litigation.pdf | 14 Oct 2022 |
| Details of encumbrances concerned to LegalFile: Declaration ASbout Encumbrance And Litigation.pdf | 14 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: Layout MAP.pdf | 14 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf | 14 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf | 14 Oct 2022 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf | 14 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AARAMBH CITY 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near P H NO 38, MOUZA SHANKARPUR, NAGPUR GRAMIN2,800+ in Nagpur
Filed coordinates, straight-line distance. 112 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: AARAMBH BUILDERS AND DEVELOPERS
AARAMBH BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including AARAMBH CITY 2 and Aarambh Galaxy. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if AARAMBH CITY 2 is delayed beyond 13 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AARAMBH CITY 2?
The registered promoter entity is AARAMBH BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AARAMBH CITY 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AARAMBH CITY 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AARAMBH CITY 2?
The professionals named in the filing: Architect: UMESH LAMGE; Architect: JIGNESH PATEL; Engineer: mahendra bhandari; Engineer: VIJAY PARADKAR; Chartered Accountant: RANJEET MISHRA & COMPANY; Chartered Accountant: ANJALI DIVECHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AARAMBH CITY 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback