Home / Browse projects / Nashik, Maharashtra / AARADHY CLASSIC BUILDING NO.2

Registered No litigation declared Residential / Group Housing project

AARADHY CLASSIC BUILDING NO.2

By SIDDHI CORPORATION

RG-MH-96364 · RERA P51600055370 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedno revision filed
5 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 1%
49 of 77Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

AARADHY CLASSIC BUILDING NO.2 is a Residential / Group Housing project by SIDDHI CORPORATION in Nashik, Maharashtra, registered with MahaRERA as P51600055370 on 22 Mar 2024. Possession is promised by 15 Oct 2028. 28 of the 77 units on this registration are recorded sold or booked, and 5 of 33 construction stages are filed complete.

At a glance

Project

  • NameAARADHY CLASSIC BUILDING NO.2
  • TypeResidential / Group Housing
  • Location
    • OLD SAIKHEDA ROAD
    • RAJARAM NAGAR
    • Jail Road
    • Nashik
    • 422101
  • Pincode422101
  • RERA no.P51600055370
  • ReraGenie IDRG-MH-96364

Builder

  • NameSIDDHI CORPORATION
  • Entity typePartnership
  • PartnersSHARAD WAMAN ADHAV, MANIK RAJARAM HANDGE, RAM MOTIRAM ADHAV
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2024PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Mar 2024
  • Promised completion15 Oct 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed85 files

Current status

36%28 of 77 units booked
52.6%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA90161935
WING BNA9026026
WING CNA9016016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 1%.

WING A46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered2
Open Space12
BuildingClosed/CoveredOpen SpaceTotal
WING A167
WING B167

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,543 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNASHIK MUNCIPAL CORPORATION
Permissible FSI5542.85
Proposed, not sanctioned5,543 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAUBHAGYA NAGAR LAM ROAD NASHIK 422401
Estimated costRs 9.05 cr
Cost incurredRs 4.76 cr
Work done52.59%
BuildingWingEstimatedIncurred
WING ANARs 9.05 crRs 4.76 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDINESH R UGHAADE UGHAADE
EngineerMILIND RATHI RATHI
Chartered AccountantSANTOSH NAMDEV KASAR
PartnerRole in project
SIDDHI CORPORATION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Oct 2028

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM1ARCHCERTIFICATE.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2 ENGG CERTIFICATE.pdf30 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf30 Apr 2026
Form 1File: ARCHITEC CERTIFICATE.pdf10 Feb 2026
Form 2File: ENGG CERTIFICATE.pdf10 Feb 2026
Form 3File: CA CERTIFICATE.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf10 Feb 2026
Form 1File: FORM 1 ARCHITECT 30092025.pdf25 Nov 2025
Form 2File: FORM 2 ENGINEER 30092025.pdf25 Nov 2025
Form 3File: FORM 3 CA CERTI 30092025.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf25 Nov 2025
Form 3File: CA CERTIFICATE.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf29 Jul 2025
Form 1File: Architect's Certificate.pdf29 Jul 2025
Form 2File: Engineer's Certificate.pdf29 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf25 Jul 2025
Form 2File: ENGINEER CERTIFICATE.pdf25 Jul 2025
Form 3File: CA CERTIFICATE.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf25 Jul 2025
Form 1File: ARCHITECT CERTIFICATE 31122024.pdf25 Jul 2025
Form 2File: ENGINEER CERTIFICATE 31122024.pdf25 Jul 2025
Form 3File: CA CERTIFICATE 31122024.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf25 Jul 2025
Form 1File: ARCH CERTIFICATE.pdf25 Jul 2025
Form 2File: FORM 2.pdf25 Jul 2025
Form 3File: CA CERTIFICATE.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf25 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf25 Jul 2025
Form 2File: ENGINEER CERTIFICATE1.pdf25 Jul 2025
Form 3File: FORM 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf25 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf25 Jul 2025
Form 2File: ENGINEER CERTIFICATE1.pdf25 Jul 2025
Form 3File: CA CERTIFICATE.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31122024.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31122024.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31122024.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf25 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE1.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE1.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf15 Apr 2024
Other - TechnicalFile: PLAN FINAL.pdf12 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE1.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXA.pdf28 Feb 2024
Proforma of Agreement for saleFile: ANNEXUTE A.pdf21 Feb 2024
Other - TechnicalFile: ANNEXUTE A.pdf6 Feb 2024
Details of encumbrances concerned to FinanceFile: legal encumbrance report.pdf5 Feb 2024
Details of encumbrances concerned to LegalFile: legal encumbrance report.pdf5 Feb 2024
Proforma of Agreement for saleFile: AGREEMENT DRAFT 02.pdf5 Feb 2024
Other - LegalFile: PLOT AGREEMENT.pdf5 Feb 2024
Other - LegalFile: PLOT NO 18 AND 19.pdf5 Feb 2024
Other - LegalFile: 7-12.pdf5 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK AC.pdf30 Jan 2024
Building plan approvalFile: PLAN.pdf23 Jan 2024
Building plan approvalFile: PLAN2.pdf23 Jan 2024
Layout approvalFile: LAYOUT PLAN.pdf23 Jan 2024
Building plan approvalFile: PLAN3.pdf23 Jan 2024
Building plan approvalFile: PLAN.pdf23 Jan 2024
PAN CardFile: FIRM PAN.pdf23 Jan 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf23 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN2.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN3.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf23 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Jan 2024
Declaration about Commencement CertificateFile: DECLARATION FOR COMMENCEMENT.pdf23 Jan 2024
Declaration in FORM BFile: AFFIDAVIT.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICARTE.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf23 Jan 2024
CERSAI detailsFile: CERSAI Search Report.pdf23 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SIDDHI HIGHITSDASAK JAIL ROAD NASHIK ROAD NASHIK22CompletedAug 2014Aug 2014

How this compares with Nashik

36%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARADHY CLASSIC BUILDING NO.2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAJARAM NAGAR4,100+ in Nashik

Builder: SIDDHI CORPORATION

SIDDHI CORPORATION has 1 registration on MahaRERA, including AARADHY CLASSIC BUILDING NO.2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if AARADHY CLASSIC BUILDING NO.2 is delayed beyond 15 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARADHY CLASSIC BUILDING NO.2?

The registered promoter entity is SIDDHI CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARADHY CLASSIC BUILDING NO.2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARADHY CLASSIC BUILDING NO.2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARADHY CLASSIC BUILDING NO.2?

The professionals named in the filing: Architect: DINESH R UGHAADE UGHAADE; Engineer: MILIND RATHI RATHI; Chartered Accountant: SANTOSH NAMDEV KASAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARADHY CLASSIC BUILDING NO.2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARADHY CLASSIC BUILDING NO.2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARADHY CLASSIC BUILDING NO.2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.