Home / Browse projects / Pune, Maharashtra / AAIJI PINK CITY

Registration lapsed No litigation declared Residential / Group Housing project

AAIJI PINK CITY

By AAIJI REALTY

RG-MH-15446 · RERA P52100023905 · Last updated on MahaRERA portal: 11 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
27 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
39 of 108Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 258 documents Report an error

AAIJI PINK CITY is a Residential / Group Housing project by AAIJI REALTY in Pune, Maharashtra, registered with MahaRERA as P52100023905 on 10 Jan 2020. Possession was promised by 30 Mar 2026 and is now 7 months past that date. 69 of the 108 units on this registration are recorded sold or booked, and 27 of 33 construction stages are filed complete.

At a glance

Project

  • NameAAIJI PINK CITY
  • TypeResidential / Group Housing
  • Location
    • DHANORI LOHEGAON ROAD
    • SATHE VASTI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411047
  • Pincode411047
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023905
  • ReraGenie IDRG-MH-15446

Builder

  • NameAAIJI REALTY
  • Entity typePartnership
  • PartnerLILA VORARAM CHOUDHARY

Key dates

7 months past promisethis monthRegisteredJan 2020PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Jan 2020
  • Promised completion30 Mar 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed258 files

Current status

64%69 of 108 units booked
86.7%Work done, per cost certificate

Figures as on 11 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA11936036
BUILDING BNA11936036
BUILDING CNA11936036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 11 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING A64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered3
Open Space6
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A123
BUILDING B123
BUILDING C123

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,791 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
UMESH GULAB SATHEPune (M Corp.)Pune
Sathe Umesh GulabPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI6775.24
Proposed, not sanctioned4,140 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHANORI PUNE 411015
Estimated costRs 33.20 cr
Cost incurredRs 28.80 cr
Work done86.74%
BuildingWingEstimatedIncurred
BUILDING ANARs 9.41 crRs 8.16 cr
BUILDING BNARs 9.41 crRs 8.16 cr
BUILDING CNARs 9.41 crRs 8.16 cr
-NARs 4.98 crRs 4.32 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSOMNATH KERUR
EngineerNilesh Dighe & Associates
EngineerPravin Ramjibhai Rathod
Chartered AccountantSACHIN SHARMA
Chartered AccountantBHARAT SHAH
Chartered AccountantAgarwal Sarawgi and Associates
Chartered AccountantPatel and Sharma Chartered Accountants
PartnerRole in project
AAIJI REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Sep 2023

Documents filed258

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 258 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 .pdf11 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.pdf11 Feb 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf11 Feb 2026
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: from 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: from 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: from 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: FORM 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: FORM 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: form 1.pdf16 Dec 2025
Form 2File: FORM 2.pdf16 Dec 2025
Form 3File: form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: form 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: FORM 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: form 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: FORM 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: form 1.pdf16 Dec 2025
Form 2File: form 2.pdf16 Dec 2025
Form 3File: FORM 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf16 Dec 2025
Form 1File: form 1.pdf16 Dec 2025

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AAIJI PINK CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SATHE VASTI13,700+ in Pune

2 kmAAIJI PINK CITYCompleted 52Lapsed / revoked 23Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 139 registered projects within 2 km.

Builder: AAIJI REALTY

AAIJI REALTY has 1 registration on MahaRERA, including AAIJI PINK CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that AAIJI PINK CITY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AAIJI PINK CITY is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AAIJI PINK CITY?

The registered promoter entity is AAIJI REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AAIJI PINK CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AAIJI PINK CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AAIJI PINK CITY?

The professionals named in the filing: Architect: SOMNATH KERUR; Engineer: Nilesh Dighe & Associates; Engineer: Pravin Ramjibhai Rathod; Chartered Accountant: SACHIN SHARMA; Chartered Accountant: BHARAT SHAH; Chartered Accountant: Agarwal Sarawgi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AAIJI PINK CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AAIJI PINK CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AAIJI PINK CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.