Completed No litigation declared Residential / Group Housing project

AAKASH SRISHTHI

By AAKASH SRISHTHI CONSTRUCTION & A.J.CONSTRUCTION

RG-MH-28825 · RERA P51800027385 · Last updated on MahaRERA portal: 24 Feb 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2023Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

AAKASH SRISHTHI is a Residential / Group Housing project by AAKASH SRISHTHI CONSTRUCTION & A.J.CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027385 on 8 Dec 2020. The registration is recorded completed; possession was promised by 30 Oct 2023. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameAAKASH SRISHTHI
  • TypeResidential / Group Housing
  • Location
    • VILLAGE KONDAVITA
    • AT J.B.NAGAR
    • ANDHERI EAST
    • MUMBAI
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400093
  • Pincode400093
  • RERA no.P51800027385
  • ReraGenie IDRG-MH-28825

Builder

  • NameAAKASH SRISHTHI CONSTRUCTION & A.J.CONSTRUCTION
  • Entity typeOthers
  • PartnerBIPIN LAXMINARAYAN AGARWAL
  • Named personA. J. CONSTRUCTION

Key dates

this monthRegisteredDec 2020First promiseOct 2022Revised toOct 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Dec 2020
  • Promised completion30 Oct 2023
  • Revised completionRevised to 30 Oct 2023 (originally 30 Oct 2022)
  • Buildings2 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA120000
WING BNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered2
Open Space38
BuildingClosed/CoveredOpen SpaceTotal
WING A12021
WING B11819

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,340 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3613.44
Proposed, not sanctioned3,613 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch0588, CHAKALA BRANCH, APPLE HERITAGE, GROUND FLOOR, OPP SOLITAIRE CORPORATE PARK , ANDHERI EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRI ASHIM KHATRI
EngineerSHAH STRUCUTURAL PVT.LTD.
Chartered AccountantPARAG R NAKAR & ASSOCIATES
PartnerRole in project
AAKASH SRISHTHI CONSTRUCTION & A.J.CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012790Oct 2022 → Oct 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We request you to grant us extension for a period of one year, i.e., upto 30th October 2023.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Feb 2024

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2411588_OC_signed.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 12 22.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 03 23.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 06 23.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aakash Srushti as on June 2022.pdf22 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aakash Srishthi as on September 2022.pdf22 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Aakash Srishthi as on June 2022.pdf21 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Aakash Srishthi as on September 2022.pdf21 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- Aakash Srishthi as on 2021-22_compressed.pdf21 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aakash Srishthi Form 1- 6 October 2022.pdf13 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aakash Shrishti- March 2022.pdf20 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aakash Srishthi Form 3 as on 31st March 2022_compressed.pdf20 Sep 2022
Declaration about Commencement CertificateFile: Aakash Srishti Format D (32).pdf10 Jun 2022
Disclosure of sold/ booked inventoryFile: Aakash Srishti Circular 29_compressed.pdf10 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aakash Shrishti December 2021_compressed.pdf4 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aakash Srishthi Form 3 as on 31st Dec 2021 Final.pdf4 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AAKASH SRISHTHI FORM 1 ARCHITECT CERTIFICATE.pdf13 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AAKASH SRISHTHI FORM-2 Engineer Certificate.pdf13 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AAKASH SRISHTHI FORM-3 CA CERTIFICATE.pdf13 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: A J CONS AND AAKASH SRISHTHI FORM 5 2020-21.pdf30 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf30 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC Certificate Form 2_compressed.pdf30 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca aakash srishthi_compressed.pdf30 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf22 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC UPTO 10TH FLR.pdf4 Dec 2020
Declaration in FORM BFile: NEW FORM B.pdf4 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: 1444 - revalidation letter.pdf3 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: 1444 - Challan PAID ONLINE.pdf30 Nov 2020
PAN CardFile: A J Construction Pan Card.pdf18 Nov 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf13 Nov 2020
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf13 Nov 2020
OtherFile: Aakash Srishthi Rera Bank Account.pdf13 Nov 2020
OtherFile: A J Construction Rera Bank Account.pdf13 Nov 2020
Details of encumbrancesFile: ASC VS Subh Shankar Holding Suit No 209 of 2016.pdf9 Nov 2020
Details of encumbrancesFile: Aakash Sristhi VS Shubh Shankar Suit No 209 of 2016.pdf9 Nov 2020
Details of encumbrancesFile: Shubh Shankar VS Aakash Sristhi RAD Suit 684 of 2016.pdf9 Nov 2020
Building plan approvalFile: 1444 approved plan 1 AND 2 FLOOR.pdf6 Nov 2020
Building plan approvalFile: 3 4 5 6 8 to 10.pdf6 Nov 2020
Building plan approvalFile: 7th floor OK.pdf6 Nov 2020
Building plan approvalFile: SECTION DETAILS12345-compressed.pdf6 Nov 2020
Building plan approvalFile: CARPET AREA STATEMENT OK.pdf6 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: 1444 approved plan 1 AND 2 FLOOR.pdf6 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: 3 4 5 6 8 to 10.pdf6 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: 7th floor OK.pdf6 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: SECTION DETAILS12345-compressed.pdf6 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: CARPET AREA STATEMENT OK.pdf6 Nov 2020
Layout approvalFile: 1444 approved plan LAYOUT OK.pdf5 Nov 2020
PAN CardFile: Aakash Srishthi Construction Pan Card.pdf5 Nov 2020
Copy of the legal title reportFile: TITLE CLEARANCE CERTIFICATE.pdf5 Nov 2020
Copy of Layout Approval (in case of layout)File: 1444 approved plan LAYOUT OK.pdf5 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: 1444 - Revalidation.pdf5 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FORM 1.pdf5 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form No 2.pdf5 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA color-compressed.pdf5 Nov 2020

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AAKASH SRISHTHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI EAST, MUMBAI6,700+ in Mumbai Suburban

Builder: AAKASH SRISHTHI CONSTRUCTION & A.J.CONSTRUCTION

AAKASH SRISHTHI CONSTRUCTION & A.J.CONSTRUCTION has 1 registration on MahaRERA, including AAKASH SRISHTHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AAKASH SRISHTHI is delayed beyond 30 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AAKASH SRISHTHI?

The registered promoter entity is AAKASH SRISHTHI CONSTRUCTION & A.J.CONSTRUCTION, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AAKASH SRISHTHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AAKASH SRISHTHI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AAKASH SRISHTHI?

The professionals named in the filing: Architect: SHRI ASHIM KHATRI; Engineer: SHAH STRUCUTURAL PVT.LTD.; Chartered Accountant: PARAG R NAKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AAKASH SRISHTHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AAKASH SRISHTHI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AAKASH SRISHTHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.