AARAMBH CITY 2

By AARAMBH BUILDERS AND DEVELOPERS

RG-MH-35932 · RERA P50500047960 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedno revision filed
6 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

AARAMBH CITY 2 is a Plotted project by AARAMBH BUILDERS AND DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500047960 on 2 Dec 2022. Possession is promised by 13 Oct 2027. 23 of the 29 units on this registration are recorded sold or booked.

At a glance

Project

  • NameAARAMBH CITY 2
  • TypePlotted
  • Location
    • KHASRA NO 21 (PART)
    • P H NO 38
    • MOUZA SHANKARPUR
    • NAGPUR GRAMIN
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500047960
  • ReraGenie IDRG-MH-35932

Builder

  • NameAARAMBH BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersSHANKAR VITTHALRAO THAKRE, SANKET SHANKARRAO THAKRE
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2022PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Dec 2022
  • Promised completion13 Oct 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed85 files

Current status

79%23 of 29 units booked
99.2%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,174 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Aug 2025

Approvals and building plan

Sanctioning authorityNMRDA
Permissible FSI6823.25
Proposed, not sanctioned6,823 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHUDKESHWAR
Estimated costRs 80.87 lakh
Cost incurredRs 80.20 lakh
Work done99.17%
BuildingWingEstimatedIncurred
-NARs 80.87 lakhRs 80.20 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH LAMGE
ArchitectJIGNESH PATEL
Engineermahendra bhandari
EngineerVIJAY PARADKAR
Chartered AccountantRANJEET MISHRA & COMPANY
Chartered AccountantANJALI DIVECHA
Chartered AccountantSAMEER DIVECHA
PartnerRole in project
AARAMBH BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 13 Oct 2027

