Home / Browse projects / Nashik, Maharashtra / AARADHANA RESIDENCY - A
AARADHANA RESIDENCY - A
By A C JAIN BUILDERS AND DEVELOPERS LLP
RG-MH-13328 · RERA P51600025195 · Last updated on MahaRERA portal: 8 May 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 8 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AARADHANA RESIDENCY - A is a Residential / Group Housing project by A C JAIN BUILDERS AND DEVELOPERS LLP in Nashik, Maharashtra, registered with MahaRERA as P51600025195 on 23 Mar 2020. The registration is recorded completed; possession was promised by 8 Aug 2023. The completion date has moved by 8 months from the original filing.
At a glance
Project
- NameAARADHANA RESIDENCY - A
- TypeResidential / Group Housing
- Location
- SHIVAM COLONY
- ARTILLERY CENTER ROAD
- NASIKROAD
- OPP GOPAL NAGAR
- Deolaligaon
- Nashik
- 422101
- Pincode422101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600025195
- ReraGenie IDRG-MH-13328
Builder
- NameA C JAIN BUILDERS AND DEVELOPERS LLP
- Entity typePartnership
- GSTIN27ABOFA9179M1ZH
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnerVIDHYA ABHAY JAIN TODARWAL
- Other registrations7 more →
- Completed3 of 8
- Past their filed date1
- Declared earlier projects11 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Mar 2020
- Promised completion8 Aug 2023
- Revised completionRevised to 8 Aug 2023 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed117 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AARADHANA RESIDENCY - A - A B and C WING | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
AARADHANA RESIDENCY - A - A B and C WING: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed60
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| NILKANTH GOPAL CHANDRATRE HUF | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NIKI ASSOCIATES |
| Engineer | SANJAY SHRIRAM PATIL |
| Chartered Accountant | KPN AND CO |
| Partner | Role in project |
|---|---|
| A C JAIN BUILDERS AND DEVELOPERS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. We have completed the said project and obtained full occupancy certificate from Nashik Municipal Corporation dated 08.08.2023. The copy of the same is uploaded on RERA portal under the tab “Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development” 2. Since the project completion date on RERA portal is 30.12.2022, we are applying for post facto extension of project completion date i.e., the date of full occupancy certificate. 3. We have done all the compliances due till the date of occupancy certificate. We request you to kindly consider ou
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 49/2018 | NASIK | CASE GOING ON |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Mar 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Sep 2023
Documents filed117
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Aug 23.pdf | 8 May 2026 |
| Form 2File: Form 2 - Aug 23.pdf | 8 May 2026 |
| Form 3File: Form 3 - Aug 23.pdf | 8 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory - Aug 23.pdf | 8 May 2026 |
| Form 1File: Form 1 - March 23.pdf | 8 May 2026 |
| Form 2File: Form 2 - March 23.pdf | 8 May 2026 |
| Form 3File: Form 3 - March 23.pdf | 8 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory - March 23.pdf | 8 May 2026 |
| Declaration about Commencement CertificateFile: Declaration for Commencment Certificate (1).pdf | 21 Mar 2025 |
| Declaration in FORM BFile: Form B.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A F Y 22-23.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate-F Y 23-24.pdf | 19 Mar 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4-A.pdf | 1 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Aaradhana Residency - A.pdf | 21 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Aaradhana Residency A.pdf | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Aaradhana Residency - A.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Architect Certificate_Aradhana A_June 23.pdf | 16 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Architect Certificate_Aradhana A_Aug 23.pdf | 16 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer Certificate_Aradhana A_June 23.pdf | 16 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer Certificate_Aradhana A_August 23.pdf | 16 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaradhana A - CA Certificate June 23.pdf | 16 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaradhana A -CA Certificate August 23.pdf | 16 Sep 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE.pdf | 16 Sep 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 9217 - Apt Decleration Aradhana Residency A.pdf | 16 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect Certificate_Aradhana A_June 22.pdf | 8 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect Certificate_Aradhana A_Sept 22.pdf | 8 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect Certificate_Aradhana A_Dec 22.pdf | 8 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect Certificate_Aradhana A_Mar 23.pdf | 8 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate_Aradhana A_June 22.pdf | 8 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate_Aradhana A_Sept 22.pdf | 8 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer Certificate_Aradhana A_Dec 22.pdf | 8 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer Certificate_Aradhana A_March 23.pdf | 8 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate_June 22_Aaradhana A.pdf | 8 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate_Sept 22_Aaradhana A.pdf | 8 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate_Dec 22_Aaradhana A.pdf | 8 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate_March 23_Aaradhana A.pdf | 8 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_MAR 20.pdf | 29 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate_MAR 20.pdf | 29 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect Certificate_MAR21.pdf | 29 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Certificate_ Jun 21.pdf | 29 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect Certificate_Sept 21.pdf | 29 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect Certificate_Dec 21.pdf | 29 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect Certificate_Mar22.pdf | 29 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate_march 20_Aradhana A.pdf | 29 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate_march 21_Aradhana A.pdf | 29 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate_June 21_Aradhana A.pdf | 29 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate_Sept 21_Aradhana A.pdf | 29 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certificate_Dec 21_Aaradhana A.pdf | 29 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA Certificate_March 22_Aaradhana A.pdf | 29 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RA_Aaradhana A_signed_19 20.pdf | 25 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RA_Aaradhana A_signed_20 21.pdf | 25 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RA_Aaradhana A_signed_21 22.pdf | 25 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate_Aradhana A _ March 20.pdf | 24 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate_Aradhana A _ March 21.pdf | 24 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer Certificate_Aradhana A _ June 21.pdf | 24 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer Certificate_Aradhana A _ Sept 21 .pdf | 24 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer Certificate_Aradhana A_dec21.pdf | 24 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer Certificate_Aradhana A_March 22.pdf | 24 May 2023 |
| Other - TechnicalFile: Quality Assurance Certificate Form 2A- Aaradhana Residency - A.pdf | 6 May 2023 |
| Disclosure of sold/ booked inventoryFile: Mar 23.pdf | 14 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: ENC - RA.pdf | 8 Feb 2023 |
| Details of encumbrances concerned to LegalFile: ENC - RA.pdf | 8 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Dec21.pdf | 8 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mar22.pdf | 8 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Jun22.pdf | 8 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sep22.pdf | 8 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Dec22.pdf | 8 Feb 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200259831358_For_Asset_Based_Search_08_02_2023_13_38_47_049.pdf | 8 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sep 21.pdf | 8 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Dec 21.pdf | 8 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Mar 22.pdf | 8 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Jun 22.pdf | 8 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sep 22.pdf | 8 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Dec 22.pdf | 8 Feb 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf | 8 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Accountstmt_50200051216203_03112022120611.PDF | 8 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: resi a.pdf | 18 Nov 2022 |
| Details of encumbrancesFile: ENC - RA.pdf | 28 Apr 2022 |
| Details of encumbrancesFile: Binder1-8.pdf | 22 Apr 2022 |
| Details of encumbrancesFile: Binder 9-14.pdf | 22 Apr 2022 |
Promoter's earlier projects11
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Abhinav | S. No. G. No. 87 1 2 11 3 of Deolali Shiwar Nashik - 422101 | 78 | - | Ongoing | Dec 2026 | Dec 2026 |
| AARADHYA RESIDENCY PHASE II | S NO 31 2 1 19 Nashik Maharashtra | 63 | - | Ongoing | Dec 2026 | Dec 2026 |
| ARADHANA ENCLAVE | S NO 40 8 9 10 PLOT NO 4 Nashik Maharashtra | 14 | - | Ongoing | Dec 2025 | Dec 2025 |
| ARRPAN HOUSINGP51600022627 | VIHITGAON, Nashik | 415 | Oct 2019 | Completed | Apr 2025 | Jun 2024 |
| AARADHANA RESIDENCY - A | S no - 39 6 40 6 7 2 3 - Plot No 25 to 46 Nashik Maharashtra | 84 | - | Completed | Dec 2022 | Dec 2022 |
| AARADHANA RESIDENCY - B | S NO - 39 6 40 6 7 2 3 PLOT NO 62 65 Nashik Maharashtra | 16 | - | Completed | Dec 2022 | Dec 2022 |
| AARADHANA VILLAS | 39 6 40 6 7 2 3 Nashik Maharashtra | 13 | - | Completed | Dec 2020 | Dec 2020 |
| ABHINANDAN HEIGHTS | ANUSAYA NAGAR NEAR MHADA BUILDINGS MAKHMALABAD NASIK | 48 | - | Completed | Jun 2019 | Late, Jul 2019 |
| KAPALESHWAR CO OP HSG SOCIETY | OPP SURANA HOSPITAL ARTILLERY CENTER ROAD NASIKROAD | 38 | - | Completed | Mar 2019 | Mar 2019 |
| AARADHYA RESIDENCY | A WING OPP JADHAV HOSPITAL JAGTAP MALA ANAND NAGAR NASIKROAD | 45 | - | Completed | Jun 2018 | May 2018 |
| AANUSHREE RESIDENCY | PLOT NO 1 TO 8 BEHIND KAMAL AUTO ASHOKA MARG OPP ASHOKA SCHOOL NASIK | 53 | - | Completed | Mar 2018 | Late, May 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 117 filed documents as one ZIP, foldered, with a manifest
Keep AARADHANA RESIDENCY - A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OPP GOPAL NAGAR4,100+ in Nashik
Filed coordinates, straight-line distance. 75 registered projects within 2 km.
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: A C JAIN BUILDERS AND DEVELOPERS LLP
A C JAIN BUILDERS AND DEVELOPERS LLP has 8 registrations on MahaRERA, including ARRPAN HOUSING and AARADHANA RESIDENCY - A. Its filings disclose 11 earlier MahaRERA projects: declares 9 of 11 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if AARADHANA RESIDENCY - A is delayed beyond 8 Aug 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AARADHANA RESIDENCY - A?
The registered promoter entity is A C JAIN BUILDERS AND DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27ABOFA9179M1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AARADHANA RESIDENCY - A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AARADHANA RESIDENCY - A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AARADHANA RESIDENCY - A?
The professionals named in the filing: Architect: NIKI ASSOCIATES; Engineer: SANJAY SHRIRAM PATIL; Chartered Accountant: KPN AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AARADHANA RESIDENCY - A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.