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: arc cert mrh 26.pdf11 May 2026
Withdrawal Update Form 2File: eng cr mrch 26.pdf11 May 2026
Withdrawal Update Form 3File: CA CERTIFICATE FORM 3.pdf11 May 2026
Withdrawal Update Form 1File: FORM 1 SEPT 25.pdf4 Mar 2026
Withdrawal Update Form 1File: form 1 dec 25.pdf4 Mar 2026
Withdrawal Update Form 2File: FORM 2 SEP25.pdf4 Mar 2026
Withdrawal Update Form 2File: FORM 2 DEC 25.pdf4 Mar 2026
Withdrawal Update Form 3File: CA CERTI sys (2).pdf4 Mar 2026
Withdrawal Update Form 3File: CA CERIFICATE DEC-25.pdf4 Mar 2026
Withdrawal Update Form 1File: Jun 2025 Arccertificate.pdf5 Dec 2025
Withdrawal Update Form 2File: jun 2025 Eng certificate.pdf5 Dec 2025
Withdrawal Update Form 3File: CA CERTI sys (2).pdf5 Dec 2025
Form 2A (FY 2022-2023)File: AARAMBH 22-23.pdf15 Oct 2025
Form 2A (FY 2023-2024)File: AARAMBH 23-24.pdf15 Oct 2025
Form 2A (FY 2024-2025)File: AARAMBH 24-25.pdf15 Oct 2025
Withdrawal Update Form 1File: arc mar 25.pdf20 Aug 2025
Withdrawal Update Form 2File: eng mar 25.pdf20 Aug 2025
Withdrawal Update Form 3File: CA CERTIFICATE AARAMBH MARCH-25.pdf20 Aug 2025
Form 5 (FY 2022-2023)File: FORM 5 AARAMBH 22-23.pdf19 Aug 2025
Form 5 (FY 2023-2024)File: FORM 5 AARAMBH 23-24.pdf19 Aug 2025
Form 5 (FY 2024-2025)File: FORM 5 AARAMBH 24-25.pdf19 Aug 2025
Form 1File: arch 30 jun24.pdf13 Aug 2025
Form 2File: eng cer june 24.pdf13 Aug 2025
Form 3File: CA CERTIFICATE AARAMBH JUN-24.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold june 24 EDIT.pdf13 Aug 2025
Form 1File: arc sep 24.pdf13 Aug 2025
Form 2File: sep 24 eng.pdf13 Aug 2025
Form 3File: CA CERTIFICATE AARAMBH SEP-24.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold sept 24 EDIT.pdf13 Aug 2025
Form 1File: arch dec 24.pdf13 Aug 2025
Form 2File: eng dec 24.pdf13 Aug 2025
Form 3File: CA CERTIFICATE AARAMBH DEC-24.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold dec 24 EDIT.pdf13 Aug 2025
Form 1File: arc mar 25.pdf13 Aug 2025
Form 2File: eng mar 25.pdf13 Aug 2025
Form 3File: CA CERTIFICATE AARAMBH MARCH-25.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold march 25 EDIT.pdf13 Aug 2025
Form 1File: 31-12-22 arch.pdf12 Aug 2025
Form 2File: 31-12-2022 eng.pdf12 Aug 2025
Form 3File: CA CERTIFICATE DEC-22.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: BOOK SOLD DEC-22.pdf12 Aug 2025
Form 1File: 31-03-2023 ARCH.pdf12 Aug 2025
Form 2File: 31-03-2023 eng.pdf12 Aug 2025
Form 3File: CA CERTIFICATE MARCH-23.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: BOOK SOLD MARCH-23.pdf12 Aug 2025
Form 1File: 30-06-2023 arch.pdf12 Aug 2025
Form 2File: 30-06-2023 eng.pdf12 Aug 2025
Form 3File: CA CERTIFICATE JUNE-23.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: BOOK SOLD JUNE-23.pdf12 Aug 2025
Form 1File: 30-09-2023 arch.pdf12 Aug 2025
Form 2File: 30-09-2023 eng.pdf12 Aug 2025
Form 3File: CA CERTIFICATE SEP-23.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: BOOK SOLD SEP-23.pdf12 Aug 2025
Form 1File: 31-12-2023 arch.pdf12 Aug 2025
Form 2File: 31-12-2023 eng.pdf12 Aug 2025
Form 3File: CA CERTIFICATE DEC-23.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: BOOK SOLD DEC-23.pdf12 Aug 2025
Form 1File: 31-03-2024 arch.pdf12 Aug 2025
Form 2File: 31-03-2024 eng.pdf12 Aug 2025
Form 3File: ca cert mar 24.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: BOOK SOLD MARCH-24.pdf12 Aug 2025
Copy of the legal title reportFile: Title Search Report.pdf25 Nov 2022
Copy of the legal title reportFile: Seven By Twelve Extract.pdf25 Nov 2022
Other - LegalFile: NA_Orderr.pdf25 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Model Fomrat of Agreement to Sale.pdf16 Nov 2022
Declaration in FORM BFile: Form B.pdf29 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf18 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf18 Oct 2022
CERSAI detailsFile: CERSAI Search Report.pdf18 Oct 2022
Proforma of Agreement for saleFile: Format of Allotement Letter.pdf18 Oct 2022
Proforma of Allotment letterFile: Format of Allotement Letter.pdf18 Oct 2022
Layout approvalFile: Layout MAP.pdf14 Oct 2022
Building plan approval or NA orderFile: NA Order.pdf14 Oct 2022
PAN CardFile: PAN_Firm.pdf14 Oct 2022
Details of encumbrances concerned to FinanceFile: Declaration ASbout Encumbrance And Litigation.pdf14 Oct 2022
Details of encumbrances concerned to LegalFile: Declaration ASbout Encumbrance And Litigation.pdf14 Oct 2022
Copy of Layout Approval (in case of layout)File: Layout MAP.pdf14 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf14 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf14 Oct 2022
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf14 Oct 2022

How this compares with Nagpur

79%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARAMBH CITY 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near P H NO 38, MOUZA SHANKARPUR, NAGPUR GRAMIN2,800+ in Nagpur

2 kmAARAMBH CITY 2Completed 42Lapsed / revoked 19Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 112 registered projects within 2 km.

Builder: AARAMBH BUILDERS AND DEVELOPERS

AARAMBH BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including AARAMBH CITY 2 and Aarambh Galaxy. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if AARAMBH CITY 2 is delayed beyond 13 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARAMBH CITY 2?

The registered promoter entity is AARAMBH BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARAMBH CITY 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARAMBH CITY 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARAMBH CITY 2?

The professionals named in the filing: Architect: UMESH LAMGE; Architect: JIGNESH PATEL; Engineer: mahendra bhandari; Engineer: VIJAY PARADKAR; Chartered Accountant: RANJEET MISHRA & COMPANY; Chartered Accountant: ANJALI DIVECHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARAMBH CITY 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARAMBH CITY 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARAMBH CITY 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.